This page is currently under construction and certainly incomplete!

If you miss a project please mail to me.

Many links are still void (marked red).


HERA-B

SLT / TLT / 4LT / DAQ Projects


Services

Coordination

First Level Trigger (Dominik Ressing)
Second Level Trigger (Mike Medinnis)
Third and Fourth Level Trigger Farm (Andreas Gellrich)
Run '97, Run & Slow Control (John Zweizig)
DAQ Hardware and Data Path (Dominik Ressing)

Maintenance

(responsible: not yet defined)

SHARC Bug tracing (Joerg Luedemann)
Source Code Management (Samim Erhan)
DAQ Linux Cluster (Klaus Ehret)
DAQ VME Lynx Cluster (Klaus Ehret)


General Hardware

(responsible: Dominik Ressing)

VME crates (Rainer Wurth)
SHARC Cluster (Rainer Wurth)
Fast Control System (Thomas Fuljahn)


Data path

(responsible: Dominik Ressing) view Hardware Architecture or Software Architecture

VME based SHARC Readout (Joerg Luedemann)
Second Level Buffer Manager (Bertram Rensch, John Zweizig)
Event Controller (Bertram Rensch, John Zweizig)
Routing Switch (Mike Medinnis)
Event Buffer Manager (John Zweizig)
SHARC to PCI interface driver (Iosif Legrand)


Sensors, Field Busses, Power Supplies,...

(responsible: not yet defined)

CAN bus driver (Georg Leffers)
Remote VME crate control (Victor Zerkin)
High Voltage System and Controller (Chrisobal Padilla)


Run & Slow Control

(responsible: John Zweizig)

State Machine Control Package SMC (Vladimir Rybnikov)
Process Control and Configuration (John Zweizig)
Fast Control System Server (Thomas Fuljahn)
Component Monitor and Control Template (John Zweizig)
Diagnostic tool Template (John Zweizig)


Utilities

(responsible: Dominik Ressing)

template for project description (Dominik Ressing)
Message System RPM (John Zweizig)
SHARC Kernel Library (Joerg Luedemann)
SHARC Board Controller and tools (Joerg Luedemann)
Table Data Base (Thomas Kihm)
Table Data Base Display and Editor (Georg Leffers)
Histogramming (Thomas Kihm)


SLT specific

(responsible: Mike Medinnis)

SHARC to PCI Interface (Karl-Heinz Sulanke)
SLT and TLT nodes and Installation (Mogens Dam)
PC controller on CAN (Mogens Dam)
Level 2 Simulation and Development Frame (Mike Medinnis)
Slicer (Mike Medinnis)
FLT Refit (Samin Erhan)
Magnet Tracking (Stefania Xella)
Silicon Tracking (Soeren Schmidt)
Vertexing (NN)
SLT in 1997 (Peter Kreuzer)


TLT & L4 specific

(responsible: Andreas Gellrich)

Level 4 nodes and Installation (Andreas Gellrich)
Data Archival (Andreas Gellrich)


Edited by Dominik Ressing

Last change 9-Jan-2009, Ursula.Djuanda(at)desy.de