Module p1-5-14 ================ This module was produced in DUBNA. You can access the [1]complete Mass-production data([2]eps file) OUTPUT FROM CHECKDBS PROGRAM ============================ ---> INPUT file install-dbs/p1-5-14 ---> Number of valid lines read: 21 ---> line 2: MOD NAME L9M0052 ---> line 3: MOD TYPE pc-101 ---> line 4: MOD LAYER double ---> line 19: T 1 XXXXXXXXXXXXXXXX ---> line 20: T 2 XXXXXXXXXXXXXXXX ---> line 21: T 3 XXXXXXXXXXXXXXXX ---> line 22: T 4 XXXXXXXXXXXXXXXX ---> line 23: T 5 XXXXXXXXXXXXXXXX ---> line 24: T 6 XXXXXXXXXXXXXXXX ---> line 25: T 7 XXXXXXXXXXXXXXXX ---> line 26: T 8 XXXXXXXXXXXXXXXX ---> line 27: T 9 XXXXXXXXXXXXXXXX ---> line 28: B 1 ................ ---> line 29: B 2 ................ ---> line 30: B 3 ................ ---> line 31: B 4 ................ ---> line 32: B 5 ................ ---> line 33: B 6 ................ ---> line 34: B 7 ...XCXXXXXXXXXXX ---> line 35: B 8 XXXXXXXXXXXXXXXX ---> line 36: B 9 ..XXXXXXXXXXXXXX ---> MP module name is: L9M0052 ---> MP module type is: pc-101 ---> MP module layer is: double DRAWING of the module from TOP =============================== X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X/X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X/X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X DRAWING of the module from BOTTOM ================================= X X X X X X X X . . . . . . . . . . . . . . . . . . . . . . . . X X X X X X X . . . . . . . . . . . . . . . . . . . . . . . . . X X X X X X X . . . . . . . . . . . . . . . . . . . . . . . . .\. X X X X X X c . . . . . . . . . . . . . . . . . . . . . . . . .\. SIGNAL CONNECTOR ASSIGNMENT =========================== p1-5-14-01 (001-016) BOT 1 p1-5-14-01 (017-032) BOT 2 p1-5-14-01 (033-048) BOT 3 p1-5-14-01 (049-064) BOT 4 p1-5-14-01 (065-080) BOT 5 p1-5-14-01 (081-096) BOT 6 p1-5-14-01 (097-102) BOT 7 FULL DATABASE FILE ================== *============================================================================== MOD NAME L9M0052 MOD TYPE pc-101 MOD LAYER double *============================================================================== * Code definition * * . = Channel ok * W = Channel Warm (looks it will recover) * H = Channel Hot * D = Channel Dead (no signal seen) * C = Channel not Checked * X = Channel not eXisting * *============================================================================== * 1 4 8 12 16 * | | | | | *============================================================================== T 1 XXXXXXXXXXXXXXXX T 2 XXXXXXXXXXXXXXXX T 3 XXXXXXXXXXXXXXXX T 4 XXXXXXXXXXXXXXXX T 5 XXXXXXXXXXXXXXXX T 6 XXXXXXXXXXXXXXXX T 7 XXXXXXXXXXXXXXXX T 8 XXXXXXXXXXXXXXXX T 9 XXXXXXXXXXXXXXXX B 1 ................ B 2 ................ B 3 ................ B 4 ................ B 5 ................ B 6 ................ B 7 ...XCXXXXXXXXXXX B 8 XXXXXXXXXXXXXXXX B 9 ..XXXXXXXXXXXXXX *============================================================================== * * Module Test Results 08/07/99 * ================== * * Module Name: L9M0052 (Production) * ----------- p1-5-14 (Installation) * * Module Description: PC- 5mm p-beam +y overlap (5d27spec), 1 x 102 channels * ------------------ * Signal cables are numbered as follows: * * View from Top Bottom * /---------/ \---------\ * / / \ 6 4 2 \ * / / \ 7 5 3 1 \ * /=========/ base pl. \=========\ * 1 -> 16 16 <- 1 Wires in signal cable * * HV cables are numbered as follows: * * View from Top Bottom * /---------/ \---------\ * / / \ 8 7 6 5 \ * / / \ 4 3 2 1 \ * /=========/ base pl. \=========\ * * HV Training Results: * ------------------- * Training was done in ArCO2 50:50 at 1850 V. * Dark current in all groups <= 640 nA before training. * <= 50 nA after training. * * Final vertical HV test: * - total dark current 3000 -> 720 nA in 2 h * * Signal Test Results: * ------------------- * Signal testing means looking for cosmics with Hermes preamp. * Fully re-tested in HH. * All remaining wires except the following show good signals: * * Cable Wire Result * ------------------------------- * * Cable 8 only for testing dangling wires -> removed after test. * * Summary: * ------- * 102 wires total * 1 wire not checked References 1. http://herab.jinr.ru/chambers/l9m0052.html 2. http://herab.jinr.ru/chambers/l9m0052.eps ========= Module p1-5-14 (information from HERA-B hall) ====================== For module sector p1-5-14-01 (+y), ASDs are -p1-5-01-[27,33] Status of channels for each ASD: Online: -p1-5-01-27 ................ -p1-5-01-28 HHHHHHHHHHHHHHH. -p1-5-01-29 .HHH.HH.HHHHHH.. -p1-5-01-30 ................ -p1-5-01-31 ................ -p1-5-01-32 HHHHHHHHHHHHHHH. -p1-5-01-33 HHHXHXXXXXXXXXXX (1234567890123456) Mass production: -p1-5-01-27 ................ -p1-5-01-28 ................ -p1-5-01-29 ................ -p1-5-01-30 ................ -p1-5-01-31 ................ -p1-5-01-32 ................ -p1-5-01-33 ...XCXXXXXXXXXXX (1234567890123456) Installation: -p1-5-01-27 ................ -p1-5-01-28 ................ -p1-5-01-29 ................ -p1-5-01-30 ................ -p1-5-01-31 ................ -p1-5-01-32 ................ -p1-5-01-33 ................ (1234567890123456) ASD distribution for module -p1-5-14, sector 01, +y +--------------+--------------+--------------+--------------+ | -p1-5-01-33 | -p1-5-01-31 | -p1-5-01-29 | | | -p1-2-28-C09 | -p1-2-28-C07 | -p1-2-28-C05 | | +--------------+--------------+--------------+--------------+ | -p1-5-01-32 | -p1-5-01-30 | -p1-5-01-28 | -p1-5-01-27 | | -p1-2-28-C08 | -p1-2-28-C06 | -p1-2-28-B09 | -p1-2-28-B08 | +--------------+--------------+--------------+--------------+ -----------------------------------------------------------------------------