FLT-Related Talks and Transparencies



 

2003

  • M. Nörenberg
Der HERA-B FLT während der Datennahme 2002/2003 DPG Conference Aachen (March 2003).

2001

  • Imma Riu
Commissioning of the Hera-B First Level Trigger IEEE NSS/MIC Conference (Nov. 2001) in San Diego
  • Imma Riu
Flt Status Report HERA-B week (Feb. 2001)
  • J. Flammer
EcalSIM Status & Comparison with the hardware (Color version)  (B&W version for printing)  HERA-B week (Feb. 2001)
  • H. Fleckenstein
Determining the FLT efficiency from data HERA-B week (Feb. 2001)
  • D. Ressing
Flt efficienncy summary HERA-B week (Feb. 2001)
  • D. Ressing
Introduction to flt simulation HERA-B week (Feb. 2001)
  • D. Ressing
Estimation of flt latency losses HERA-B week (Feb. 2001)
  • D. Ressing
Manpower situation of Flt HERA-B week (Feb. 2001)

2000

  • J. Flammer
FLT Status Report Okt 2000 (landscape foils)  (portrait foils)  HERA-B week (Okt. 2000)
  • C. Rothe
Erfahrungen mit der optischen Datenübertragung mit hoher Rate beim HERA-B Experiment  DPG Conference Dresden (Mar. 2000)
  • H. Fleckenstein
Das Leistungsverhalten der Track Finding Unit (TFU) des First Level Triggers (FLT)  DPG Conference Dresden (Mar. 2000)
  • J. Flammer
TPU Pretrigger Lookuptables  HERA-B week (Feb. 2000)
  • J. Flammer
Ecal Pretrigger Lookuptables  HERA-B week (Feb. 2000)
  • E. Gerndt
FLT Hardware Status  HERA-B week (Feb. 2000)

1999

  • E. Gerndt
The HERA-B First Level Trigger  in 1999 Instr99 (Nov. 1999) in Hamamatsu, Japan. 
  • F. Ratnikov
Status of the FLT in October 1999 HERA-B week (October 1999). 
  • J. Flammer
EcalSim: Overview and Status HERA-B week (October 1999). 
  • M. Nörenberg
Status of FLTSIM HERA-B week (October 1999). 
  • J. Flammer
The HERA-B First Level Trigger - An Introduction DESY Summer School (Aug. 1999). 
(Ghostview may not work properly (talk has 22 pages) but the talk can be printed ...) 
  • M. Bruinsma
The HERA-B Trigger Chain (A0 Poster)
(A3 Poster)
SLAC Summer Institute (July 1999)
in Stanford, California.
  • J. Flammer
The HERA-B First Level Trigger (A0 Poster)
(A1 Poster) (A2 Poster) (A3 Poster) (A4 Poster)
SLAC Summer Institute (July 1999)
in Stanford, California.
  • E. Gerndt:
The First Level Trigger of HERA-B in 1999  BEAUTY'99 (June, 21-25, 1999) in Bled, Slovenia.
  • H. Itterbeck
The Status and first experiences with the First Level Trigger of HERA-B  IEEE RT99 (June, 14-18, 1999) in Santa Fe, NM, USA.
  • E. Gerndt
Status May 1999
  • J. Flammer
  Simulation des First Level Triggers von Hera-B zur Untersuchung der Triggerperformance DPG Conference Heidelberg (March 1999).
  • M. Nörenberg
Objektorientierte Simulation der Trigger Decision Unit des HERA-B FLT DPG Conference Heidelberg (March 1999).
  • F.Ratnikov
Issues concerning possible ORing for MX1 pixel chamber HERA-B week (February 1999). 
(better to be printed out)
  • J. Flammer
Analysis of the TPU Performance HERA-B week,(February 1999). 
  • E. Gerndt
Status of the FLT in January 1999  PRC referee meeting. 

1998

  • E. Gerndt
Status of the FLT in October 1998  HERA-B week (Oct. 1998).
  • N. van Remortel
The First Level Trigger for the HERA-B experiment:  HERA-B Summer Student'98 seminar (Sept. 1998)
  • F. Ratnikov
The First Level Trigger Simulation for the HERA-B experiment CHEP'98 (Sept. 1999)
  • E. Gerndt
Status of the FLT in June 1998  HERA-B week (June 1998 )
  • D. Kahnert
Status of the OTR- and MUON-Mapping 6/98 HERA-B week (June 1998)
  • E. Gerndt
Status of the FLT in February 1998 HERA-B week (Feb. 1998), 
see the status of the FLT Processor Boards separately here
  • E. Gerndt
An estimate of the Latency of the HERA-B FLT HERA-B week (Feb. 1998)

1997

  • E. Gerndt
Status of the FLT in October 1997 HERA-B week (Oct .1997)
  • F. Ratnikov
Concept of the FLT for HERA-B RealTime'97 (Sept. 1997)
  • F. Ratnikov
HERA-B Run'98 FLT performance HERA-B week (June 1997)
  • F. Ratnikov
FLT software status HERA-B software meeting (March 1997)
  • F. Ratnikov
FLT studies HERA-B week (Feb.1997)

1996

  • F. Ratnikov
FLT kinematics reconstruction  HERA-B week (Oct. 1996)
  • F. Ratnikov
Combined pretriggers  Zeuthen HERA-B week (June 1996)
  • F. Ratnikov
FLT muon performance:  HERA-B week (March 1996)

1995

  • F. Ratnikov
FLT summary Rome HERA-B meeting (Oct. 1995)


BACK


Concerned persons:

Joachim Flammer,
Last modified:  by J.F.