HERA-B Notes
   - - - -

A Reload will NOT [!] update this list!
Use this link!

ID Subgrp. Author Title
02-009 Technical Board J. Spengler et al. Coll. Meeting, Jan. 21-25, 2002, Technical Review, Part 3
02-008 Technical Board J. Spengler et al. Coll. Meeting, Jan. 21-25, 2002, Technical Review, Part 2
02-007 Technical Board J. Spengler et al. Coll. Meeting, Jan. 21-25, 2002, Technical Review, Part 1
02-006 Outer Tracker H. Kapitza et al. Coll. Meeting, Jan. 21-25, 2002, OTR Results from 2001 Data
02-005 Physics HERA-B Collaboration Measurement of the BBbar production cross section at HERA-B with the 2000 data sample
02-004 Physics M. Buchler Measurement of Differential Cross Sections in J/Psi->mu+mu-: Analysis Note 1
02-003 Physics D. Samtleben Reconstruction of J/psi ->e+e- and Determination of the Total J/psi Cross Section
02-002 Software T. Glebe Pattern - High Level Tools for Data Analysis
02-001 Software T. Glebe BEE - Compilation and Environment
01-144 Physics J. Carvalho Cross-section Compilation for the Measurement of the Luminosity at HERA-B
01-143 Software I. Gorbounov Do we have a Ghost Problem in J/psi->mu+mu- Decays?
01-142 Trigger H. Fleckenstein Acceptance and Efficiency of the First Level Trigger
01-141 Technical Board J. Spengler et al. Technical Board Meeting, Nov 28, 2001
01-140 Technical Board J. Spengler et al. Special Technical Board Meeting, Nov. 16, 2001
01-139 Technical Board J. Spengler et al. Technical Board Meeting, Oct. 31, 2001
01-138 Software T. Glebe Clue - The BEE Event Model Library
01-137 Tracking D. Emeliyanov, I. Gorbounov, I. Kisel OTR/ITR-CATS: Tracking Based on Cellular Automaton and Kalman Filter
01-136 Software T. Glebe BEE - Interfaces and Design Issues
01-135 Outer Tracker A. Schreiner Test of Devices with Capacity-based Sensors for Measurement of low Water Contents
01-134 Software T. Glebe SMatrix - A high Performance Library for Vector/Matrix Calculation and Vertexing
01-133 Physics M. Zavertiaev Coll. Meeting, Sept. 24-28, 2001, The V0 Cross Section Evaluation
01-132 General F. Eisele Coll. Meeting, Sept. 24-28, 2001, Report from the Collab. Board
01-131 Physics Z. Zheng Coll. Meeting, Sept. 24-28, 2001, Study on Charmonium at HERA-B
01-130 Physics A. Schwartz Coll. Meeting, Sept. 24-28, 2001, Open Charm Physics after 2002
01-129 Physics M. Danilov Coll. Meeting, Sept. 24-28, 2001, Is HERA-B still Beautiful?
01-128 Physics T. Bauer Coll. Meeting, Sept. 24-28, 2001, p-A Reactions at HER-B
01-127 Physics M. Medinnis Coll. Meeting, Sept. 24-28, 2001, Priorities for 2002
01-126 Physics P. Buchholz Coll. Meeting, Sept. 24-28, 2001, Possibilities for open Charm Physics on 2002
01-125 Physics A. Zoccoli Coll. Meeting, Sept. 24-28, 2001, Summary of Physics Analysis on 2000 Data+Task list for 2002
01-124 Physics R. Spighi Coll. Meeting, Sept. 24-28, 2001, X_F and P_T distributions of J/psi
01-123 Physics M. Mevius Coll. Meeting, Sept. 24-28, 2001, B to J/psi cross section ratio (e+e- and mu+mu-)
01-122 Physics M. Buchler Coll. Meeting, Sept. 24-28, 2001, J/Psi working group, Sept. Status of Diff. X-Sections from J/psi -> Mu+Mu-
01-121 Farm J. Hernandez Coll. Meeting, Sept. 24-28, 2001, Reprocessing & MC Production
01-120 Tracking F. Sanchez Coll. Meeting, Sept. 24-28, 2001, Alignment Status
01-119 Tracking W. Hulsbergen Coll. Meeting, Sept. 24-28, 2001, Track Reconstruction, Status and Plans
01-118 Technical Board J. Spengler et al. Coll. Meeting, Sept. 24-28, 2001, Technical Review, Part 2
01-117 Technical Board J. Spengler et al. Coll. Meeting, Sept. 24-28, 2001, Technical Review, Part 1
01-116 Physics D. Collins, D. Goulart, A. Schwartz Triggering on D0->K-pi+ Decays with a High-pt Trigger
01-115 Outer Tracker J. Fourletova, S. Fourletov, A. Spiridonov Simulation of Honeycomb Drift Cells
01-114 DAQ B. Schwingenheuer Electronic commissioning experience at Hera-B
01-113 Software J.-G. Shiu, R. Harr Pointing Constrained Vertex Fit in Grover
01-112 Muon R. Harr The MUON Pixel Mapping Board
01-111 Muon M. Danilov, M. Titov et al. Institute of Theoretical and Experimental Physics Preprint 15-01
01-110 Software T. Glebe Cluearte 0-42 - The ARTE Interface to BEE
01-109 Trigger V. Balagura, M. Danilov First Level Trigger Based on High-pt-ECAL and High-pt-MUON Coincidences
01-108 Physics U. Husemann First Results of MC Multiplicity Tuning
01-107 Muon B.Schwenninger Muon Pretrigger: Online Software and Performance Studies
01-106 DAQ B. Schwingenheuer Documentation for the HERA-B Fast-Control-System
01-105 Trigger H. Fleckenstein Latency and Rate Studies for the TFU Network of the First Level Trigger
01-104 Physics A.J. Schwartz A Hera Proton-Antiproton Collider ? First Thoughts
01-103 RICH D. Dujmic Implementation of Unified Algorithm for RICH
01-102 Physics T. Hott Coll. Meeting/Copenhagen, June 19-22, 2001, Data Quality
01-101 Trigger B. Fominykh Coll. Meeting/Copenhagen, June 19-22, 2001, Plans for MUON Efficiency Studies with SLT
01-100 General K. Ehret Coll. Meeting/Copenhagen, June 19-22, 2001, Recommissioning & Run 01/02
01-099 General F. Eisele Coll. Meeting/Copenhagen, June 19-22, 2001, Report from the Coll. Board
01-098 Physics A. Somov Coll. Meeting/Copenhagen, June 19-22, 2001, Luminosity Determination
01-097 Physics S. Takach Coll. Meeting/Copenhagen, June 19-22, 2001, Updates on Measuring the shapes of the J/psi production spectra and on measuring the BR(D-->mu mu) from the 2000 data
01-096 Physics M. Zavertiaev Coll. Meeting/Copenhagen, June 19-22, 2001, Kshort Analysis
01-095 Physics A. Zoccoli Coll. Meeting/Copenhagen, June 19-22, 2001, Status of B cross Section Analysis
01-094 Physics M. Mevius Coll. Meeting/Copenhagen, June 19-22, 2001, B Cross Section, Electron Channel
01-093 Physics M. Villa Coll. Meeting/Copenhagen, June 19-22, 2001, Electron Identification and Backgrounds to Electrons
01-092 Physics R. Vogt Coll. Meeting/Copenhagen, June 19-22, 2001, Heavy Quark Production Beyond Next-to-Leading Order
01-091 Physics I. Arino Coll. Meeting/Copenhagen, June 19-22, 2001, Measurement of Hadron Fractions in Proton-Nucleus Interactions at 920 GeV, using the HERA-B Detector
01-090 Physics M. Schmelling Coll. Meeting/Copenhagen, June 19-22, 2001, Status of the Single-Lepton-Analysis
01-089 Physics W. Gradl Coll. Meeting/Copenhagen, June 19-22, 2001, Prospects of HERA-B in Drell-Yan Physics
01-088 Physics O. Igonkina Coll. Meeting/Copenhagen, June 19-22, 2001, Determinatio of Fraction fo J/psi produced via Xc Channel
01-087 Physics M. Bruinsma Coll. Meeting/Copenhagen, June 19-22, 2001, Nuclear Effects in J/psi Production
01-086 Software V. Amaral Coll. Meeting/Copenhagen, June 19-22, 2001, Studies for Optimisation of Data Analysis Queries
01-085 Farm J. Hernandez Coll. Meeting/Copenhagen, June 19-22, 2001, Reprocessing Status and Plans
01-084 RICH P. Krizan Coll. Meeting/Copenhagen, June 19-22, 2001, RICH Particle ID for 2002
01-083 Software S. Aplin Coll. Meeting/Copenhagen, June 19-22, 2001, HERA-B Monte Carlo Status
01-082 VDET M. Braeuer Coll. Meeting/Copenhagen, June 19-22, 2001, Vertex Resolution Studies
01-081 Tracking A. Gorisek, S. Korpar Coll. Meeting/Copenhagen, June 19-22, 2001, Global Alignment
01-080 Tracking T. Zeuner Coll. Meeting/Copenhagen, June 19-22, 2001, Internal Alignment
01-079 Software M. Medinnis Coll. Meeting/Copenhagen, June 19-22, 2001, Pattern Recognition Comparison
01-078 Outer Tracker A. Lanyov Coll. Meeting/Copenhagen, June 19-22, 2001, Summary of Studies of OTR Tracking Efficiency
01-077 Outer Tracker W. Hulsbergen Coll. Meeting/Copenhagen, June 19-22, 2001, Hit Efficiency of the Outer Tracker
01-076 Technical Board J. Spengler Coll. Meeting/Copenhagen, June 19-22, 2001, Technical Review
01-075 Farm A. Gellrich The Online Reconstruction Farm of the HERA-B Experiment, Part 2
01-074 Farm A. Gellrich The Online Reconstruction Farm of the HERA-B Experiment, Part 1
01-073 RICH K. Reeves Occupancy Studies at HERA-B
01-072 Physics V. Vagnoni et al. Determination of Correction Factors to the Online interaction Rate and Observation of Track Multiplicty A-Dependence using ECAL and Target Hodoscope Measurements
01-071 Physics I. Arino, L. Garrido Measurement of Hadron Fractions in Minimum Bias Events
01-070 Software I. Abt Evaluation of Pattern Recognition Packages for the HERA-B Main Tracking System
01-069 Physics Th. Lohse Charmonium Lifetime and Nuclear Suppression
01-068 Physics Th. Lohse Charmonium Production in Nuclear Matter
01-067 Software O. Igonkina Implementatio of CSM and COM models for J/Psi production in PYTHIA
01-066 RICH R. Schwitters Unified Approach to Particle Identification Using the Hera-B RICH
01-065 Outer Tracker A. Belkov, N. Karpenko, A. Lanyov, A. Spiridonov Study the Track-Finding Efficiency of the OTR PC Chambers
01-064 General The HERA-B Collaboration Status and Plans for 2001/2
01-063 PRC D. Ressing Status of the FLT and Trigger Rates
01-062 Software M.-A. Pleier Cloneremove V1.0
01-061 Outer Tracker A. Schreiner Study of the Eccentricity and Wire Tension Influences on the Chamber Operation
01-060 Inner Tracker C. Krauss et al. Inner Tracker Performance in 2000, April 24th, 2001
01-059 Trigger M. Adams Study of Hit Multiplicities
01-058 Muon Y. Gilitski et al. New Muon Chamber Readout Electronics, April 20th, 2001
01-057 Trigger M. Adams Study of the Muon Pretrigger Acceptance for Muon Tracks from J/\psi \to \mu^{+} \mu^{-}
01-056 General B. Lewendel Status and News of Offline Computing Infrastructure
01-055 Trigger J. Flammer Track Parameter Unit - Documentation, March 27, 2001
01-054 Software J. Flammer EcalSIM - The Ecal Pretrigger Simulation, |Feb. 13, 2001
01-053 Physics A. Zoccoli et al. Analysis Meeting, March 20, 2001
01-052 Trigger D. Ressing, P. Kreuzer SLT Efficiencies: FLT Past and Future
01-051 Physics M. Schmelling Coll. Meeting, Feb. 19-23, 2001, Status of Single-Lepton Analysis
01-050 Physics M. Mevius Coll. Meeting, Feb. 19-23, 2001, Report Status of B -> J/psi(e+e-)
01-049 Physics O. Igonkina Coll. Meeting, Feb. 19-23, 2001, Chi_c -> J/psi + gamma
01-048 Physics B.A. Petersen Coll. Meeting, Feb. 19-23, 2001, J/psi -> mu+ mu-
01-047 Physics M.Buchler, P.Karchin Coll. Meeting, Feb. 19-23, 2001, J/psi Cut Signficance Measurements
01-046 Physics J. Hernandez Coll. Meeting, Feb. 19-23, 2001, Reprocessing Status
01-045 Physics A. Zoccoli Coll. Meeting, Feb. 19-23, 2001, Status of the Analysis
01-044 Physics A. Schwartz Coll. Meeting, Feb. 19-23, 2001, Charm Physics at Hera-B: a future path
01-043 Physics A. Zoccoli Coll. Meeting, Feb. 19-23, 2001, Physics Program in 2001/2002
01-042 Physics R. Vogt Coll. Meeting, Feb. 19-23, 2001,The Nucl. Dependence of Quarkonium Prod.
01-041 General J.D. Hansen Coll. Meeting, Feb. 19-23, 2001, Report Coll. Board
01-040 General M. Medinnis Coll. Meeting, Feb. 19-23, 2001, Spokesman's Report
01-039 Physics F. Eisele Coll. Meeting, Feb. 19-23, 2001, How many Psi's per life hour can ...
01-038 ECAL M. Bruschi Coll. Meeting, Feb. 19-23, 2001, Electron Pretrigger With Bremsstrahlung Request
01-037 Trigger D. Ressing Coll. Meeting, Feb. 19-23, 2001, FLT Manpower and Schedule
01-036 Trigger I. Riu Coll. Meeting, Feb. 19-23, 2001, FLT Status Report
01-035 Software M. Medinnis Coll. Meeting, Feb. 19-23, 2001, Sofware Organisation
01-034 General B. Schwingenheuer Coll. Meeting, Feb. 19-23, 2001, Summary of Post-doc + Guest Scientists + PhD Students meeting
01-033 Software F. Sanchez Coll. Meeting, Feb. 19-23, 2001, Alignment
01-032 Software H. Albrecht Coll. Meeting, Feb. 19-23, 2001, Status of Particle Identification
01-031 Tracking S. Masciocchi Coll. Meeting, Feb. 19-23, Tracking Reco.
01-030 Trigger P. Kreuzer Coll. Meeting, Feb. 19-23, 2001, SLT Status
01-029 Technical Board J. Spengler et al. Coll. Meeting, Feb. 19-23, 2001, Technical Review, Part 4
01-028 Technical Board J. Spengler et al. Coll. Meeting, Feb. 19-23, 2001, Technical Review, Part 3
01-027 Technical Board J. Spengler et al. Coll. Meeting, Feb. 19-23, 2001, Technical Review, Part 2
01-026 Technical Board J. Spengler et al. Coll. Meeting, Feb. 19-23, 2001, Technical Review, Part 1
01-025 Physics K. Ehret et al. Coll. Meeting, Feb. 19-23, 2001, Lumi Determination Meeting
01-024 Trigger D. Ressing et al. Coll. Meeting, Feb. 19-23, 2001, Trigger Review Meet., Part3
01-023 Trigger D. Ressing et al. Coll. Meeting, Feb. 19-23, 2001, Trigger Review Meet., Part2
01-022 Trigger D. Ressing et al. Coll. Meeting, Feb. 19-23, 2001, Trigger Review Meet., Part1
01-021 Physics M. Schmelling et al. Coll. Meeting, Feb. 19-23, 2001, Single Lepton Anal. Meet.
01-020 Muon P. Karchin et al. Coll. Meeting, Feb. 19-23, 2001, Muon Group Meeting
01-019 Outer Tracker U.Uwer et al. Coll. Meeting, Feb. 19-23, 2001, OTR Meeting, Part II
01-018 Outer Tracker U.Uwer et al. Coll. Meeting, Feb. 19-23, 2001, OTR Meeting, Part I
01-017 DAQ P. Kreuzer et al. Coll. Meeting, Feb. 19-23, 2001, SLT + DAQ Group Meeting, Part II
01-016 DAQ P. Kreuzer et al. Coll. Meeting, Feb. 19-23, 2001, SLT + DAQ Group Meeting, Part I
01-015 Target K. Ehret et al. Coll. Meeting, Feb. 19-23, 2001, Target Group Meeting
01-014 Tracking S. Masciocchi et al. Coll. Meeting, Feb. 19-23, 2001, Tracking Meeting, Part II
01-013 Tracking S. Masciocchi et al. Coll. Meeting, Feb. 19-23, 2001, Tracking Meeting, Part I
01-012 Physics P. Kreuzer et al. Coll. Meeting, Feb. 19-23, 2001, J/psi-mumu work. group
01-011 Talks U. Uwer Status and Commissioning Results from HERA-B
01-010 Tracking M. Dressel Comparison of Track Distributions in Data and MC for minium bias Events
01-009 ECAL S. Shuvalov et al. Numerical Estimate of Calorimeter
01-008 Physics C. Padilla et al. Single Lepton Trigger meeting, 6 Feb. 2001
01-007 Outer Tracker O. Barsukova, W. Hulsbergen, A. Lanyov Check-Up and Update of the OTR Cabling and Geometry
01-006 Software T. Glebe SmartPointer
01-005 Software Ar. Belkov, A. Lanyov, A. Spiridonov Relative alignment of the OTR double layer modules
01-004 Muon M. Danilov et al. Aging Tests of the Proportional Wire Chambers
01-003 Outer Tracker G. Bohm, A. Schreiner Correlation Report
01-002 Software T. Glebe GCombiner - Class Reference Manual
01-001 Software T. Glebe GCombiner 1.0
00-192 RICH P. Krizan et al. RICH Meeting Barcelona Nov. 2-3, 2000, Part III
00-191 RICH P. Krizan et al. RICH Meeting Barcelona Nov. 2-3, 2000, Part II
00-190 RICH P. Krizan et al. RICH Meeting Barcelona Nov. 2-3, 2000, Part I
00-189 Software T. Glebe GRelation1.12 - Reference manual
00-188 Software T. Glebe GRelation1.12 - A universal concept for object relations
00-187 General B. Schmidt Status of the HERA-B Experiment
00-186 Physics A. Schwartz Triggering on Charm Decays with a Single-Lepton Trigger
00-185 Farm A. Gellrich A Large Linux-PC Farm for Onl. Event Rec. Data Man. at HERA-B
00-184 Farm J. Kretzschmar, U. Schwanke Compression of Rhp Histograms for Network Transfer
00-183 Physics M. Zavertiaev HERA-B Picture gallery. Signals observed with the Muon Data Set
00-182 Physics I. Kisel et al. Test of Vertex Reconstruction and fitting Algorithms on $J/\psi\rightarrow\mu^+\mu^-$ Data
00-181 Target C. van Eldik et al. Target Meeeting, June 15th, 2000
00-180 PRC M. Medinnis et al. PRC Referee Meeting, Oct. 18th, 2000, Part IV
00-179 PRC M. Medinnis et al. PRC Referee Meeting, Oct. 18th, 2000, Part III
00-178 PRC M. Medinnis et al. PRC Referee Meeting, Oct. 18th, 2000, Part II
00-177 PRC M. Medinnis et al. PRC Referee Meeting, Oct. 18th, 2000, Part I
00-176 Muon Jing-Ge Shiu MUON Pixel Chamber Study
00-175 Software Th. Glebe Vt++ Version 1.0
00-174 Target K. Ehret et al. Target Group Meeting, Sept. 18th, 2000
00-173 Muon S. Nam et al. Coll. Meeting, Oct.2nd - 6th, 2000, Muon Parallel Meet. Part 3
00-172 Muon S. Nam et al. Coll. Meeting, Oct.2nd - 6th, 2000, Muon Parallel Meet. Part 2
00-171 Muon S. Nam et al. Coll. Meeting, Oct.2nd - 6th, 2000, Muon Parallel Meet. Part 1
00-170 General M. Medinnis Coll. Meeting, Oct.2nd - 6th, 2000, Plans, Report
00-169 General J.D. Hansen Coll. Meeting, Oct.2nd - 6th, 2000, Report Coll. Board
00-168 Farm U. Schwanke Coll. Meeting, Oct.2nd - 6th, 2000, Online Reco. Farm: Status and Plans
00-167 DAQ V. Rybnikov Coll. Meeting, Oct.2nd - 6th, 2000, DAQ status and plans
00-166 Trigger T. Nunez Coll. Meeting, Oct.2nd - 6th, 2000, SLT Activities and Prospects
00-165 ECAL S. Shuvalov Coll. Meeting, Oct.2nd - 6th, 2000, ECAL Status and Plans
00-164 TRD V. Saveliev Coll. Meeting, Oct.2nd - 6th, 2000, Transition Radiation Detector
00-163 RICH LL. Garrido Coll. Meeting, Oct.2nd - 6th, 2000, The HERA-B RICH
00-162 Target M. Symalla Coll. Meeting, Oct.2nd - 6th, 2000, Target Status
00-161 Trigger J. Flammer Coll. Meeting, Oct.2nd - 6th, 2000, HERA-B FLT Status Report
00-160 Trigger P. Buchholz Coll. Meeting, Oct.2nd - 6th, 2000, Muon Pretrigger System Status Report
00-159 Trigger M. Bruschi Coll. Meeting, Oct.2nd - 6th, 2000, ECAL Pretrigger
00-158 High-p_t A. Schwartz Coll. Meeting, Oct.2nd - 6th, 2000, Status of oHPT Chambers
00-157 Trigger V. Popov Coll. Meeting, Oct.2nd - 6th, 2000, HPT pretrigger logic system
00-156 High-p_t M. Danilov Coll. Meeting, Oct.2nd - 6th, 2000, Status of High-Pt Trigger
00-155 Muon Yu. Zaitsev Coll. Meeting, Oct.2nd - 6th, 2000, Muon System, Status & Plans
00-154 Outer Tracker M. Walther Coll. Meeting, Oct.2nd - 6th, 2000, Outer Tracker Status
00-153 Outer Tracker H. Kapitza Coll. Meeting, Oct.2nd - 6th, 2000, Outer Tracker Review
00-152 Inner Tracker T. Zeuner Coll. Meeting, Oct.2nd - 6th, 2000, ITR-report
00-151 Inner Tracker T. Zeuner Coll. Meeting, Oct.2nd - 6th, 2000, Inner Tracker Plenary
00-150 Physics M. Villa Coll. Meeting, Oct.2nd - 6th, 2000, Analysis, Physics Meeting, Part III
00-149 Physics M. Schmelling et al. Coll. Meeting, Oct.2nd - 6th, 2000, Analysis, Physics Meeting, Part II
00-148 Physics T. Lohse et al. Coll. Meeting, Oct.2nd - 6th, 2000, Analysis, Physics Meeting, Part I
00-147 Tracking U. Uwer et al. Coll. Meeting, Oct. 2nd - 6th, 2000, Tracking meeting
00-146 Physics V. Egorytchev et al. HERA-B 2001,Study of B->J/Psi+X and the FCNC process, B->Mu+Mu-+X
00-145 Muon S. Nam Pad Readout Noise and Mod. of the Chamber Inner Structure
00-144 VDET I. Abt et al. Meeting of the HERA-B VDS group, August 30th, 2000, Part III
00-143 VDET I. Abt et al. Meeting of the HERA-B VDS group, August 30th, 2000, Part II
00-142 VDET I. Abt et al. Meeting of the HERA-B VDS group, August 30th, 2000, Part I
00-141 Physics S. Masciocchi et al. Physics Meeting, August 30th, 2000
00-140 Physics M. Schmelling et al. Physics Commissioning Meeting, September 6th, 2000
00-139 VDET S. Masciocchi et al. Primary Vertex Reconstruction by Rover
00-138 Physics M. Schmelling et al. Physics Commissioning Meeting, August 23rd, 2000
00-137 High-p_t C. Lu Calculation of the Townsend Coefficient with Garfield-Magboltz Program
00-136 High-p_t C. Lu Gas Mixture Candidates for HERA-B Outer High-Pt Trigger Counter
00-135 High-p_t C. Lu Electron attachment in the CF4 gas mixtures
00-134 Physics V. Vagnoni et al. Measurement of the mean interaction rate at HERA-B using the ECAL energy spectrum
00-133 Physics M. Schmelling et al. Physics Commissioning Meeting, August 16th, 2000
00-132 Tracking P. Conde et al. Matching for an incomplete tracker
00-131 Physics W. Hulsbergen et al. Physics Commissioning Meeting, August 9th, 2000
00-130 PRC V. Balagura et al. PRC Referee Meeting, 28 July, 2000, Part IIII
00-129 PRC A. Zoccoli, H. Kapitza PRC Referee Meeting, 28 July, 2000, Part III
00-128 PRC S. Masciocchi PRC Referee Meeting, 28 July, 2000, Part II
00-127 PRC M. Medinnis et al. PRC Referee Meeting, 28 July, 2000, Part I
00-126 Physics M. Schmelling et al. Physics Commissioning Meeting, July 19th, 2000, Part III
00-125 Physics M. Schmelling et al. Physics Commissioning Meeting, July 19th, 2000, Part II
00-124 Physics M. Schmelling et al. Physics Commissioning Meeting, July 19th, 2000, Part I
00-123 Muon A. Gutierrez Required Inspection of Muon Tube and Power Distribution Cards, 14 July, 2000
00-122 Physics M. Medinnis et al. Physics Commissioning Meeting, July 12th, 2000
00-121 Software H. Albrecht et al. Coll. Meeting, June 26th-30th, 2000, Reconstruction Plenary, Part 3
00-120 Software H. Albrecht et al. Coll. Meeting, June 26th-30th, 2000, Reconstruction Plenary, Part 2
00-119 Software H. Albrecht et al. Coll. Meeting, June 26th-30th, 2000, Reconstruction Plenary, Part 1
00-118 Physics T. Lohse et al. Coll. Meeting, June 26th-30th, 2000, Physics Meeting
00-117 Physics T. Lohse et al. Coll. Meeting, June 26th-30th, 2000, Physics Meeting, Part 3
00-116 Physics T. Lohse et al. Coll. Meeting, June 26th-30th, 2000, Physics Meeting, Part 2
00-115 Physics T. Lohse et al. Coll. Meeting, June 26th-30th, 2000, Physics Meeting, Part 1
00-114 Trigger D. Ressing Coll. Meeting, June 26th-30th, 2000, Status of the FLT
00-113 Software S. Masciocchi Coll. Meeting, June 26th-30th, 2000, Reconstruction Critical Review
00-112 Outer Tracker U. Uwer Coll. Meeting, June 26th-30th, 2000, Outer Tracker Status
00-111 Inner Tracker W. Gradl Coll. Meeting, June 26th-30th, 2000, Status of the Inner Tracker
00-110 RICH P. Krizan, R. Eckmann et al. Coll. Meeting, June 26th-30th, 2000, RICH Group Meeting
00-109 Software S. Masciocchi et al. Coll. Meeting, June 26th-30th, 2000, Tracking Meeting, Part 4
00-108 Software S. Masciocchi et al. Coll. Meeting, June 26th-30th, 2000, Tracking Meeting, Part 3
00-107 Software S. Masciocchi et al. Coll. Meeting, June 26th-30th, 2000, Tracking Meeting, Part 2
00-106 Software S. Masciocchi et al. Coll. Meeting, June 26th-30th, 2000, Tracking Meeting, Part 1
00-105 Physics M. Schmelling et al. Physics Commissioning Meeting, June 21st, 2000
00-104 Physics M. Schmelling et al. Physics Commissioning Meeting, June 14th, 2000
00-103 ECAL O. Igonkina et al. Online pi0 calibration of ECAL
00-102 Target K. Ehret Coasting Beam
00-101 General M. Titov HERA-B Status and First Results
00-100 Physics M. Schmelling et al. Physics Commissioning Meeting, May 31st, 2000
00-099 Physics R. F. Schwitters Run Plan Considerations
00-098 RICH R. F. Schwitters Possible Instability in Classic RICH PID Algorithms
00-097 Physics M. Schmelling et al. Physics Commissioning Meeting, May 24th, 2000
00-096 High-p_t V. Balagura et al. The Possibility to observe B0s Oscillations at HERA-B
00-095 ECAL M. Danilov et al. Measuring of direct Photon Production at HERA-B (Proposal)
00-094 Physics M. Schmelling et al. Physics Commissioning Meeting, May 17th, 2000
00-093 Physics M. Schmelling et al. Physics Commissioning Meeting, May 10th, 2000
00-092 Target K. Ehret Time Structure of HERA-B Target IA & Coasting Beam
00-091 PRC A. Schwarz et al. PRC Meeting, May 1st, 2000, Part 3
00-090 PRC A. Schwarz et al. PRC Meeting, May 1st, 2000, Part 2
00-089 PRC A. Schwarz et al. PRC Meeting, May 1st, 2000, Part 1
00-088 Physics M. Schmelling et al. Physics Commissioning Meeting, May 3, 2000
00-087 Farm A. Gellrich Data Logging in HERA-B's Golden Minimum Bias Run in April 2000
00-086 Physics M. Schmelling et al. Physics Commissioning Meeting, April 19th, 2000
00-085 Physics M. Schmelling et al. Physics Commissioning Meeting, April 12th, 2000
00-084 RICH R. F. Schwitters "Removal" of Background Rings from Single-ring Likelihood Fits
00-083 Physics F. Ould-Saada A way to look at HERA-B data
00-082 General J. Spengler HERA-B: Status and First Results, April 2-8th, 2000
00-081 Physics M. Schmelling et al. Physics Commissioning Meeting, April 5th, 2000
00-080 Trigger E. Gerndt HERA-B Pretrigger and FLT Board Connection
00-079 Physics M. Schmelling et al. Physics Commissioning Meeting, March 29th, 2000
00-078 ECAL I. Matchikhilian, S Shuvalov, O. Igonkina The HERA-B ECAL Occupancy Values and pedestal Positions Correlation with the Target Interaction Rate
00-077 Physics M. Schmelling et al. Physics Commissioning Meeting, March 15th, 2000
00-076 General A. Somov HERA-B Rate calibration and luminosity determination using ECAL Energy Sum
00-075 Physics A. Somov, Yu. Vassiliev Interaction Rate calibration of the HERA-B detector
00-074 DAQ F. Sanchez et al. Coll. Meetinng, Feb. 28th-Mar.3rd, 2000, DAQ Status
00-073 DAQ C. Padilla Coll. Meeting, Feb. 28th-Mar.3rd, 2000, Data Quality and Monitoring Status
00-072 Farm A. Gellrich et al. Coll. Meetinng, Feb. 28th-Mar.3rd, 2000, The 4LT Farm
00-071 Trigger P. Kreuzer Coll. Meeting, Feb. 28th-Mar.3rd, 2000, SLT/TLT Algorythm
00-070 Trigger D. Ressing Coll. Meeting, Feb. 28th-Mar.3rd, 2000, FLT Status
00-069 General J. D. Hansen Coll. Meeting, Feb. 28th-Mar.3rd, 2000, Collaboration Board Plenary
00-068 Muon Yu. Zaitsev Coll. Meetinng, Feb. 28th-Mar.3rd,2000, Muon Status
00-067 ECAL M. Bruschi Coll. Meeting, Feb. 28th-Mar.3rd, 2000, ECAL Status Report
00-066 TRD V. Saveliev Coll. Meeting, Feb. 28th-Mar.3rd, 2000, Transition Radiation Detector
00-065 RICH P. Krizan Coll. Meeting, Feb. 28th-Mar.3rd, 2000, RICH Status Report
00-064 High-p_t M. Danilov, Coll. Meeting, Feb. 28th-Mar 03rd,2000, Status of High_pt
00-063 Outer Tracker R. Eckmann Coll. Meeting, Feb. 28th-Mar 03rd,2000, Outer Tracker Status
00-062 Inner Tracker T. Zeuner Coll. Meeting, Feb. 28th-Mar 03rd,2000, Inner Tracker Status
00-061 VDET S. Masciocchi Coll. Meeting, Feb. 28th-Mar.3rd, 2000, Silicon Vertex Detector
00-060 Target K. Ehret Coll. Meeting, Feb. 28th-Mar.3rd, 2000, HERA-B Target Status
00-059 Run M. Medinnis Coll. Meeting, Feb. 28th-Mar.3rd, 2000, Report Run Coordinator
00-058 Physics T. Lohse Coll. Meeting, Feb. 28th-Mar.3rd, 2000, HERA-B Physics in Steps
00-057 General A. Schwarz Coll. Meeting, Feb. 28th-Mar.3rd, 2000, Opening Remarks
00-056 Software T. Lohse, H. Albrecht Coll. Meeting, Feb. 28th-Mar.3rd, 2000, Plenary Software Meeting, Part II
00-055 Software T. Lohse, H. Albrecht Coll. Meeting, Feb. 28th-Mar.3rd, 2000, Plenary Software Meeting, Part I
00-054 Physics T. Lohse, H. Albrecht Coll. Meeting, Feb. 28th-Mar.3rd, 2000, Plenary Software Meeting, Part III
00-053 Physics T. Lohse, H. Albrecht Coll. Meeting, Feb. 28th-Mar.3rd, 2000, Plenary Physics Meeting, Part II
00-052 Physics T. Lohse, H. Albrecht Coll. Meeting, Feb. 28th-Mar.3rd, 2000, Plenary Physics Meeting, Part I
00-051 Software H. Albrecht et al. Coll. Meeting, Feb. 28th-Mar. 3rd, 2000, Software Session
00-050 Inner Tracker F. Eisele et al. Coll. Meeting, Feb. 28th-Mar 03rd,2000, Inner Tracker session, Part III
00-049 Inner Tracker F. Eisele et al. Coll. Meeting, Feb. 28th-Mar 03rd,2000, Inner Tracker session, Part II
00-048 Inner Tracker F. Eisele et al. Coll. Meeting, Feb. 28th-Mar 03rd,2000, Inner Tracker session, Part I
00-047 VDET I. Abt, T. Knoepfle Coll. Meeting, Feb. 28th-Mar 03rd,2000, VDS Session, Part II
00-046 VDET I. Abt, T. Knoepfle Coll. Meeting, Feb. 28th-Mar 03rd,2000, VDS Session, Part I
00-045 Outer Tracker B. Schmidt, H. Kolanoski Coll. Meeting, Feb. 28th-Mar 03rd,2000, Outer Tracker Session
00-044 High-p_t M. Danilov, A. Schwartz Coll. Meeting, Feb. 28th-Mar 03rd,2000, High_pt session
00-043 RICH P. Krizan et al. Coll. Meeting, Feb. 28th-Mar.3rd, 2000, RICH session
00-042 Physics I. Abt, A. Zoccoli et al. Coll. Meeting, Feb. 28th-Mar.3rd, 2000, Tagging Study Group/CP Group
00-041 DAQ A. Gellrich et al. Coll. Meeting, Feb. 28th-Mar.3rd, 2000, SLT/Farm/DAQ/HLT session, Part 2
00-040 DAQ A. Gellrich et al. Coll. Meeting, Feb. 28th-Mar.3rd, 2000, SLT/Farm/DAQ/HLT session, Part 1
00-039 ECAL M. Bruschi, S. Shuvalov et al. Coll. Meeting, Feb. 28th-Mar.3rd, 2000, ECAL session
00-038 Target K. Ehret et al. Coll. Meeting, Feb. 28th-Mar.3rd, 2000, Target session, Part II
00-037 Target K. Ehret et al. Coll. Meeting, Feb. 28th-Mar.3rd, 2000, Target session, Part I
00-036 Muon R. Harr, Yu. Zaitsev et al. Coll. Meeting, Feb. 28th-Mar. 3rd, 2000, Muon session
00-035 Software A. Amorim, J. Hernandez et al. Coll. Meeting, Feb. 28th-Mar. 3rd, 2000, Calibration/Alignment/DB session
00-034 Trigger E. Gerndt et al. Coll. Meeting, Feb. 28th-Mar. 3rd, 2000, Pretriggers nd FLT session, Part 2
00-033 Trigger E. Gerndt et al. Coll. Meeting, Feb. 28th-Mar. 3rd, 2000, Pretriggers and FLT session, Part 1
00-032 VDET D. Emeliyanov, I. Kisel CATS Track fitting Algorithm based on the discrete Kalman Filter
00-031 Physics R. Itoh Status of Event Reconstruction of BELLE Experiment
00-030 Physics Y. Yamada Upgrade of BELLE SVD, Feb 15,2000
00-029 Physics N. Katayama Physics Analysis Status, Feb 16, 2000
00-028 Physics Stephen L. Olsen BELLE Overview, Feb 15-16, 2000
00-027 Physics M. Nakao Belle Trigger and Data Acquisition
00-026 Physics Yamaga et al. The Goal of the BELLE Experiment
00-025 Physics T. Hinzer et al. November Accelerator Physics Studies
00-024 Physics J. Seemann PEP-II Status & Plans, Feb 9,2000
00-023 Physics T. Oest, D. Samtleben Reconstruction of J/psi in 1999 data
00-022 Physics T. Glebe et al. Physics Commissioning Meeting, Feb 16, 2000
00-021 RICH R. F. Schwitters Single-ring Likelihood Fit Including Background
00-020 RICH R. F. Schwitters et al. Performance of the HERA-B RICH
00-019 RICH R. F. Schwitters et al. Reconstruction of Photon Directions in the HERA-B RICH
00-018 Physics T. Oest et al. Physics Commissioning Meeting, Feb. 2nd, 2000
00-017 General O. Steinkamp Status and Results From Hera-B
00-016 RICH D. Dujmic Monitoring the Ring Radius and Gas Composition in HERA-B RICH Vessel
00-015 RICH P. Krizan, O. Igonkina Alignment of RICH and ECAL with reconstructed Cerenkov Rings and converted Photons
00-014 Outer Tracker W. Hulsbergen et al. Calibration of HERA-B Outer Tracker Chambers in a Cosmic Ray Setup at NIKHEF
00-013 Trigger E. Gerndt HERA-B Pretrigger and FLT Latency
00-012 Physics M. Bargiotti et al. Present Knowledge of the Cabibbo-Kobayashi-Maskawa Matrix
00-011 Outer Tracker B. Schmidt et al. OTR-Meeting, Jan. 20th, 2000
00-010 PRC A. Schwarz et al. PRC Referee Meeting, Jan. 17/18th, 2000, Part 5
00-009 PRC A. Schwarz et al. PRC Referee Meeting, Jan. 17/18th, 2000, Part 4
00-008 PRC A. Schwarz et al. PRC Referee Meeting, Jan. 17/18th, 2000, Part 3
00-007 PRC A. Schwarz et al. PRC Referee Meeting, Jan. 17/18th, 2000, Part 2
00-006 PRC A. Schwarz et al. PRC Referee Meeting, Jan. 17/18th, 2000, Part 1
00-005 Physics M. Schmelling et al. Physics Commissioning Meeting, Jan. 19th, 2000
00-004 RICH R. Eckmann, D. Dujmic Software for stand-alone RICH Reconstruction
00-003 Farm A. Gellrich et al. Full Online Event Reconstruction at HERA-B
00-002 RICH M. Staric, P. Krizan Alilgnment of RICH and ECAL with data
00-001 General F. Ratnikov The HERA-B in the summer '99
99-251 Target K. Ehret et al. Target Group Meeting, Nov. 29th/30th 1999, Part III
99-250 Target K.Ehret et al. Target Group Meeting, Nov. 29th/30th 1999, Part II
99-249 Target K. Ehret et al. Target Group Meeting, Nov. 29th/30th 1999 Part I
99-248 Physics T. Oest et al. Physics Commissioning Meeting, Dec 15th, 1999, Part II
99-247 Physics T. Oest et al. Physics Commissioning Meeting, Dec 15th, 1999, Part I
99-246 Physics C. Padilla et al. Data Quality and Monitoring Meeting, 15 Dec. 1999
99-245 General M. Medinnis HERA-B Status
99-244 High-p_t A. Schwartz HERA-B: Physics Potential and Prospects
99-243 Outer Tracker H. Kapitza et al. HV commissioning status, further strategy
99-242 VDET I. Kisel, S. Masiocchi CATS - A Cellular Automaton for Tracking in Silicon for the HERA-B Vertex Detector
99-241 Physics Th. Jagla et al. Physics Commissioning Meeting, Nov. 24th, 1999
99-240 ECAL O. Igonkina The effect of ECAL miscalibration on the J/v mass reconstruction with calorimeter stand alone
99-239 Talks D. Froidevaux, K. Jakobs PRC Closed Session, Nov, 19th, 1999
99-238 Talks A. Schwarz et al PRC-referee-meeting, Nov. 17th, 1999, Part 6
99-237 Talks A. Schwarz et al. PRC-referee-meeting, Nov. 17th, 1999, Part 5
99-236 Talks A. Schwarz et al. PRC-referee-meeting, Nov. 17th, 1999, Part 4
99-235 Talks A. Schwarz et al. PRC-referee-meeting, Nov. 17th, 1999, Part 3
99-234 Talks A. Schwarz et al. PRC-referee-meeting, Nov. 17th, 1999, Part 2
99-233 Talks A. Schwarz et al. PRC-referee-meeting, Nov. 17th, 1999, Part 1
99-232 VDET W. Wagner The HERA-B Vertex Detector: First Results from Detector Commissioning
99-231 Physics M. Schmelling et al. Physics Commissioning Meeting, Nov. 10th, 1999, Part 2
99-230 Physics M. Schmelling et al. Physics Commissioning Meeting, Nov. 10th, 1999, Part 1
99-229 VDET I. Abt et al. Meeting of the HERA-B VDS Groups
99-228 VDET I. Abt et al. Meeting of the HERA-B VDS Groups (minutes)
99-227 Outer Tracker B. Schmidt et al. OTR-Meeting, Nov. 4th, 1999
99-226 DAQ M. Bahte, D. Vishnevsky, G. Wagner SHARC-cable tests
99-225 TRD V. Saveliev Coll. Meeting, Oct.11th-15th, HERA-B TRD
99-224 Physics Th. Oest et al. Physics Comissioning Meet., Oct. 27th, 99
99-223 ECAL I. Matchikhilian, S. Shuvalov The Hera-B ECAL Module Light Yield Non-unif. Meas.
99-222 Trigger B. Schwenninger The HERA-B Muon Pretrigger System: From Pads to Track Seeds
99-221 Trigger M. Medinnis Coll. Meeting, Oct.11th-15th, SLT/TLT Algorithms
99-220 Farm A. Gellrich Coll. Meeting, Oct.11th-15th, Farms
99-219 DAQ J. Hernandez Coll. Meeting, Oct.11th-15th, DAQ Status
99-218 Muon S. Nam Coll. Meeting, Oct.11th-15th, Muon System Status
99-217 ECAL S. Shuvalov Coll. Meeting, Oct.11th-15th, ECAL Status
99-216 Trigger F. Ratnikov Coll. Meeting, Oct.11th-15th, FLT Status Report
99-215 RICH R. Schwitters Coll. Meeting, Oct.11th-15th, RICH Status
99-214 High-p_t A. Schwartz et al. Coll. Meeting, Oct.11th-15th, Status of the High_pt Pretrigger System
99-213 Outer Tracker U. Uwer Coll. Meeting, Oct.11th-15th, Status of Outer Tracker
99-212 Inner Tracker Th. Hott Coll. Meeting, Oct.11th-15th, Status of Inner Tracker
99-211 VDET K.T. Knoepfle Coll. Meeting, Oct.11th-15th, Vertex Detector System
99-210 Target Y. Vassiliev Coll. Meeting, Oct.11th-15th, Hera-B Target Status
99-209 Run M. Medinnis Coll. Meeting, Oct.11th-15th,Run Coordination Report
99-208 Technical Board J. Spengler Coll. Meeting, Oct. 11th - 15th, 1999, Technical Coordinator Report
99-207 RICH P. Krizan, R. Eckmann et al Coll. Meeting, Oct.11th-15th, 1999, RICH Session, Part 2
99-206 RICH P. Krizan, R. Eckmann et al Coll. Meeting, Oct.11th-15th, 1999, RICH Session, Part 1
99-205 Software H. Albrecht et al. Coll. Meeting, Oct.13th, 1999, Physics/Software Plenary Meet. Part3
99-204 Physics Th. Lohse et al. Coll. Meeting, Oct.13th, 1999, Physics/Software Plenary Meet. Part 2
99-203 Physics Th. Lohse et al. Coll. Meeting, Oct.13th, 1999, Physics/Software Plenary Meet. Part 1
99-202 Software H. Albrecht et al. Coll. Meeting, Oct. 11th-15th, 1999, Software session
99-201 Physics R. Miquel, P. Krizan et al. Coll. Meeting, Oct. 11th-15th, 1999, Heavy Flavour Group III
99-200 High-p_t M. Danilov, A. Schwartz et al. Coll. Meeting, Oct. 11th-15th, 1999, High-pt session
99-199 VDET I. Abt, T. Knoepfle et al. Coll. Meeting, Oct. 11th-15th, 1999, Vertex Detector Session, Part 2
99-198 VDET I. Abt, T. Knoepfle et al. Coll. Meeting, Oct. 11th-15th, 1999, Vertex Detector Session, Part 1
99-197 Inner Tracker F. Eisele Coll. Meeting, Oct. 11th-15th, 1999, Inner Tracker session, Part 2
99-196 Inner Tracker F. Eisele Coll. Meeting, Oct. 11th-15th, 1999, Inner Tracker session, Part 1
99-195 Physics I. Abt et al. Coll. Meet. Oct.11th-15th, Tagging Study Group / CP Group
99-194 DAQ A. Gellrich et al. Coll. Meeting, Oct. 11th-15th, 1999, SLT/Farm/DAQ/HLT session,Part2
99-193 DAQ A. Gellrich et al. Coll. Meeting, Oct. 11th-15th, 1999, SLT/Farm/DAQ session,Part1
99-192 Muon Yu. Zaitsev et al Coll. Meeting, Oct. 11th-15th, 1999, MUON overview Part2
99-191 Muon Yu. Zaitsev et al. Coll. Meeting, Oct. 11th-15th, 1999, MUON overview Part1
99-190 Outer Tracker B.Schmidt et al. Coll. Meeting, Oct. 11th-15th, 1999, OTR session
99-189 Target K.Ehret et al. Coll. Meeting, Oct. 11th-15th, 1999, Target session
99-188 Muon Yu. Zaitsev et al. Coll. Meeting, Oct. 11th-15th, 1999, MUON session
99-187 Software A. Amorim et al. Coll. Meeting, Oct. 11th-15th, 1999, Software session
99-186 Trigger E. Gerndt et al Coll. Meeting, Oct. 11th-15th, 1999, Pretriggers and FLT session, Part 2
99-185 Trigger E. Gerndt et al. Coll. Meeting, Oct. 11th-15th, 1999, Pretriggers and FLT session, Part 1
99-184 RICH M. Ispiryan, S. Ramachandran Triangle Based Ring Reconstruction Algorithm for HERA-B RICH
99-183 Outer Tracker B. Schmidt et al. OTR Meeting, Sept. 30th, 1999
99-182 Outer Tracker K. Hoepfner Status Report: Hera-B Outer Tracker Chambers Based on Straw Tubes
99-181 Physics T. Oest et al. Physics Commissioning Meeting, September 1st and 15th, 1999
99-180 Physics T. Oest et al. Physics Commissioning Meeting, August 18th, 1999
99-179 Physics T. Oest et al. Physics Commissioning Meeting, August 4th, 1999
99-178 Physics T. Oest et al. Physics Commissioning Meeting, June 16th and 30th, 1999
99-177 Outer Tracker B. Schmidt et al. OTR Meeting, Aug. 26th, 1999
99-176 Physics M. Schmelling Evidence for Heavy Flavours in the `99 Magnet-Off Data
99-175 VDET S. Masciocchi A very first look at data from the RATE SCAN with target station 1
99-174 Outer Tracker R. Zimmermann Test des ASD8 in der TDC-Umgebung
99-173 Outer Tracker B. Schmidt et al. OTR Meeting, Aug. 12th, 1999
99-172 Physics T. Oest et al. Physics Commissioning Meeting, Aug. 25th, 1999
99-171 Outer Tracker O. Despang, T. Fox, V. Souvorov, M. Walter Measurement of Gas Quality in a Prototype Closed Gas System for Mini-SL1
99-170 Inner Tracker C. Richter, C. Werner, A. Lange PSI-beam-test results (26.3.-14.4.99) GEM-MSGCs for the HERA-B experiment
99-169 Trigger S. Schmidt Coll. Meeting, July 19th-23rd, 1999, SLT/TLT Algorithms
99-168 Farm A. Gellrich Coll. Meeting, July 19th-23rd, 1999, SLT Upgrade Status
99-167 DAQ F. Sanchez Coll. Meeting, July 19th-23rd, 1999, DAQ Status
99-166 Run V. Rybnikov Coll. Meeting, July 19th-23rd, 1999, Hera-B Run&Slow Control Systems
99-165 Muon M. Titov Coll. Meeting, July 19th-23rd, 1999, MUON Status report
99-164 ECAL M. Bruschi Coll. Meeting, July 19th-23rd, 1999, ECAL Status Report
99-163 General J. D. Hansen Coll. Meeting, July 19th-23rd, 1999, Collaboration Board Plenary Talk
99-162 Trigger E. Gerndt Coll. Meeting, July 19th-23rd, 1999, FLT Status Summer 1999
99-161 TRD V. Saveliev Coll. Meeting, July 19th-23rd, 1999, HERA-B TRD Plenary Talk
99-160 RICH P. Krizan Coll. Meeting, July 19th-23rd, 1999, RICH Status Report
99-159 High-p_t M. Danilov Coll. Meeting, July 19th-23rd, 1999, Status of High-pt Trigger
99-158 Outer Tracker H. Kapitza Coll. Meeting, July 19th-23rd, 1999, Outer Tracker Status
99-157 Inner Tracker T. Hott Coll. Meeting, July 19th-23rd, 1999, Inner Tracker plenary Talk
99-156 VDET I. Abt Coll. Meeting, July 19th-23rd, 1999, VDS Plenary Talk
99-155 Target K. Ehret Coll. Meeting, July 19th-23rd, 1999, HERA-B Target Status
99-154 Run M. Medinnis Coll. Meeting, July 19th-23rd, 1999, Run Coordination Report
99-153 Technical Board J. Spengler Coll. Meeting, July 19th-23rd, 1999, Technical Coordinator Report
99-152 Physics T. Lohse et al. Coll. Meeting, July 19th-23rd, 1999, Physics Plenary Meeting, Part 4
99-151 Physics T. Lohse et al. Coll. Meeting, July 19th-23rd, 1999, Physics Plenary Meeting, Part 3
99-150 Physics T. Lohse et al. Coll. Meeting, July 19th-23rd, 1999, Physics Plenary Meeting, Part 2
99-149 Physics T. Lohse et al. Coll. Meeting, July 19th-23rd, 1999, Physics Plenary Meeting, Part 1
99-148 Software H. Albrecht Coll. Meeting, July 19th-23rd, 1999, Software Plenary Talk
99-147 Software H. Albrecht et al. Coll. Meeting, July 19th-23rd, 1999, Software session
99-146 High-p_t M. Danilov, A. Schwartz et al. Coll. Meeting, July 19th-23rd, 1999, High-pt session
99-145 VDET I. Abt et al. Coll. Meeting, July 19th-23rd, 1999, Vertex Detector session, Part 2
99-144 VDET I. Abt et al. Coll. Meeting, July 19th-23rd, 1999, Vertex Detector session, Part 1
99-143 Physics R. Miquel, P. Krizan et al. Coll. Meeting, July 19th-23rd, 1999, Heavy Flavour Group III session
99-142 Physics I. Abt, O. Steinkamp et al. Coll. Meeting, July 19th-23rd, 1999, Tagging Study Group session
99-141 Target K. Ehret et al. Coll. Meeting, July 19th-23rd, 1999, Target session
99-140 Inner Tracker F. Eisele et al. Coll. Meeting, July 19th-23rd, 1999, Inner Tracker session , Part 2
99-139 Inner Tracker F. Eisele et al. Coll. Meeting, July 19th-23rd, 1999, Inner Tracker session
99-138 ECAL M. Bruschi, A. Golutvin et al. Coll. Meeting, July 19th-23rd, 1999, Calorimeter session
99-137 Outer Tracker B. Schmidt et al. Coll. Meeting, July 19th-23rd, 1999, OTR session, Part 2
99-136 Outer Tracker B. Schmidt et al. Coll. Meeting, July 19th-23rd, 1999, OTR session, Part 1
99-135 RICH P. Krizan, R. Eckmann et al. Coll. Meeting, July 19th-23rd, 1999, RICH session, Part 2
99-134 RICH P. Krizan, R. Eckmann et al. Coll. Meeting, July 19th-23rd, 1999, RICH session, Part 1
99-133 DAQ D. Ressing, A. Gellrich et al. Coll. Meeting, July 19th-23rd, 1999, SLT/Farm/DAQ session
99-132 Muon R. Harr et al. Coll. Meeting, July 19th-23rd, 1999, MUON session, Part 2
99-131 Muon R. Harr et al. Coll. Meeting, July 19th-23rd, 1999, MUON session, Part 1
99-130 Software T. Oest, A. Amorim et al. Coll. Meeting, July 19th-23rd, 1999, Calibration, Alignment, Data bases session, Part 2
99-129 Software T. Oest, A. Amorim et al. Coll. Meeting, July 19th-23rd, 1999, Calibration, Alignment, Data bases session, Part 1
99-128 Trigger E. Gerndt et al. Coll. Meeting, July 19th-23rd, 1999, Pretriggers and FLT session
99-127 ECAL M. Danilov, V. Eiges, S. Shuvalov Measurement of bb production cross section in HERA-B using semileptonic B decays
99-126 VDET S. Masciocchi et al. Double sided mikrostrip detectors for the high radiation environment in the HERA-B experiment
99-125 Talks K. Jakobs, D. Froidevaux PRC Closed Session, June 30th, 1999
99-124 Software T. Lohse, R. Mankel, R. Seitz, S. Nowak MCREC: A General Tool for Digitization and Reconstruction of Monte Carlo Data for Physics at HERA-B
99-123 Physics T. Oest et al. Physics Commissioning Meeting, July 7th, 1999
99-122 Software A. Semenov DBARTE package
99-121 Software H. Albrecht et al. Software Meeting, June 23rd, 1999, Part 2
99-120 Software H. Albrecht et al. Software Meeting, June 23rd, 1999, Part 1
99-119 Outer Tracker H. Kapitza et al. OTR Meeting, July 1st, 1999
99-118 Muon R. Harr, J.G. Shiu EEPROM Data Format for the Muon System Front End Electronics
99-117 Muon R. Harr Muon Chamber and Channel Numbering
99-116 Talks T. Lohse Hera-B Status, PRC open session, June 29th, 1999
99-115 Talks A. Schwarz et al. PRC-referee-Meeting, June 28th, 1999, Part 2
99-114 Talks A. Schwarz et al. PRC-referee-Meeting, June 28th, 1999, Part 1
99-113 Outer Tracker M. Walter et al. First Test Results with a Prototype Closed Gas System for the Outer Tracker
99-112 Software D. Bandourin Global alignment routines description
99-111 Software R. Mankel, A. Spiridonov ranger - a Pattern Recognition Algorithm for the HERA-B Main Tracking System. Part V: Compatibility Analysis
99-110 Outer Tracker R. Mankel et al. OT software Commissioning Meeting, June 15th, 1999
99-109 RICH I. Arinyo et al. Study of the possibility to add single anode Hamamatsu Photomultipliers to the focal plane of the HERA-B Rich
99-108 RICH I. Arinyo, L. Garrido Particle Identification with the HERA-B RICH
99-107 Physics T. Oest et al. Alignment Meeting, June 17th, 1999
99-106 Physics T. Oest et al. Physics Commissioning Meeting, June 9th, 1999
99-105 Physics J. Ivarsson Reconstruction Efficiencies for the Golden Decay
99-104 Physics M. Schmelling et al. Analysis/QCD and early Physics Meeting, May 26/27th, 1999, Part 3
99-103 Physics M. Schmelling et al. Analysis/QCD and early Physics Meeting, May 26/27th, 1999, Part 2
99-102 Physics M. Schmelling et al. Analysis/QCD and early Physics Meeting, May 26/27th, 1999, Part 1
99-101 High-p_t C. Leonidopoulos, C. Lu, A. Schwartz Development of a Straw Tube Chamber with Pickup-Pad Readout (paper presented at DPF '99 meeting, UCLA)
99-100 RICH R. Schwitters et al. Measuring Momentum with the HERA-B RICH and ECAL
99-099 RICH R. Schwitters Particle Separation on the "r2p2" Plot
99-098 Software T. Lohse MCGEN: A General Tool for Monte Carlo Production for Physics at HERA-B
99-097 Physics M. Schmelling et al. QCD and early Physics Meeting, Apr 30th, 1999, Part 2
99-096 Physics M. Schmelling et al. QCD and early Physics Meeting, Apr 30th, 1999, Part 1
99-095 Physics M. Schmelling et al. QCD Meeting, Mar 29th, 1999
99-094 Talks A. Schwarz et al. Meeting with PRC referees, May, 11th, 1999, Part 4
99-093 Talks A. Schwarz et al. Meeting with PRC referees, May, 11th, 1999, Part 3
99-092 Talks A. Schwarz et al. Meeting with PRC referees, May, 11th, 1999, Part 2
99-091 Talks A. Schwarz et al. Meeting with PRC referees, May, 11th, 1999, Part 1
99-090 Physics R. Schwitters How to Find J/Psi
99-089 Physics T. Oest et al. Analysis Meeting, May 5th, 1999
99-088 Physics T. Nakada CP Violation, May 12th, 1999, Part 3
99-087 Software R. Mankel A "Canonical" Procedure to Fix External Degrees of Freedom in the Internal Alignment of a Tracking System
99-086 Software M. Schmelling The HOLMES Program Package
99-085 General J. Spengler Status von HERA-B, May 5th, 1999, Groemitz
99-084 Physics T. Nakada CP Violation, Apr 28th, 1999, Part 2
99-083 Physics T. Nakada CP Violation, Apr 14th, 1999, Part 1
99-082 Physics T. Oest et al. Analysis Meeting, Apr 28th, 1999
99-081 Outer Tracker B. Schmidt et al. OTR Meeting, Apr 22nd, 1999
99-080 ECAL B. Bobchenko et al. General Description of the Control and Diagnostic Software for HERA-B Electromagnetic Calorimeter (ECAL)
99-079 ECAL B. Bobchenko, O. Gouchtchine, I. Matchikhilian, S. Shuvalov Database system of ECAL Control and Diagnostic Software
99-078 Physics M. Braeuer, B. Fominykh Physics/Analysis Meeting, Apr 21st, 1999
99-077 Physics J. Ivarsson Semileptonic B Decays with ECAL and partial VDS and the Magnet switched on.
99-076 Software H. Albrecht et al. Software Meeting, Apr 14th, 1999, Part 2
99-075 Software H. Albrecht et al. Software Meeting, Apr 14th, 1999, Part 1
99-074 Outer Tracker B. Schmidt et al. OTR Meeting, Apr 15th, 1999
99-073 Physics T. Oest et al Analysis Meeting, Apr 14th, 1999
99-072 Software A. Semenov Automatic build service for ARTE
99-071 Physics T. Oest et al Analysis Meeting, Apr 7th, 1999
99-070 Outer Tracker B. Schmidt et al. OTR Meeting, Mar 25th, 1999
99-069 High-p_t A. Schwartz, C. Leonidopoulos, C. Lu Development of a Straw Tube Chamber with Pickup-Pad Readout for HERA-B.(Talk presented at APS Centennial Meeting, March 20-26th, Atlanta)
99-068 Physics T. Oest et al. Analysis Meeting, Mar 24th, 1999
99-067 Software J. Ivarsson , P. Kreuzer, T. Lohse PYTHIA and FRITIOF: Event Generators for HERA-B.
99-066 Software D. Bandourin Proposals on speeding up GEANT simulation for ECAL and TRD
99-065 Outer Tracker U. Uwer et al. Aging of Gaseous Detectors
99-064 Physics T. Oest et al. Analysis/Alignment Meeting, Mar 17th, 1999
99-063 Software R. Mankel Recommendations for Evaluating the Performance of HERA-B Reconstruction Modules
99-062 Software T. Oest et al. Alignment Meeting, Mar 3rd, 1999
99-061 Outer Tracker B. Schmidt et al. OTR-Meeting, Febr. 25th, 1999
99-060 Muon F. Ratnikov, S. Semenov The Proposal: How to reduce the Electronics for MX1 Chambers
99-059 Software R. Mankel Coll Meeting, Febr. 8th-12th, 1999, Software Summary
99-058 Trigger S. Scharein Coll Meeting, Febr. 8th-12th, 1999, SLT/TLT Algorithms
99-057 Farm A. Gellrich Coll Meeting, Febr. 8th-12th, 1999, Status and Plans of HERA-B`s Farms
99-056 DAQ G. Wagner Coll Meeting, Febr. 8th-12th, 1999, Data Path Items
99-055 Run V. Rybnikov Coll Meeting, Febr. 8th-12th, 1999, HERA-B Run Control
99-054 Trigger H. Itterbeck Coll Meeting, Febr. 8th-12th, 1999, Status of FLT Hard-/Software and Commissioning
99-053 Muon S. Nam Coll Meeting, Febr. 8th-12th, 1999, Muon System Status
99-052 General D. Hansen Coll Meeting, Febr. 8th-12th, 1999, Report Collaboration Board
99-051 Physics T. Lohse et al. Coll Meeting, Febr. 8th-12th, 1999, Plenary Physics Meeting, Part 3
99-050 Physics T. Lohse et al. Coll Meeting, Febr. 8th-12th, 1999, Plenary Physics Meeting, Part 2
99-049 Physics T. Lohse et al. Coll Meeting, Febr. 8th-12th, 1999, Plenary Physics Meeting, Part 1
99-048 ECAL S. Shuvalov Coll Meeting, Febr. 8th-12th, 1999, ECAL Status
99-047 TRD V. Saveliev Coll Meeting, Febr. 8th-12th, 1999, Transition Radiation Detector, Plenary talk
99-046 RICH R. Eckmann Coll Meeting, Febr. 8th-12th, 1999, RICH Status Report
99-045 High-p_t A. Schwartz Coll Meeting, Febr. 8th-12th, 1999, High-pt Chambers, Plenary talk
99-044 Outer Tracker B. Schmidt Coll Meeting, Febr. 8th-12th, 1999, Status of the OTR
99-043 Inner Tracker G. Zech Coll Meeting, Febr. 8th-12th, 1999, Inner Tracker Plenary talk
99-042 VDET K.T. Knoepfle Coll Meeting, Febr. 8th-12th, 1999, Vertex Detector System
99-041 Target K. Ehret Coll Meeting, Febr. 8th-12th, 1999, HERA-B Target: Status & Plans
99-040 Run M. Medinnis Coll Meeting, Febr. 8th-12th, 1999, Run Coordinator Report
99-039 Technical Board J. Spengler Coll Meeting, Febr. 8th-12th, 1999, Technical Coordinator Report
99-038 Outer Tracker B. Schmidt et al. Coll Meeting, Febr. 8th-12th, 1999, Outer Tracker session, Part 2
99-037 Outer Tracker B. Schmidt et al. Coll Meeting, Febr. 8th-12th, 1999, Outer Tracker session, Part 1
99-036 Trigger E. Gerndt, F. Ratnikov et al. Coll Meeting, Febr. 8th-12th, 1999, Pretriggers and FLT, Part 2
99-035 Trigger E. Gerndt, F. Ratnikov et al. Coll Meeting, Febr. 8th-12th, 1999, Pretriggers and FLT, Part 1
99-034 Physics T. Oest et al. Coll Meeting, Febr. 8th-12th, 1999, Physics working Group I
99-033 Muon Yu. Zaitsev et al. Coll Meeting, Febr. 8th-12th, 1999, MUON session
99-032 Software H. Albrecht et al. Coll Meeting, Febr. 8th-12th, 1999, Software session, Part 3
99-031 Software H. Albrecht et al. Coll Meeting, Febr. 8th-12th, 1999, Software session, Part 2
99-030 Software H. Albrecht et al. Coll Meeting, Febr. 8th-12th, 1999, Software session, Part 1
99-029 High-p_t M. Danilov, A. Schwartz et al. Coll Meeting, Febr. 8th-12th, 1999, High-pt session
99-028 VDET K.T. Knoepfle et al. Coll Meeting, Febr. 8th-12th, 1999, Vertex Detector session, Part 2
99-027 VDET K.T. Knoepfle et al. Coll Meeting, Febr. 8th-12th, 1999, Vertex Detector session, Part 1
99-026 Inner Tracker G. Zech et al. Coll Meeting, Febr. 8th-12th, 1999, Inner Tracker session
99-025 Physics R. Miquel, P. Krizan et al. Coll Meeting, Febr. 8th-12th, 1999, Heavy Flavour Group III
99-024 Physics I. Abt, O. Steinkamp et al. Coll Meeting, Febr. 8th-12th, 1999, Tagging Study Group
99-023 RICH P. Krizan, R. Eckmann et al. Coll Meeting, Febr. 8th-12th, 1999, RICH session, Part 2
99-022 RICH P. Krizan, R. Eckmann et al. Coll Meeting, Febr. 8th-12th, 1999, RICH session, Part 1
99-021 DAQ D. Ressing, A. Gellrich et al. Coll Meeting, Febr. 8th-12th, 1999, DAQ/SLT/Farm session
99-020 Muon Yu. Zaitsev et al. Coll Meeting, Febr. 8th-12th, 1999, MUON session
99-019 Software A. Amorim et al. Coll Meeting, Febr. 8th-12th, 1999, Software session
99-018 Target K. Ehret et al. Coll Meeting, Febr. 8th-12th, 1999, Target session
99-017 VDET I. Abt et al. Characterization of Silicon Microstrip Detectors Using an Infrared Laser System.
99-016 Muon V. Eiges On a Possibility to observe J/v --> u+u- in the Spring `99 HERA-B Run with Magnet on
99-015 RICH P. Conde, D. Dujmic Quality Test for the 98 RICH Common DAQ Data
99-014 DAQ T. Fuljahn Documentation of FCS Software, Version 3
99-013 VDET B. Schwingenheuer Description of the HERA-B front-end electronics for the silicon vertex detector and the inner tracker.
99-012 High-p_t A. J. Schwartz The Time Dependence of B0 rightarrow f Decays.
99-011 Outer Tracker B. Schmidt et al. OTR Meeting, Jan. 28th, 1999
99-010 Physics T. Oest et al. Physics/Analysis Meeting, Jan, 20th, 1999
99-009 RICH H. Calcao, J. Carvalho et al. Monitoring of the RICH Photo Detector
99-008 RICH J. Carvalho RICH Rings Pattern Recognition Algorithms - a few preliminary Tests
99-007 Outer Tracker R. Mankel How Deadly is a "Coasting Beam" for the HERA-B Outer Tracker?
99-006 Outer Tracker A. Schwarz, B. Schmidt et al. Outer Tracker Meeting, Jan. 14th, 1999
99-005 Talks A. Schwarz et al. Meeting with PRC referees, January 8th, 1999. Part 4.
99-004 Talks A. Schwarz et al. Meeting with PRC referees, January 8th, 1999. Part 3.
99-003 Talks A. Schwarz et al. Meeting with PRC referees, January 8th, 1999. Part 2.
99-002 Talks A. Schwarz et al. Meeting with PRC referees, January 8th, 1999. Part 1.
99-001 Muon Yu. Gilitsky, T. Kvaratscheliia Pixel Chamber Fee Noise Tests
98-226 Outer Tracker A. Schwarz et al. Outer Tracker Meeting, Dec. 10th, 1998
98-225 Outer Tracker E. Michel, M. Pohl, V. Souvorov, M. Walter Cabling Scheme for OTR Modules
98-224 Outer Tracker E. Michel, U. Schwanke, U. Uwer, M. Walter Outer Tracker Signal Flow and Control Cabling: Proposal of a Database Scheme
98-223 Physics T. Oest et al. Physics/Analysis Meeting, Dec, 16th, 1998
98-222 Outer Tracker A. Schwarz, H. Kolanoski et al. OTR gas system Meeting, Dec. 16th, 1998, Zeuthen
98-221 Target K. Ehret et al. Target Group Meeting, Dec. 16th-18th, 1998, Univ. Dortmund
98-220 RICH J. Pyrlik The RICH High Voltage Slow Control Software.
98-219 Physics T. Oest et al. Physics/Analysis Meeting, Dec. 9th, 1998
98-218 Physics A. Kharchilava, T. Lohse, A. Somov, A. Tkabladze Upsilon Polarisation at Hera-B
98-217 VDET K. Riechmann Einsatz von Siliziumdetektoren in der Hochstrahlungsumgebung von HERA-B. (Dissertation)
98-216 Physics T. Oest et al. Physics/Analysis Meeting, Dec. 2nd, 1998, Part 2
98-215 Physics T. Oest et al. Physics/Analysis Meeting, Dec. 2nd, 1998, Part 1
98-214 Outer Tracker C. Padilla et al. Outer Tracker Meeting, Nov. 19th, 1998, Hamburg
98-213 RICH P. Conde, D. Peralta, R. Miquel The RICH Calibration Program
98-212 DAQ T. Fuljahn, D. Ressing FCS Documentation
98-211 Software H. Albrecht, T. Oest et al Software Meeting, Nov. 11th, 1998
98-210 Talks A. Schwarz et al Meeting with PRC referees, Nov. 10th, 1998, Part 3
98-209 Talks A. Schwarz et al Meeting with PRC referees, Nov. 10th, 1998, Part 2
98-208 Talks A. Schwarz et al Meeting with PRC referees, Nov. 10th, 1998, Part 1
98-207 RICH J. Rosen, D. Broemmelsiek Tutorial on e +- and y Detection: The Electromagnetic Calorimeter and the Ring Imaging Cerenkov Counter
98-206 Software R. Mankel, A. Spiridonov Ranger - a Pattern Recognition Algorithm for the HERA-B Main Tracking System
98-205 Software D. Peralta First Studies on Software Alignment for the HERA-B Outer Tracker.
98-204 Outer Tracker C. Padilla et al. Outer Tracker Meeting Hamburg: October 29th, 1998. Part II.
98-203 Outer Tracker C. Padilla et al. Outer Tracker Meeting Hamburg: October 29th, 1998. Part I.
98-202 Farm A. Gellrich et al. The Fourth Level Trigger Online Reconstruction Farm of HERA-B.
98-201 Software R. Mankel Outer Tracker Event Data Interface for Pattern Recognition and Track Reconstruction
98-200 Outer Tracker S. Solunin, S. Vassiliev, D. Vishnevsky Search of Optimal Regime of ASD-8 Power Supply
98-199 Inner Tracker A. Donat et al Coll. Meeting, Oct. 5th-9th, 1998, ITR/OTR/High-pt interface session
98-198 Outer Tracker C. Stegmann Measurement of the Curing Time of Stycast 1266 A + Catalyst 9 Glue
98-197 RICH P. Krizan et al Coll. Meeting, Oct. 5th-9th, 1998, RICH session, Part 2
98-196 RICH P. Krizan et al Coll. Meeting, Oct. 5th-9th, 1998, RICH session, Part 1
98-195 Physics T. Oest Coll. Meeting, Oct. 5th-9th, 1998, Physics Meeting Summary, Plenary talk
98-194 Software H. Albrecht Coll. Meeting, Oct. 5th-9th, 1998, Software Report, Plenary talk
98-193 Trigger S. Xella Coll. Meeting, Oct. 5th-9th, 1998, SLT/TLT Algorithms, Plenary talk
98-192 Farm A. Gellrich Coll. Meeting, Oct. 5th-9th, 1998, Status of Farms, Plenary talk
98-191 DAQ T. Fuljahn Coll. Meeting, Oct. 5th-9th, 1998, Data path items, Plenary talk
98-190 Slow Control V. Rybnikov Coll. Meeting, Oct. 5th-9th, 1998, HERA-B Run Control, Plenary talk
98-189 Slow Control U. Uwer Coll. Meeting, Oct. 5th-9th, 1998, Slow Control and Monitoring, Plenary talk
98-188 Trigger E. Gerndt Coll. Meeting, Oct. 5th-9th, 1998, FLT - Hardware Status Run `98, Plenary talk
98-187 Muon M. Titov Coll. Meeting, Oct. 5th-9th, 1998, Muon Status Report, Plenary talk
98-186 ECAL M. Bruschi Coll. Meeting, Oct. 5th-9th, 1998, ECAL Status Report, Plenary talk
98-185 General H. Sindt Coll. Meeting, Oct. 5th-9th, 1998, DESY Safety Information, Plenary talk
98-184 TRD V. Saveliev Coll. Meeting, Oct. 5th-9th, 1998, HERA-B, Transition Radiation Detector, Plenary talk
98-183 RICH P. Krizan Coll. Meeting, Oct. 5th-9th, 1998, RICH Status Report, Plenary talk
98-182 High-p_t M. Danilov Coll. Meeting, Oct. 5th-9th, 1998, Status of the High-pt Trigger, Plenary talk
98-181 Outer Tracker C. Padilla Coll. Meeting, Oct. 5th-9th, 1998, Outer Tracker Status Report, Plenary talk
98-180 Inner Tracker G. Zech Coll. Meeting, Oct. 5th-9th, 1998, Inner Tracker, Plenary talk
98-179 VDET I. Abt Coll. Meeting, Oct. 5th-9th, 1998, Status of the Vertex Detector System, Plenary talk
98-178 Target S. Issever Coll. Meeting, Oct. 5th-9th, 1998, HERA-B Target - Review, Status & Plans, Plenary talk
98-177 Run M. Medinnis Coll. Meeting, Oct. 5th-9th, 1998, Run Coordinator Report, Plenary talk
98-176 Technical Board J. Spengler Coll. Meeting, Oct. 5th-9th, 1998, Tech. Coordinator Report, Plenary talk
98-175 General A. S. Schwarz Coll. Meeting, Oct. 5th-9th, 1998, HERA-B - Past, Present and Future, Plenary talk
98-174 General B. Schmidt Coll. Meeting, Oct. 5th-9th, 1998, Report from the New Management, Plenary talk
98-173 Physics T. Oest et al Coll. Meeting, Oct. 5th-9th, 1998, Physics session
98-172 Software H. Albrecht et al Coll. Meeting, Oct. 5th-9th, 1998, Software session, Part 2
98-171 Software H. Albrecht et al Coll. Meeting, Oct. 5th-9th, 1998, Software session, Part 1
98-170 High-p_t M. Danilov, A. Schwartz et al Coll. Meeting, Oct. 5th-9th, 1998, High-pt session
98-169 VDET K. T. Knoepfle et al Coll. Meeting, Oct. 5th-9th, 1998, Vertex Detector session, Part 2
98-168 VDET K. T. Knoepfle et al Coll. Meeting, Oct. 5th-9th, 1998, Vertex Detector session, Part 1
98-167 Muon R. Harr et al Coll. Meeting, Oct. 5th-9th, 1998, MUON session
98-166 Outer Tracker B. Schmidt et al Coll. Meeting, Oct. 5th-9th, 1998, OTR plenary session
98-165 Muon R. Harr et al Coll. Meeting, Oct. 5th-9th, 1998, MUON session
98-164 DAQ D. Ressing et al Coll. Meeting, Oct. 5th-9th, 1998, DAQ/Farm/SLT/HLT session
98-163 DAQ D. Ressing et al Coll. Meeting, Oct. 5th-9th, 1998, DAQ/Farm/SLT session
98-162 Outer Tracker B. Schmidt et al Coll. Meeting, Oct. 5th-9th, 1998, OTR working group session
98-161 Run M. Medinnis et al Coll. Meeting, Oct. 5th-9th, 1998, Run 98 coordination session
98-160 Target K. Ehret et al Coll. Meeting, Oct. 5th-9th, 1998, Target session
98-159 Trigger E. Gerndt et al Coll. Meeting, Oct. 5th-9th, 1998, Pretriggers and FLT session
98-158 Software T. Oest et al Coll. Meeting, Oct. 5th-9th, 1998, Calibration, Alignment, Data Bases session
98-157 RICH P. Krizan, D. Tement Search for Election Rings on the Photon Detector of the HERA-B RCIH
98-156 RICH P. Krizan, M. Staric RICH in the ECAL Background Suppression in the 98 Running
98-155 Outer Tracker H. Kolanoski Der OUTER TRACKER des HERA-B Experimentes
98-154 Software R. Mankel, A. Spiridonov Ranger - a Pattern Recognition Algorithm for the HERA-B Main Tracking System. Part II: The HERA-B Magnet Tracker
98-153 Trigger N. van Remortel TFU Mapping of the OTR for the First-Level-Trigger System at Hera-B
98-152 Outer Tracker C. Padilla et al Outer Tracker Meeting, Sept. 17th, 1998, Part 2
98-151 Outer Tracker C. Padilla et al Outer Tracker Meeting, Sept. 17th, 1998, Part 1
98-150 General J. Spengler HERA-B: Status and Plans `98/99
98-149 Inner Tracker U. Straumann et al Operation of a large GEM-MSCG detector in a high intensity hadronic test beam using fully pipelined readout electronics
98-148 Trigger J.D. Hansen, M. Medinnis, S. Schmidt, S. Xella SLT Performance in the '98 Scenario.
98-147 VDET I. Abt et al. Meeting of the HERA-B VDS Group. MPI - Muenchen, September 4th, 1998.
98-146 Outer Tracker G. Bohm Compilation on OTR Stability.
98-145 Physics T. Oest et al Physics Meeting, Sept. 4th, 1998
98-144 Outer Tracker C. Padilla et al Outer Tracker Meeting, Sept. 3rd, 1998
98-143 Physics J. Ivarsson Prospects of Measuring the bb Cross Section in the J/Psi channel with the HERA-B 98 Detector Configuration
98-142 RICH HERA-B RICH Group First Light
98-141 Outer Tracker C. Padilla et al Outer Tracker Meeting, Aug. 13th, 1998, Part 2
98-140 Outer Tracker C. Padilla et al Outer Tracker Meeting, Aug. 13th, 1998, Part 1
98-139 Outer Tracker K. Berkhahn, G. Bohm, Ch. Stegmann Dropping of wire tension in OTR
98-138 Outer Tracker A. Schwarz et al Outer Tracker Meeting, July 30th, 1998
98-137 High-p_t K. Arms, A.J. Schwartz Measurements of Resistivity of Kapton Film for Use in Straw Tube Fabrication.
98-136 High-p_t V. Balagura et al. The possibility of measuring angle $\gamma$ using $B^0\rightarrow K^+\pi^-$ and $\bar{B^0}\rightarrow K^-\pi^+$ decays at HERA-B
98-135 Outer Tracker A. Schwarz et al Outer Tracker Meeting, July 16th, 1998, Part 2
98-134 Outer Tracker A. Schwarz et al Outer Tracker Meeting, July 16th, 1998, Part 1
98-133 Software A. Spiridonov Optimized Integration of the Equations of Motion of a Particle in the HERA-B Magnet
98-132 Physics I. Arinyo et al. HERA-B Physics Options in the 1998 Run.
98-131 Talks A. Schwarz et al. Meeting with PRC referees, July 7th, 1998, Part 2
98-130 Talks A. Schwarz et al. Meeting with PRC referees, July 7th, 1998, Part 1
98-129 Software O. Igonkina MARPLE -Version 1.03-
98-128 Outer Tracker A. Schwarz et al. Outer Tracker Meeting DESY Zeuthen, June 25th, 1998.
98-127 Physics T. Oest Coll. Meeting, June 12th, 1998, Report II from Physics Meetings, plenary talk
98-126 Physics A. Zoccoli Coll. Meeting, June 12th, 1998, Status of Run 98 Reco. and Physics Studies, plenary talk
98-125 Trigger S. Schmidt Coll. Meeting, June 12th, 1998, SLT performance in the 98' scenario and L3-Trigger SiVD reco., plenary talk
98-124 Farm A. Gellrich Coll. Meeting, June 12th, 1998, Farms, plenary talk
98-123 DAQ F. Sanchez Coll. Meeting, June 12th, 1998, Data Path Items, plenary talk
98-122 DAQ J. Zweizig Coll. Meeting, June 12th, 1998, Data Acquisition Control and Monitoring, plenary talk
98-121 Trigger E. Gerndt Coll. Meeting, June 12th, 1998, FLT, plenary talk
98-120 Muon R. Harr Coll. Meeting, June 12th, 1998, Muon Summary, plenary talk
98-119 ECAL A. Golutvin Coll. Meeting, June 11th, 1998, Status of the Calorimeter, plenary talk
98-118 TRD V. Saveliev Coll. Meeting, June 11th, 1998, TRD, plenary talk
98-117 RICH R. Eckmann Coll. Meeting, June 11th, 1998, RICH, plenary talk
98-116 High-p_t A. Schwartz Coll. Meeting, June 11th, 1998, High_pt, plenary talk
98-115 Outer Tracker A. Schwarz Coll. Meeting, June 11th, 1998, Outer Tracker HERA-B, plenary talk
98-114 Inner Tracker B. Schmidt Coll. Meeting, June 11 th, 1998, Status of Inner Tracker, Plenary Talk
98-113 VDET K. T. Knoepfle Coll. Meeting, June 8th-12th, 1998, Vertex Detector System, Plenary Talk
98-112 Target K. Ehret Coll. Meeting, June 8th-12th, 1998, HERA-B Target Status&Plans `98, Plenary Talk
98-111 Run C. Padilla Coll. Meeting, June 8th-12th, 1998, 1998 Run Coordination, Plenary Talk
98-110 Technical Board J. Spengler Coll. Meeting, June 8th-12th, 1998, Tech. Coordinator Report, plenary talk
98-109 Magnet A. Donat et al. Coll. Meeting, June 8th-12th, 1998, magnet chamber design coord. (ITR/OTR/High-pt interface) session
98-108 Technical Board J. Spengler et al. Coll. Meeting, June 8th-12th, 1998, Technical Board meeting
98-107 VDET K. T. Knoepfle et al. Coll. Meeting, June 8th-12th, 1998, Vertex Detector session
98-106 Physics T. Oest et al. Coll. Meeting, June 8th-12th, 1998, Physics working group
98-105 Muon R. Harr et al. Coll. Meeting, June 8th-12th, 1998, Muon Group session
98-104 Software H. Albrecht et al. Coll. Meeting, June 8th-12th, 1998, Software session
98-103 Inner Tracker B. Schmidt, G. Zech et al. Coll. Meeting, June 8th-12th, 1998, ITR-Elektronic session
98-102 Outer Tracker H. Kapitza, M. Walter et al. Coll. Meeting, June 8th-12th, 1998, Outer Tracker session, Part 3
98-101 Outer Tracker H. Kapitza, M. Walter et al. Coll. Meeting, June 8th-12th, 1998, Outer Tracker session, Part 2
98-100 Outer Tracker O. Steinkamp, M. Walter et al. Coll. Meeting, June 8th-12th, 1998, Outer Tracker session, Part 1
98-099 High-p_t M. Danilov, A. Schwartz et al. Coll. Meeting, June 8th-12th, 1998, High-pt session
98-098 DAQ J. Zweizig et al. Coll. Meeting, June 8th-12th, 1998, DAQ session
98-097 Farm J. Zweizig et al. Coll. Meeting, June 8th-12th, 1998, Farm session
98-096 RICH P. Krizan et al. Coll. Meeting, June 8th-12th, 1998, RICH session, Part 2
98-095 RICH P. Krizan et al. Coll. Meeting, June 8th-12th, 1998, RICH session, Part 1
98-094 Trigger E. Gerndt et al. Coll. Meeting, June 8th-12th, 1998, FLTSIM sesssion
98-093 Trigger D. Ressing et al. Coll. Meeting, June 8th-12th, 1998, Pretriggers and FLT
98-092 Software T. Oest et al. Coll. Meeting, June 8th-12th, 1998, Calibration, Alignment, Database
98-091 Run C. Padilla et al. Coll. Meeting, June 8th-12th, 1998, Run `98 coordination
98-090 Target K. Ehret et al. Coll. Meeting, June 8th-12th, 1998, Target session
98-089 Physics Avakian, R.O., Ioannissyan, A.N., Khachatryan, V.G. On the Possibility to Measure Large CP Asymmetries in B^+- -> eta_c(chi c0)pi+- Decays at HERA-B.
98-088 RICH R. Schwitters Rings Upon Rings: A New Approach to Pattern Recognition in Ring-Imaging Cerenkov Detectors
98-087 Outer Tracker A. Schwarz et al. Outer Tracker Meeting May 14th, 1998, Part 2
98-086 Outer Tracker A. Schwarz et al. Outer Tracker Meeting May 14th, 1998, Part 1
98-085 Physics W. Schmidt-Parzefall et al. Physics Meeting, May 5th, 1998, Zeuthen, Part 3
98-084 Physics W. Schmidt-Parzefall et al. Physics Meeting, May 5th, 1998, Zeuthen, Part 2
98-083 Physics W. Schmidt-Parzefall et al. Physics Meeting, May 5th, 1998, Zeuthen, Part 1
98-082 Outer Tracker M. Bahte et al. ASD-8 Noise Tests at the MC-2 Cable Frame.
98-081 Outer Tracker M. Bahte et al. Revised Grounding Scheme for the OTR Front End Electronics.
98-080 Physics D. Samtleben Studies for a Charge Tag at HERA-B.
98-079 Software R. Mankel Ranger - Pattern Recognition algorithm for the HERA-B Main Tracking System. Part IV: The Object-Oriented Track Fit.
98-078 Trigger B. Schwenninger Data Format for the Muon Pixel Mapping Boards and the Pretrigger Link Boards for the Pixel System.
98-077 Outer Tracker A. Bel`kov, I. Golutvin, Yu. Kiryushin, A. Vishnevsky Status of Straw Modules at Dubna
98-076 Outer Tracker A. Bel`kov et al. JINR Cosmic Test of Honeycomb Drift Chambers
98-075 Outer Tracker A. Bel`kov et al. JINR Test of the Honeycomb Drift Chambers by Radiactive Source
98-074 Software H. Albrecht et al. Software Meeting, May 4/5th, 1998, Zeuthen, Part 2
98-073 Software H. Albrecht et al. Software Meeting, May 4/5th, 1998, Zeuthen, Part 1
98-072 Outer Tracker M. Atkins, R. Eighteen, L. Jones, I. Siccama, O. Steinkamp Measurement of the gas flow through an
98-071 Software R. Mankel et al. `98 Run working Group Meeting, April 6th, 1998
98-070 RICH R. Schwitters Preliminary Analysis of RICH Survey Data
98-069 Trigger F. Ratnikov The Input Connection for the FLT Superlayer TC2
98-068 Outer Tracker A. Schwarz et al. Outer Tracker Meeting, April 2nd, 1998, Hamburg
98-067 Outer Tracker M. Beck, R. Zimmermann HSPICE Simulation of the GTL input circuit of the HERA-B TDC chip
98-066 Outer Tracker M. Bruinsma, J. Hogenbirk, O. Steinkamp Documentation on the First Level Trigger Linkboard
98-065 Software A. Bel'kov, A. Lanyov, A. Moshkin Techniques of Muon Detector - OTR Track Matching
98-064 General A. Kharchilava B bbar Production Cross Section in Dimuon Final States: Signal Versus Background.
98-063 RICH I. Arinyo et al. Test of the ASD8 Boards.
98-062 Outer Tracker A. Schwarz et al. Outer Tracker Meeting, March 19th, 1998, Zeuthen, Part 2
98-061 Outer Tracker A. Schwarz et al. Outer Tracker Meeting, March 19th, 1998, Zeuthen, Part 1
98-060 Outer Tracker H. Deckers et al. Beam Tests of Honeycomb Drift Chambers.
98-059 Software H. Albrecht et al. Software-Meeting, March 9-10th, 1998, Bologna, Part 3
98-058 Software H. Albrecht et al. Software-Meeting, March 9-10th, 1998, Bologna, Part 2
98-057 Software H. Albrecht et al. Software-Meeting, March 9-10th, 1998, Bologna, Part 1
98-056 Outer Tracker M. Beck, R. Zimmermann Results of the Power Load Tests of the Switching Power Supplies
98-055 RICH P. Krizan et al. Coll. Meeting, Febr. 2nd-6th, 1998, RICH session
98-054 Outer Tracker M. Walter et al. Outer Tracker Meeting, Febr. 19th, 1998, Zeuthen, Part 2
98-053 Outer Tracker M. Walter et al. Outer Tracker Meeting, Febr. 19th, 1998, Zeuthen, Part 1
98-052 RICH D. Dujmic, R. Schwitters Location of Best Focus for RICH Photon Detectors
98-051 Talks R. Mankel Status Report, PRC Open Session, Febr. 3rd, 1998
98-050 High-p_t M. Danilov Coll. Meeting, Febr. 2nd-6th, 1998, High-p_t Pretrigger Status Report, Plenary meeting
98-049 Technical Board J. Spengler Coll. Meeting, Febr. 2nd-6th, 1998, Tech. Coordinator Report, Plenary meeting
98-048 Software H. Albrecht Coll. Meeting, Febr. 2nd-6th, 1998, Software Status Report, Plenary meeting
98-047 Trigger M. Medinnis Coll. Meeting, Febr. 2nd-6th, 1998, SLT/TLT Algorithms, Plenary meeting
98-046 Farm M. Dam Coll. Meeting, Febr. 2nd-6th, 1998, Farms, Plenary meeting
98-045 DAQ F. Sanchez Coll. Meeting, Febr. 2nd-6th, 1998, Data Path Items, Plenary meeting
98-044 DAQ D. Ressing Coll. Meeting, Febr. 2nd-6th, 1998, Control Systems, Plenary meeting
98-043 Trigger E. Gerndt Coll. Meeting, Febr. 2nd-6th, 1998, FLTSIM Status, Plenary meeting
98-042 Muon Yu. Zaitsev Coll. Meeting, Febr. 2nd-6th, 1998, Status of the Muon System, Plenary meeting
98-041 ECAL M. Bruschi Coll. Meeting, Febr. 2nd-6th, 1998, ECAL Status Report, Plenary meeting
98-040 TRD V. Saveliev Coll. Meeting, Febr. 2nd-6th, 1998, HERA-B TRD, Plenary meeting
98-039 RICH P. Krizan Coll. Meeting, Febr. 2nd-6th, 1998, RICH Status Report, Plenary meeting
98-038 Outer Tracker A. S. Schwarz Coll. Meeting, Febr. 2nd-6th, 1998, Outer Tracker HERA-B, Plenary meeting
98-037 Inner Tracker U. Straumann Coll. Meeting, Febr. 2nd-6th, 1998, Inner Tracking Report, Plenary meeting
98-036 VDET K. T. Knoepfle Coll. Meeting, Febr. 2nd-6th, 1998, Vertex Detector System, Plenary meeting
98-035 Target S. Spratte Coll. Meeting, Febr. 2nd-6th, 1998, Target - Status, Results & Plans, Plenary meeting
98-034 Technical Board J. Spengler et al. Coll. Meeting, Febr. 2nd-6th, 1998, Technical Board session
98-033 Outer Tracker A. Donat et al. Coll. Meeting, Febr. 2nd-6th, 1998, ITR/OTR/High-pt Interface session
98-032 Outer Tracker D. Ressing, R. Wurth et al. Coll. Meeting, Febr. 2nd-6th, 1998, Straw Tracker session
98-031 VDET K. T. Knoepfle et al. Coll. Meeting, Febr. 2nd-6th, 1998, Vertex Detector session
98-030 High-p_t M. Danilov, A. Schwartz Coll. Meeting, Febr. 2nd-6th, 1998, High-pt session
98-029 Software T. Oest et al. Coll. Meeting, Febr. 2nd-6th, 1998, Software session, Part 2
98-028 Software T. Oest et al. Coll. Meeting, Febr. 2nd-6th, 1998, Software session, Part 1
98-027 Muon R. Harr, Yu. Zaitsev et al. Coll. Meeting, Febr. 2nd-6th, 1998, MUON session
98-026 Outer Tracker H. Kapitza, M. Walter et al. Coll. Meeting, Febr. 2nd-6th, 1998, Outer Tracker session
98-025 Trigger E. Gerndt et al. Coll. Meeting, Febr. 2nd-6th, 1998, FLTSIM session
98-024 DAQ J. Zweizig et al. Coll. Meeting, Febr. 2nd-6th, 1998, SLT/Farm/DAQ/HLT session
98-023 Trigger E. Gerndt et al. Coll. Meeting, Febr. 2nd-6th, 1998, FLT Link session
98-022 DAQ J. Zweizig et al. Coll. Meeting, Febr. 2nd-6th, 1998, SLT/Farm/DAQ session
98-021 Trigger D. Ressing et al. Coll. Meeting, Febr. 2nd-6th, 1998, Pretriggers and FLT session, Part 2
98-020 Trigger D. Ressing et al. Coll. Meeting, Febr. 2nd-6th, 1998, Pretriggers and FLT session, Part 1
98-019 Software T. Oest et al. Coll. Meeting, Febr. 2nd-6th, 1998, Software session, Part 2
98-018 Software T. Oest et al. Coll. Meeting, Febr. 2nd-6th, 1998, t, Software session, Part 1
98-017 Target K. Ehret et al. Coll. Meeting, Febr. 2nd-6th, 1998, Target session
98-016 Talks W. Hofmann et al. Open Meeting with PRC Referees, Febr. 2nd 1998, Hamburg, Part 2
98-015 Talks W. Hofmann et al. Open Meeting with PRC Referees, Febr. 2nd 1998, Hamburg, Part 1
98-014 Trigger E. Gerndt Summary of FLTSIM Meeting, Bologna, Dec. 3rd-7th, 1997.
98-013 Outer Tracker A. Schwarz et al. Outer Tracker Meeting, January 21st, 1998, DESY Zeuthen, Part 3
98-012 Outer Tracker A. Schwarz et al. Outer Tracker Meeting, January 21st, 1998, DESY Zeuthen, Part 2
98-011 Outer Tracker A. Schwarz et al. Outer Tracker Meeting, January 21st, 1998, DESY Zeuthen, Part 1
98-010 High-p_t A.J. Schwartz and A.G. Tumanov Analysis of Beam Data for a High-pt Outer Prototype Chamber.
98-009 High-p_t A.G. Tumanov, A.J. Schwartz Further Monte Carlo Study of the High-pt Pretrigger for HERA-B.
98-008 Gas M. Walter et al. HERA-B Meeting: Gas - systems, Friday Dec. 12th, 1997 in Hamburg
98-007 Trigger T. Fuljahn et al. Concept of the First Level Trigger for HERA-B (submitted to the RT97 Beaune, France)
98-006 Trigger E. Gerndt Trigger Link Meeting in Hamburg, January 8th-9th, 1998.
98-005 Outer Tracker A. Schwarz et al. Outer Tracker Meeting in Hamburg: January 7th, 1998.
98-004 VDET I. Abt, K. T. Knoepfle et al. VDS Software Meeting, Dec. 11th, 1997, Munich, Part 3
98-003 VDET I. Abt, K. T. Knoepfle et al. VDS Software Meeting, Dec. 11th, 1997, Munich, Part 2
98-002 VDET I. Abt, K. T. Knoepfle et al. VDS Software Meeting, Dec. 11th, 1997, Munich, Part 1
98-001 Software T. Oest Fast Particle Tracing through the HERA-B Magnetic Field
97-261 Inner Tracker S. Hennenberger, F. Eisele Coll. Meeting, October 6th-10th, 1997, ITR session
97-260 Outer Tracker H. Kapitza, M. Walter Coll. Meeting, October 6th-10th, 1997, Outer Tracker session
97-259 Outer Tracker A. Lanyov Modular OTR Geometry Description in ARTE
97-258 Software M. Medinnis et al. Software Meeting, Dec. 15th 1997, Zeuthen, Part 2
97-257 Software M. Medinnis et al. Software Meeting, Dec. 15th 1997, Zeuthen, Part 1
97-256 DAQ U. Uwer The HERA-B Slow Control Software: Guidelines V1.0.
97-255 Physics J. Thom B - Mixing at SLD.
97-254 Outer Tracker A. Schwarz et al. GERNERAL Outer Tracker Meeting, December 10th, 1997, in Zeuthen. Part II.
97-253 Outer Tracker A. Schwarz et al. GENERAL Outer Tracker meeting, December 10th, 1997 in Zeuthen. Part I.
97-252 High-p_t V. Popov Review of the readout and the Pretrigger logic for the Inner Part of the High pt Pretrigger System.
97-251 VDET K. Riechmann Overview of the HERA-B Vertex Detector System and First Results from Prototype Runs.
97-250 Target Anon. et al. Target Group Meeting in Dortmund, Dec. 4th/5th, 1997
97-249 Technical Board J. Spengler et al Minutes of the Meeting of the Technical Board, Dez. 5th, 1997
97-248 Inner Tracker G. Zech Contribution of MSGC Components to radiation effects.
97-247 RICH J. A. Bastos Refractive Index Measurement in the HERA-B RICH Detector in the VUV Region
97-246 Outer Tracker H. Kolanoski et al. Outer Tracker Meeting Wednesday November 26th, 1997 in Hamburg.
97-245 Trigger M. Medinnis Report to PRC Referees, PRC-Referee-Meeting, November 28th, 1997
97-244 Physics T. Lohse Update on 1998 Physics with HERA-B, PRC-Referee-Meeting, November 28th, 1997
97-243 VDET K. T. Knoepfle Vertex Detector System, PRC-Referee-Meeting, November 28th, 1997
97-242 General R. Wurth FE-Ds Status, PRC-Referee-Meeting, November 28th, 1997
97-241 Inner Tracker B. Schmidt Status of Inner Tracker, PRC-Referee-Meeting, November 28th, 1997
97-240 Trigger D. Ressing FLT HW Status, PRC-Referee-Meeting, November 27th, 1997
97-239 Trigger F. Ratnikov FLT - Possibilities for reduced Detector Configuration, PRC-Referee-Meeting, November 27th, 1997
97-238 RICH R. Eckmann RICH, PRC-Referee-Meeting, November 27th, 1997
97-237 General W. Hofmann Current Status of the Detektor and Installation for `98 Run, PRC-Referee-Meeting, November 27th 1997
97-236 Outer Tracker H. Kapitza OTR Production Plans, PRC-Referee-Meeting, November 27th 1997
97-235 Outer Tracker H. Kolanoski Outer Tracker R&D, PRC-Referee-Meeting, November 27th 1997
97-234 Run C. Padilla Results and Lessons learned from the 1997 Run, PRC-Referee-Meeting, November 27th, 1997
97-233 Outer Tracker M. Pohl, A. Somov, U. Uwer Study of ASD-8 noise level for different shielding of output signal cables.
97-232 Software H. Albrecht et al. Software Meeting: November 12th, 1997 at DESY Hamburg.
97-231 High-p_t A. Schwartz Design of the Pad Plane for Outer High_pt Chambers.
97-230 High-p_t C. Lu Cooling Method of the ASD-8 Chip.
97-229 Target K. Ehret HERA-B Target: Running 1997 and Requests for `98
97-228 Outer Tracker M. Sans, U. Uwer Measurements of the Efficiency of TC-Modules with Cosmic Particles.
97-227 Outer Tracker H. J. Wilczek Elektronische Eigenschaften der Wabendriftkammern des HERA-B Experimentes. Diplomarbeit
97-226 Outer Tracker K. Berkhan et al. Outer Tracker R&D group meeting, October 16th and October 30th, 1997.
97-225 Outer Tracker M. Beck, R. Zimmermann Results of long Sharc Link cable Tests at Hamburg.
97-224 Software B. Lewendel et al. Decision on the Hera-B Data Base Management Scheme
97-223 Software R. Mankel Coll. Meeting, October 6th-10th, 1997, Heavy Quark Cross Section Measurements, Plenary meeting
97-222 Run C. Padilla Coll. Meeting, October 6th-10th, 1997, Run Coordinator Report, Plenary meeting
97-221 General H. Kapitza Coll. Meeting, October 6th-10th, 1997, 10 Golden Safety Rules, Plenary meeting
97-220 Technical Board J. Spengler Coll. Meeting, October 6th-10th, 1997, Tech. Coordinator Report, Plenary meeting
97-219 Software T. Oest Coll. Meeting, October 6th-10th, 1997, Software Status, Plenary meeting
97-218 Trigger M. Medinnis Coll. Meeting, October 6th-10th, 1997, SLT/TLT Algorithms, Plenary meeting
97-217 Farm A. Gellrich Coll. Meeting, October 6th-10th, 1997, Farms, Plenary meeting
97-216 DAQ J. Zweizig Coll. Meeting, October 6th-10th, 1997, DAQ System, Plenary meeting
97-215 Slow Control U. Uwer Coll. Meeting, October 6th-10th, 1997, Slow Control System, Plenary meeting
97-214 Trigger E. Gerndt Coll. Meeting, October 6th-10th, 1997, HERA-B First Level Trigger Status and Plans, Plenary meeting
97-213 Muon S. F. Takach Coll. Meeting, October 6th-10th, 1997, Muon Report, Plenary meeting
97-212 ECAL A. Zoccoli Coll. Meeting, October 6th-10th, 1997, Status of the HERA-B Calorimeter, Plenary meeting
97-211 TRD V. Saveliev Coll. Meeting, October 6th-10th, 1997, HERA-B TRD Status Report, Plenary meeting
97-210 RICH R. Eckmann Coll. Meeting, October 6th-10th, 1997, RICH Status, Plenary meeting
97-209 High-p_t A. Schwartz Coll. Meeting, October 6th-10th, 1997, Status of High-p_t Chambers, Plenary meeting
97-208 Outer Tracker M. Walter Coll. Meeting, October 6th-10th, 1997, Outer Tracker Status, Plenary meeting
97-207 Inner Tracker B. Schmidt Coll. Meeting, October 6th-10th, 1997, Status of the Inner Tracker, Plenary meeting
97-206 VDET M. Schmelling Coll. Meeting, October 6th-10th, 1997, Status of the Vertex Detector System, Plenary meeting
97-205 Target V. Pugatch Coll. Meeting, October 6th-10th, 1997, Target Report, Plenary meeting
97-204 General A. Schwarz Coll. Meeting, October 6th-10th, 1997, Status of HERA-B, Spokesman's Report, Plenary meeting
97-203 Muon R. Harr, Y. Zaitsev et al. Coll. Meeting, October 6th-10th, 1997, Muon session
97-202 High-p_t M. Danilov, A. Schwartz et al. Coll. Meeting, October 6th-10th, 1997, High-p_t session
97-201 Inner Tracker B. Schmidt et al. Coll. Meeting, October 6th-10th, 1997, ITR session, Part 2
97-200 Inner Tracker B. Schmidt et al. Coll. Meeting, October 6th-10th, 1997, ITR session, Part 1
97-199 Trigger J. Zweizig et al. Coll. Meeting, October 6th-10th, 1997, HLT Algorithms session
97-198 Software B. Lewendel et al. Coll. Meeting, October 6th-10th, 1997, Software session, Part 3
97-197 Software B. Lewendel et al. Coll. Meeting, October 6th-10th, 1997, Software session, Part 2
97-196 Software B. Lewendel et al. Coll. Meeting, October 6th-10th, 1997, Software session, Part 1
97-195 Muon R. Harr, Y. Zaitsev et al. Coll. Meeting, October 6th-10th, 1997, Muon session
97-194 Outer Tracker H. Kapitza, M. Walter et al. Coll. Meeting, October 6th-10th, 1997, Outer Tracker session
97-193 VDET K. T. Knoepfle et al. Coll. Meeting, October 6th-10th, 1997, Vertex Detector session
97-192 Inner Tracker U. Straumann et al. Coll. Meeting, October 6th-10th, 1997, ITR-Electronik session
97-191 DAQ J. Zweizig et al. Coll. Meeting, October 6th-10th, 1997, SLT/FARM/DAQ session
97-190 Outer Tracker H. Kapitza, M. Walter et al. Coll. Meeting, October 6th-10th, 1997, Outer Tracker session
97-189 Target K. Ehret et al. Coll. Meeting, October 6th-10th, 1997, Target session
97-188 RICH P. Krizan et al. Coll. Meeting, October 6th-10th, 1997, RICH session
97-187 Outer Tracker H. Kapitza, M. Walter et al. Coll. Meeting, October 6th-10th, 1997, Outer Tracker session
97-186 DAQ J. Zweizig et al. Coll. Meeting, October 6th-10th, 1997, SLT/Farm/DAQ session
97-185 RICH P. Krizan et al. Coll. Meeting, October 6th-10th, 1997, RICH session
97-184 RICH R. Eckmann, D. Broemmelsiek Coll. Meeting, October 6th-10th, 1997, RICH session
97-183 Trigger D. Ressing et al. Coll. Meeting, October 6th-10th, 1997, FLT/Pretrigger session
97-182 RICH D. Dujmic, K. Reeves Mirror Tiling for RICH Detector
97-181 RICH A. Gorisek, P. Krizan HERA-B RICH Optical System Alignment with Data
97-180 Target K. Ehret Performance of the HERA-B Target and Interference with HERA Operation.
97-179 Trigger C. Baldanza, M. Bruschi,I.D`Antone Pipeline Architecture of the HERA-B Pretrigger Controller
97-178 Trigger C. Baldanza, M. Bruschi, I. D`Antone, M. Piccinini, M. Zuffa HERA-B Ecal Pretrigger Board Description
97-177 Trigger C. Baldanza, M. Bruschi, I.D`Antone A Cellular Automaton for Cluster Selection in the HERA-B Pretrigger Board
97-176 Software B. Lewendel, D. Ressing Linux Based Work Group Servers for HERA-B
97-175 Target V. Pugatch et al. Hera-B Target Workshop `97, August 19th - 25th, 1997, Kiev, Part 3
97-174 Target V. Pugatch et al. Hera-B Target Workshop `97, August 19th - 25th, 1997, Kiev, Part 2
97-173 Target V. Pugatch et al. Hera-B Target Workshop `97, August 19th - 25th, 1997, Kiev, Part 1
97-172 High-p_t I. Belyaev High-p_t Software Meeting, September 15th 1997, Hamburg
97-171 Software P. Weyers A Fast Track Matching Technique for the 1998 Detector Configuration
97-170 Target K. Ehret HERA-B Target Operation in 97. Interference with HERA.
97-169 Outer Tracker M. Walter et al. Outer Tracker Meeting, DESY - Hamburg, September 8-9th, 1997. Part II.
97-168 Outer Tracker M. Walter et al. Outer Tracker Meeting, DESY - Hamburg, September 8-9th, 1997. Part I.
97-167 Software B. Fominykh MUREC-A Reconstruction Program for HERA-B Muon Detector operating in Stand-alone mode
97-166 Software J. Ivarsson, A. Somov Measuring Y Production with the 1998 Detector Configuration.
97-165 Software T. Oest Particle Tracing through the HERA-B Magnetic Field.
97-164 Talks M. Bruschi HERA-B Status Report, 43rd PRC Meeting, July 24th, 1997, Hamburg
97-163 Talks W. Schmidt-Parzefall HERA-B, an Experiment to study CP Violation at the HERA Proton Ring using an internal Target. (Talk held at the b20 Symposium, 29.06.- 02.07.97, Chicago
97-162 RICH R. Eckmann et al. Measurements of a Three-lens Light Collector.
97-161 VDET K. Riechmann Estimates of Radiation Damage in Cooled Detectors.
97-160 VDET I. Abt et al. Gluing Silicon with Silicone.
97-159 DAQ D. Ressing et al. DAQ-Meeting, August 27th-29th, 1997, Kopenhagen, Part 2
97-158 DAQ D. Ressing et al. DAQ-Meeting, August 27th-29th, 1997, Kopenhagen, Part 1
97-157 Farm A. Gellrich Supported Software Platforms in HERA-B.
97-156 Farm A. Gellrich Application Software on the Farm.
97-155 Farm A. Gellrich, B. Lewendel Mass Storage Management on the Farm.
97-154 Technical Board J. Spengler et al. Minutes of the Meeting of the Technical Board, August 22nd, 1997, Hamburg
97-153 Software T. Oest How to Use the V0 Reconstruction Package V0fit.
97-152 VDET Iris Abt et al. Meeting of the HERA-B VDS Group, Munich, August 8th, 1997
97-151 Muon M. W. Buchler Prospects for J/psi Production at Hera-B
97-150 ECAL O. Igonkina, R. Spighi, M. Villa, A. Zoccoli ECAL Performances for J/psi Reconstruction
97-149 Outer Tracker H. Kapitza et al. Outer-Tracker Meeting, July 14-15th, 1997 Part 2
97-148 General T. Lohse, R. Mankel PRC Talk, July 24th, 1997: Detector Optimization for the 1998 Physics Run.
97-147 Outer Tracker H. Kapitza et al. Outer-Tracker Meeting, July 14-15th, 1997 Part 1
97-146 Run C. Padilla Run-Meeting, 18th July, 1997
97-145 Trigger B. Schwenninger Untersuchungen der Myon-Pretrigger-Elektronik fuer das HERA-B Experiment. Diplomarbeit
97-144 General T. Lohse, R. Mankel Detector Optimization for the 1998 Physics Run
97-143 Software H. Albrecht et al. Software-Meeting, July 9th, 1997, Zeuthen, Part 2
97-142 Software H. Albrecht et al. Software-Meeting, July 9th, 1997, Zeuthen, Part 1
97-141 RICH J. Pyrlik, K. Lau Proposal for a High Voltage System for the RICH
97-140 Farm A. Gellrich et al. Status of the HERA-B L3/L4 Farm Project
97-139 Farm A. Gellrich et al. A Prototype System for the Processor Farm of the HERA-B Experiment at HERA
97-138 RICH T. Zivko, P. Krizan What is the preferred Radius of the Beam Shroud in the RICH Vessel?
97-137 Run C. Padilla, P. Kreuzer Run-Meeting, July 4th 1997
97-136 Run C. Hast Run Meeting: June 20th, 1997
97-135 ECAL M. Villa Progress Report on the ECAL Reconstruction Software.
97-134 Trigger G. Zech Contribution of IT Stations 14/15 to Trigger Efficiency.
97-133 Technical Board J. Spengler HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: Technical Coordinator Report/Run 98.
97-132 Software R. Mankel HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: Software.
97-131 Trigger M. Medinnis HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: SLT/TLT Algorithm.
97-130 Farm A. Gellrich HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: Farms.
97-129 DAQ J. Luedemann HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: Data Path Items.
97-128 DAQ J. G. Zweizig HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: Run and Slow Control.
97-127 Trigger F. Ratnikov HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: FLT.
97-126 Muon R. Harr HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: Muon.
97-125 ECAL A. Golutvin HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: Calorimeter.
97-124 TRD V. Saveliev HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: TRD.
97-123 RICH P. Krizan HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: RICH.
97-122 High-p_t M. Danilov HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: High-pt.
97-121 Outer Tracker H. Kapitza HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: Outer Tracker.
97-120 Inner Tracker B. Schmidt HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: Inner Tracker.
97-119 VDET K.T. Knoepfle HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: Vertex Detector.
97-118 Target C. Hast HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: Target.
97-117 Run C. Padilla HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: RUN.
97-116 General A. Schwarz HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: Spokesman Report and Discussion.
97-115 General A. Wagner HERA-B Coll. Meeting, June 9th-13th, 1997. Plenary Session: Report from the DESY Directorate.
97-114 High-p_t M. Danilov, A. Schwartz et al. HERA-B Coll. Meeting, June 9th-13th, 1997. Parallel Session: High-pt.
97-113 Technical Board J. Spengler et al. HERA-B Coll. Meeting, June 9th-13th,1997. Technical Board Meeting.
97-112 Inner Tracker B. Schmidt et al. HERA-B Coll. Meeting, June 9th-13th, 1997. Parallel Session: Inner Tracker.
97-111 Software P. Weyers et al. HERA-B Coll. Meeting, June 9th-13th, 1997. Parallel Session: Software. Part II.
97-110 Software P. Weyers et al. HERA-B Coll. Meeting, June 9th-13th, 1997. Parallel Session: Software. Part I.
97-109 Trigger J. Zweizig et al. HERA-B Coll. Meeting, June 9th-13th, 1997. HLT Algorithms.
97-108 VDET K.-T. Knoepfle et al. HERA-B Coll. Meeting, June 9th-13th, 1997. Parallel Session: VDS.
97-107 Technical Board M. Walter et al. HERA-B Coll. Meeting, June 9th-13th, 1997. Parallel Session: ITR/OTR Interface.
97-106 Outer Tracker H. Kapitza, M. Walter et al. HERA-B Coll. Meeting, June 9th-13th, 1997. Parallel Session: Outer Tracker.
97-105 Muon R. Harr et al. HERA-B Coll. Meeting, June 9th-13th, 1997. Parallel Session: Muon.
97-104 Outer Tracker H. Kapitza, M. Walter HERA-B Coll. Meeting, June 9th-13th, 1997. Parallel Session: Outer Tracker.
97-103 Inner Tracker B. Schmidt et al. HERA-B Coll. Meeting, June 9th-13th, 1997. Parallel Session: ITR - Electronik.
97-102 RICH P. Krizan et al. HERA-B Coll. Meeting, June 9th-13th, 1997. Parallel Session: RICH.
97-101 DAQ J. Zweizig et al. HERA-B Coll. Meeting, June 9th-13th, 1997. Parallel Session: SLT/Farm/DAQ.
97-100 RICH P. Krizan et al. HERA-B Coll. Meeting, June 9th-13th, 1997. Parallel Session: RICH.
97-099 DAQ J. Zweizig et al. HERA-B Coll. Meeting, June 9th-13th, 1997. Parallel Session: SLT/FARM/DAQ (morning).
97-098 Technical Board J. Spengler et al. HERA-B Coll. Meeting, June 9th-13th, Parallel Session: Gas Systems.
97-097 RICH P. Krizan et al. HERA-B Coll. Meeting, June 9th-13th, 1997. Parallel Session: RICH.
97-096 Target K. Ehret et al. HERA-B Coll. Meeting, June 9th - 13th, 1997. Parallel Session: TARGET.
97-095 Trigger D. Ressing et al HERA-B Coll. Meeting, June 9th - 13th, 1997. Pararell session: Pretriggers and FLT.
97-094 Inner Tracker M. Enkelmann, G. Zech Simulation of Photon Propagation in a Fiber Tracker
97-093 Run K. Riechmann, V. Saveliev Run Meeting (VDS-TRD), May 30, `97
97-092 Run M. Beck Run Meeting (OTR), May 23, `97
97-091 RICH T. Zeuner Test of Hamamatsu R5900-M16 and M64 Photomultipliers
97-090 Software R. Mankel Prism - the HERA-B Event Display and its Tcl/Tk User Interface
97-089 Outer Tracker H. Kapitza et al OTR-Meeting, April, 15-16th, 1997, Amsterdam
97-088 RICH R. F. Schwitters Quality of Focus and Depth of Field in the HERA-B RICH Optical System.
97-087 Talks C. Hast HERA-B: An Experiment to Study CP-Violation in the B-System Using an Internal Target at the HERA Proton Ring
97-086 DAQ D. Ressing et al. DAQ/Trigger Meeting, May 6th 1997, Hamburg
97-085 Target T. Lohse Wire Target Geometry and Tagging Performance.
97-084 General W. Schmidt-Parzefall HERA-B - ein neues Experiment bei DESY
97-083 High-p_t V. Popov Pretrigger Logic for Inner Region of High pt Detector
97-082 Software R. Mankel r a n g e r - a Pattern Recognition Algorithm for the HERA-B Main Tracking System. Part I: The HERA-B Pattern Tracker.
97-081 Software G. Bohm A Method for fast Shower Simulation
97-080 RICH R. Miquel, T. Zivko, M. Staric, A. Gorisek, P. Krizan, R. Eckmann Software-meeting, 17/18 Apr. `97, Hamburg
97-079 RICH S. Korpar, R. Pestotnik, P. Krizan ASD8 Chip Tests with a Hamamatsu Multi-Anode PMT
97-078 RICH P. Krizan Filling the RICH Radiator Vessel: Mixing of the Gases
97-077 Software O. Igonkina Fast Monte Carlo for HERA-B Calorimeter. Shower Parametrization Function.
97-076 High-p_t I. Belyaev, V. Popov, R. van Staa, A. Schwartz, A. Tumanov, R. Wixted High pt Pretrigger Meeting, Hamburg, 4/4/97
97-075 Muon B. Fominykh, S. Nowak HERA-B Muon Detector in HBGEAN versions 04-04 and 05-01.
97-074 Software H. Albrecht et al Software-Meeting, Hamburg, 13/3/97, Part 2
97-073 Software H. Albrecht et al Software-Meeting, Hamburg, 13/3/97, Part 1
97-072 Software S. Nowak Hit Numbers for different Beampipe Configurations
97-071 General K. Ludwig, G. Knust, H. Kapitza, J. Spengler Minutes of the Meeting of the Technical Board
97-070 DAQ M. Dam et al. DAQ Meeting, 24 Mar.97, Hamburg, Part 2
97-069 DAQ R. Dippel et al. DAQ Meeting, 24 Mar.97, Hamburg, Part 1
97-068 VDET I. Abt et al. Vertex Dtector Meeting, 7 Mar.97, MPI Muenchen, Part 2
97-067 VDET I. Abt et al. Vertex Dtector Meeting, 7 Mar.97, MPI Muenchen, Part 1
97-066 Software P. Weyers, R. Mankel Performance Studies for a Magnet Tracker with a reduced Set of Outer Tracker Superlayers.
97-065 Magnet J. Thom Vorbereitung eines Experimentes zur Messung der B0_s \overline B0_s - Mischung bei HERA-B. Diplomarbeit.
97-064 RICH C. Oehser Entwicklung von Photondetektoren fuer den RICH des HERA-B Detektors. Diplomarbeit.
97-063 Muon M. W. Buchler ASD-8 Circuit Testing.
97-062 Physics J. Thom Vorbereitung eines Experimentes zur Messung der B0_s overline B0_s - Mischung bei HERA-B. Diplomarbeit.
97-061 Software H. Albrecht HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Status of the Software. Plenary Meeting.
97-060 DAQ J. Zweizig HERA-B Coll. Meeting, Feb 3rd - 7th, 1997. DAQ. Plenary Meeting.
97-059 Software J. D. Hansen HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. HLT. Plenary Meeting.
97-058 Farm A. Gellrich HERA-B Coll. Meeting, Feb. 3rd- 7th, 1997. Status of the L3/L4 Farm(s). Plenary Meeting.
97-057 Trigger M. Medinnis HERA-B Coll. Meeting, Feb. 3rd- 7th, 1997. Second Level Trigger Status. Plenary Meeting.
97-056 Trigger D. Ressing HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. FLT Summary. Plenary Meeting.
97-055 Muon S. Takach HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Summary of Muon Electronics. Plenary Meeting.
97-054 Muon S. Barsuk HERA-b Coll. Meeting, Feb. 3rd - 7th, 1997. Muon System in HERA-B. Status Report. Plenary Meeting.
97-053 ECAL M. Bruschi HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. ECAL. Plenary Meeting.
97-052 TRD V. Saveliev HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. TRD. Plenary Meeting.
97-051 RICH R. Eckmann HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. RICH. Plenary Meeting.
97-050 High-p_t A. Schwartz HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. High P_t Pretriggers. Plenary Meeting.
97-049 Outer Tracker M. Walter HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Outer Tracker Status. Plenary Meeting.
97-048 Inner Tracker B. Schmidt HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Situation of the Inner Tracker. Plenary Meeting.
97-047 VDET G. Leffers HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. The Vertex Detector System. Plenary Meeting.
97-046 Target C. Hast HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Target 1996 (++). Plenary Meeting.
97-045 Run C. Padilla HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. 1997 Run Coordination and Plans. Plenary Meeting.
97-044 General J. Spengler HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Technical Coordinator Report. Plenary Meeting.
97-043 General J. Spengler et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Technical Board Meeting.
97-042 Outer Tracker M. Walter et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. ITR/OTR/High-pt Interface Session.
97-041 Software H. Albrecht et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Software Session. Part II.
97-040 Software H. Albrecht et al. HERA-B Coll. Meeting, Feb. 3rd- 7th, 1997. Software Session. Part I.
97-039 Software J. Zweizig et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. HLT Algorithms.
97-038 VDET K.-T. Knoepfle et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Vertex Detector - Afternoon. Part II.
97-037 VDET K.-T. Knoepfle et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Vertex Detector Session - Afternoon. Part I.
97-036 VDET K.-T. Knoepfle et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Vertex Detector Session. Morning Part II.
97-035 VDET K.-T. Knoepfle et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Vertex Detector Session. Morning Part I.
97-034 Outer Tracker H. Kapitza, M. Walter et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Outer Tracker Session.
97-033 High-p_t M. Danilov, A. Schwartz et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. High-pt Session.
97-032 Muon R. Harr et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Muon Session - Afternoon.
97-031 Muon Yu. Zaitsev et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Muon Session - Morning.
97-030 RICH M. Atiya, P. Krizan et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. RICH Session - Morning.
97-029 Outer Tracker H. Kapitza, M. Walter et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Outer Tracker Session.
97-028 Software N. Tesch et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Alignment Session.
97-027 Inner Tracker B. Schmidt et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Inner Tracker Session - Afternoon.
97-026 Inner Tracker B. Schmidt et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Inner Tracker Session - Morning, Part II.
97-025 Inner Tracker B. Schmidt et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Inner Tracking Session - Morning. Part I.
97-024 ECAL M. Bruschi, A. Golutvin et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. ECAL session - Afternoon.
97-023 ECAL M. Bruschi, A. Golutvin et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. ECAL Session - Morning.
97-022 RICH M. Atiya, P. Krizan et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. RICH Session - Afternoon.
97-021 RICH M. Atiya, P. Krizan et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. RICH Session - Morning.
97-020 DAQ J. Zweizig et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. DAQ Session - Afternoon.
97-019 DAQ J. Zweizig et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. DAQ Session - Morning.
97-018 Target K. Ehret, C. Hast et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Target Session.
97-017 Trigger D. Ressing et al. HERA-B Coll. Meeting, Feb. 3rd - 7th, 1997. Pretriggers and FLT Session.
97-016 Software P. J. Weyers, R. Mankel Momentum Reconstruction in the '96 Run
97-015 High-p_t A. J. Schwartz Procedure for Simulation of a Straw Tube Chamber with Pickup Pad Readout
97-014 High-p_t A. J. Schwartz General Formalism of CP Violation in B0 Decays
97-013 High-p_t C. Leonidopoulos Beam-test of a Straw-tube Chamber with Pad Readout
97-012 Inner Tracker A. Lange Influence of a Change in the Inner Tracker Setup on the Readout System.
97-011 Trigger J. Glaess, A. Wurz Detector Data Transmission to the First Level Trigger for HERA-B, Univ. Mannheim, 01/97
97-010 Target K. Ehret Summary of Cohabitation Task Force '96
97-009 Run J. Spengler HERA-B Report, HERA Coor. Meeting, 22/01/97, Hamburg
97-008 High-p_t V. Balagura Gas Pixel Chambers.
97-007 RICH I. Arinyo, L. Garrido Efficiencies of the Proposed Light Collecting System of Lenses.
97-006 Software R. Mankel Online Track Reconstruction for HERA-B, Proc. Beauty '96 NIM A384 (1996)
97-005 Outer Tracker C. Stegmann The Honeycomb Outer Tracker System for HERA-B, Proc. Beauty '96 NIM A384 (1996)
97-004 DAQ J. Zweizig Data Acquisition in the HERA-B and LHC Era, Proc. Beauty '96 NIM A384 (1996)
97-003 Trigger D. Ressing First Level Trigger for HERA-B, Proc. Beauty '96 NIM A384 (1996)
97-002 Physics I. Abt Physics Reach of HERA-B, Proc. Beauty '96 NIM A384 (1996)
97-001 General J. Spengler HERA-B: Overview and 1996 Engineering Run, Proc. Beauty '96 NIM A384 (1996)
96-292 Software J. Rieling SUSi: a Pattern Recognition Algorithm for the HERA-B Silicon Vertex Detector.
96-291 Target M. Braeuer, K. Ehret, C. Hast, S. Issever, S. Spratte, V. Pugatch Target Group Meeting in Dortmund (December 4-5, 1996).
96-290 RICH J. McGill et al. RICH Week in Ljubljana, (November 16-21 1996).
96-289 Run M. Danilov, R. Kagan, V. Pugatch, K. Riechmann, J. Rieling, V. Saveliev, S. Takach, M. Titov, U. Uwer Run Meeting, December 5, 1996.
96-288 Farm A. Gellrich et al A Test System for the HERA-B Online Trigger and Reconstruction Farm
96-287 Software H. Deckers, T. Lohse, R. Mankel, Ch. Stegmann Fit of the Interaction Time Shift in the HERA-B '96 Track Reconstruction.
96-286 Target M. Braeuer, K. Ehret, C. Hast, S. Issever, S. Spratte, V. Pugatch How do we steer the Hera-B-targets? A brief introduction into TaCoS
96-285 Outer Tracker G. Bohm, K. Berkhan, A. Donat, C. Padilla, M. Pohl, D. Pose, V. Suvorov, H. Wilczek Outer Tracker-Meeting, Zeuthen, 26/11/96
96-284 Inner Tracker G. Zech Signal propagation on MSGC anodes
96-283 Inner Tracker U. Werthenbach, G. Zech MSGC design with anodes split at the center of the chamber
96-282 Inner Tracker M. Enkelmann, G. Zech Simulation of MSGC efficiencies for different RC constants
96-281 General J. Spengler Minutes of the Technical Board-Meeting, 15/11/96
96-280 Software S. Nowak Hit numbers for different beam pipe configurations
96-279 Outer Tracker C. Stegmann, O. Steinkamp Glueing Tests
96-278 RICH J. McGill, R. Schwitters Lens-based Light Collector Design Characteristics
96-277 RICH M. Atiya, K. Lau, J. McGill, J. Rosen, R. Schwitters Focal Plane Design Proposal
96-276 Target S. Spratte Untersuchung zu den Eigenschaften eines internen Drahttargets fuer das HERA-B Experiment.(Diplomarbeit)
96-275 RICH P. Krizan, T. Zivko Performance Study of the RICH Photon Detector with two Granularities.
96-274 Target S. Issever Vorbereitende Untersuchungen fuer das HERA-B Experiment.(Diplomarbeit 3/96)
96-273 Software A. Spiridonov An Approach to Global Vertex Fitting
96-272 Software H. Albrecht, T. Oest, I. Siccama, A. Gellrich Mass Storage and Computing Requirements for HERA-B.
96-271 Talks W. Schmidt-Parzefall Future Experiments on CP Violation in B Decays
96-270 Muon A. Arefiev et al Tests of Tube Chambers for HERA-B Muon System
96-269 Inner Tracker T. Zeuner Performance of microstrip gas chambers with minimum ionizing particles using Helix 1.1 preamplifier
96-268 Inner Tracker T. Zeuner MSGC electrode deterioation by discharges produced by heavy ionizing particles
96-267 Software J. Ivarsson Reconstruction Chain for the Golden Decay
96-266 Farm U. Schwendicke, H. Leich, M. Medinnis, A. Koehler, P. Wegner, K. Sulanke, F. Sun, R. Dippel, A. Gellrich, I.C. Legrand A Programming Environment to Control Switching Networks based on STC104 Packet Routing Chip
96-265 RICH R. Schwitters HERA-B RICH Optics
96-264 RICH R. Schwitters, J. McGill Further Report on Telescope Design for RICH Light Collection
96-263 RICH R. Schwitters, J. McGill Design Study for M16 Light Collectors
96-262 RICH R. Schwitters Comment on Likelihood Functions
96-261 RICH R. Schwitters, J. McGill Comments on Light Collection with Lenses
96-260 RICH R. Schwitters HERA-B RICH Decision Memorandum
96-259 RICH R. Schwitters The HERA-B RICH Database, richdb
96-258 RICH R. Schwitters RICH Photons - Why 20?
96-257 Software S. Nowak The Hera-B-Monte-Carlo-Program for run 1996
96-256 DAQ J. Luedemann, D. Ressing, R. Wurth, J, Zweizig A SHARC DSP Cluster as Hera-B DAQ building block
96-255 DAQ J. Zweizig Data Acquisition in the Hera-B and LHC Era
96-254 Farm H. Albrecht, A. Gellrich Naming of Raw Data Tables in Arte
96-253 VDET T. Perschke, F. Klefenz, C. Baur VDET-Meeting, Heidelberg, 19/Sept/96
96-252 VDET K.T. Knoepfle, I. Abt, M. Eberle, E. Sexauer, U. Trunk VDET-Meeting, Heidelberg, 19/Sept/96
96-251 Farm R. Dippel, A. Gellrich, I.C. Legrand, H. Leich, F. Sun, P. Wegner PRC Status Report on the Processor Farm
96-250 Trigger H. Thurn Status Report of the Simulation Package for the Second Level Trigger of HERA-B
96-249 Trigger M. Medinnis Requirements of the Hera-B 2nd Level Trigger (Draft)
96-248 Trigger The NBI group Proposal for a DS-Link based SLT for HERA-B
96-247 Trigger M. Medinnis, D. Ressing Proposal for an all-SHARC SLT for Hera-B
96-246 Trigger F. Saadi-Luedemann Trigger for Radiative B Decays at the HERA-B experiment
96-245 Trigger J. Glaess, D. Ressing, A. Wurz Wire Memory for the FLT
96-244 Trigger D. Ressing First Level Trigger for HERA-B
96-243 Trigger F. Ratnikov, D. Ressing, F. Saadi-Luedemann Status of the Hera-B First Level Trigger
96-242 General T. Fuljahn Optimal placement of detector components for 1996 test run
96-241 Trigger T. Fuljahn MC predictions for the 1996 test run of Hera-B Pretrigger and Trigger
96-240 Trigger T. Fuljahn Der Trigger fuer den Hera-B-Testaufbau 1996
96-239 High-p_t V. Popov Pretrigger Logic for inner part of high-pt trigger
96-238 Farm H. Albrecht, A. Gellrich Conversion and Storage of Event Data in the Test Run 1996
96-237 Software H. Albrecht Coll.-M. 5/Oct/96, Software Analysis Tools
96-236 DAQ J. G. Zweizig Hera-b Data Aquisition Status 5/Oct/96
96-235 Farm A. Gellrich Status of the Farm 5/Oct/96
96-234 Trigger M. Medinnis SLT Status 5/Oct/96
96-233 Trigger D. Ressing FLT Summary 5/Oct/96
96-232 Muon R. Harr Muon System 5/Oct./96
96-231 ECAL S. Shuvalov Hera-B Calorimeter-96 Outline 5/Oct./96
96-230 TRD B. Dolgoshein, V. Saveliev Transition Radiation Detector 5/Oct./96
96-229 RICH P. Krizan RICH Status Report 5/Oct./96
96-228 Outer Tracker H. Kapitza Outer Tracker Status 4/Oct./96
96-227 High-p_t M. Danilov High-Pt Trigger Status Outline 4/Oct./96
96-226 Inner Tracker F. Eisele MSGC Prouction and Test Results, 4/Oct./96
96-225 Inner Tracker A.Hoelscher et al. The Microstrip Detector Readout System at Hera-B 4/Oct./96
96-224 VDET I. Abt Coll.-M. 4/Oct/96, VXD Plenary Report
96-223 Target K. Ehret Coll.-M. 4/Oct/96, Status and Results
96-222 Run C. Padilla Coll.-M. Oct/4/96, Run Status
96-221 General J. Spengler Coll.-M. Oct/4/96, Tech. Coordinator Report
96-220 General J. Spengler Coll.-M. Oct/2/96, Technical Board-session
96-219 High-p_t I. Tichomirov, V. Popov, V. Balagura, A. Schwartz, M. Danilov Collaboration-Meeting, Sept. 30th - Oct. 5th, Hamburg, High-p_t session
96-218 Software S. Erhan, H. Albrecht, J. Ivarsson, J. Thom, W. Schmidt-Parzefall, H. Schroeder Collaboration-Meeting, Sept. 30th - Oct. 5th, Hamburg, Software session, Part 4
96-217 Software A. Spiridonov, R. Mankel, Th.Oest, H. Albrecht, H. Thurn Collaboration-Meeting, Sept. 30th - Oct. 5th, Hamburg, Software session, Part 3
96-216 Software A. Gellrich, S. Nowak, J. Rieling, Ch.Stegmann, B. Fominykh Collaboration-Meeting, Sept. 30th - Oct. 5th, Hamburg, Software session, Part 2
96-215 Software A. Pose, J. Ivarsson, S. Shuvalov/I. Igonkina, P. Kreuzer Collaboration-Meeting, Sept. 30th - Oct. 5th, Hamburg, Software session, Part 1
96-214 Outer Tracker U. Schwanke, H. Wilczek, G. Bohm, Ch.Stegmann Collaboration-Meeting, Sept. 30th - Oct. 5th, 1996, Hamburg, Outer Tracker session, Part 3
96-213 Outer Tracker S. Suvarov, K. Berkhan, M. Beck, R. Loke, CH.Stegmann Collaboration-Meeting, Sept. 30th - Oct. 5th, 1996, Hamburg, Outer Tracker session, Part 2
96-212 Outer Tracker M. Walter, CH.Jiang, Y. Kiryushin, H. Wilczek Collaboration-Meeting, Sept. 30th - Oct. 5th, 1996, Hamburg, Outer Tracker session, Part 1
96-211 VDET R. Wunstorf, J. Rieling, M. Schmelling, K.T. Knoepfle, F. Klefenz, B. Schwingenheuer, E. Zimmer-Nixdorf, W. Schmidt-Parzefall Collaboration-Meeting, Sept. 30th - Oct. 5th 1996, Vertex Detector-session
96-210 Muon R. Harr, P. Karchin, R. Wurth, B. Fominykh Collaboration-Meeting, Sept. 30th - Oct. 5th 1996, MUON-session
96-209 ECAL D. Rusinov, S. Shuvalov, Y. Gilitsky, A. Golutvin, B. Giacobbe, M. Bruschi Collaboration-Meeting, Sept. 30th - Oct.5th 1996, Calorimeter-session
96-208 Inner Tracker A. Hoelscher, B. Glass, G. Zech, A. Lange S. Hausmann, T. Beckmann, M. Feuerstack, U. Straumann Collaboration-Meeting, Sept. 30th - Oct. 5th 1996, Inner Tracker-session
96-207 Inner Tracker T. Zeuner, C. Bresch, G. Zech, H.B. Dreis, F. Eisele, T. Hott, A. Maag Collaboration-Meeting, Sept. 30th - Oct. 5th 1996, Inner Tracker-session
96-206 Outer Tracker O. Steinkamp, M. Walter Collaboration-Meeting, Sept. 30th - Oct. 5th 1996, Outer Tracker-session
96-205 Muon B. Fominykh, S. Barsuk, Y. Zaitsev, I. Tichomirov Collaboration-Meeting, Sept. 30th - Oct. 5th 1996, MUON-session
96-204 Target C. Hast, S. Spratte, M. Braeuer, V. Pugatch, J. Noritzsch, S. Issever, K. Ehret Collaboration-Meeting, Sept. 30th - Oct. 5th 1996, Target-session
96-203 Trigger M. Damm, M. Medinnis Collaboration-Meeting, Sept. 30th - Oct. 5th 1996, SLT-session
96-202 RICH T. Zivko, R. Eckmann Collaboration-Meeting, Sept. 30th - Oct. 5th 1996, RICH-session
96-201 RICH R. Wurth, J. Pyrlik, D. Broemmelsiek Collaboration-Meeting, Sept. 30th - Oct. 5th 1996, RICH-session
96-200 Trigger F. Ratnikov, S. Xella, F. Saadi-Luedemann, S. Scharein, P. Kreuzer Collaboration-Meeting, Sept. 30th - Oct.5th 1996, SLT-session
96-199 Farm R. Dippel, S. Fang, A. Gellrich, I. Legrand, H. Leich, P. Wegner Collaboration-Meeting, Sept. 30th - Oct. 5th 1996, Farm-session
96-198 Trigger M. Bruschi FLT-session
96-197 RICH P. Krizan, M. Ispirian, J. Rosen, R. Eckmann, J. Pyrlik Collaboration-Meeting, Sept. 30th - Oct. 5th, 1996, Light guides-session
96-196 Trigger M. Kolander, T. Wolf, A. Schwarz Collaboration-Meeting, Sept. 30th - Oct. 5th, 1996, Hamburg, FLT-session
96-195 DAQ S. Hausmann, M. Bruschi, R. Wurth, D. Ressing, B. Rensch, J. Luedemann, J. Zweizig Collaboration-Meeting, Sept. 30th - Oct. 5th, 1996, Data Acquisition
96-194 Farm R. Dippel, A. Gellrich, I.C. Legrand, H. Leich, R. Kowallik, F. Sun, P. Wegner A Test System for the HERA-B L3/L4 Processor Farm
96-193 Run C. Padilla 1996 Run Status. (Sept. 10, 1996)
96-192 DAQ R. Wurth, M. Beck, R. Zimmermann Method's and Results of the TDC-Hit-Chip Tests at Heidelberg.
96-191 RICH I. Arino Incidence angles of the Cerenkov photons on a planar detector
96-190 RICH T. Oest A Study of a RICH Photon Detector Design.
96-189 Target K. Ehret, S. Spratte, V. Pugatch, M. Braeuer, S. Issever, C. Hast Target Subgroup Meeting, Aug. 29-30, 1996, MPI Heidelberg
96-188 Outer Tracker N. Tesch Outer Tracker Meeting, Hamburg August 7-8, 1996.
96-187 General J. Spengler Minutes of the Meeting of the Technical Board. August 23rd, 1996.
96-186 Target K. Ehret HERA-B Target: Status and Plans. (August 20, 1996).
96-185 VDET Anonymous Meeting of the Munich and Heidelberg HERA-B VDS Groups. MPI Munich, July 19, 1996.
96-184 RICH P. J. Weyers Testmessungen an einem Photondektor Prototyp fuer den RICH von HERA-B. (Thesis)
96-183 ECAL G. Avoni et al. The ECAL Pretrigger System.
96-182 ECAL G. Avoni et al. The ECAL Readout Board.
96-181 ECAL Anonymous Status Report on the Readout and Pretrigger Electronics of ECAL.
96-180 ECAL C. Avoni et al. Designing Criteria for the ECAL Readout.
96-179 High-p_t C. Lu, A. Schwartz Prototype Studies of a Highly Resistive Straw Tube Chamber with Pad Readout.
96-178 RICH M. Ye Maximum Drift Time of Electrons in the 8 x 8 mm^2 Square Drift Cell. (II)
96-177 General D. Ressing Beauty '96 Impressions.
96-176 General J. Spengler Minutes of the Meeting of the Technical Board. June 28th, 1996.
96-175 General J. Spengler Minutes of the Meeting of the Technical Board. Zeuthen June 15, 1996.
96-174 Talks J. Spengler An Experiment to Study CP Violationn in the B System Using an Internal Target at the HERA Proton Ring.
96-173 RICH M. Ye Change of the Maximum Drift Time of Electronics in the 8 x 8 mm^2 Square Drift Cell Due to the Mis-positioning of the Sense Wire.
96-172 Trigger M. Bruschi, Th. Fuljahn, F. Ratnikov, D. Ressing Pretrigger and FLT Parallel Session at the HERA-B Collaboration Meeting, Zeuthen June 10-15, 1996
96-171 Farm R. Dippel, A. Gellrich, I. Legrand, P. Wegner Joint daq/slt/FARM Parallel Session at the HERA-B Collaboration Meeting, Zeuthen June 10-15, 1996.
96-170 Trigger Dam/Erhan/Kreuzer/Medinnis/Thurn Joint daq/SLT/farm Parallel Session at the HERA-B Collaboration Meeting, Zeuthen June 10-15, 1996.
96-169 ECAL M. Bruschi Joint daq/slt/farm Parallel Session at the HERA-B Collaboration Meeting, Zeuthen June 10-15, 1996.
96-168 DAQ Beck/Ehret/Erhan/Hausmann/Hast/Loke/Luedemann/Ressing/Saveliev/Zweizig Joint DAQ/slt/farm Parallel Session at the HERA-B Collaboration Meeting, Zeuthen June 10-15, 1996.
96-167 High-p_t I. Belyaev, A. Schwartz High-Pt Parallel Session at the HERA-B Collaboration Meeting, Zeuthen June 10-15, 1996.
96-166 RICH P. Karchin, Ch. Oeser, T. Oest, M. Ye, T. Zivko RICH Parallel Session 2 at the HERA-B Collaboration Meeting, Zeuthen June 10-15, 1996.
96-165 RICH A. Bulla, S.Korpar, P. Krizan, J. Pyrlik RICH Parallel Session 1 at the HERA-B Collaboration Meeting, Zeuthen June 10-15, 1996.
96-164 Muon S.Barsuk, R.Harr, Yu.Zaitsev Muon Parallel Session at the HERA-B Collaboration Meeting, Zeuthen June 10-15, 1996.
96-163 Target Braeuer/Ehret/Hast/Lohse/Pugatch/Spratte Target Parallel Session at the HERA-B Collaboration Meeting, Zeuthen June 10-15, 1996.
96-162 Software Barsuk/Borgmeier/Erhan/Fominykh/Gellrich/Igonkina/Kreuzer/Leuthold/Liu/Mankel/Moller/Oest/Ratnikov/Shuvalov/Titov/Zivko Software Parallel Session at the HERA-B Collaboration Meeting, Zeuthen June 10-15, 1996.
96-161 Outer Tracker Berkhan/Kapitza/Kiryushin/Loke/Steinkamp/Walter/Tesch Outer Tracker Parallel Session at the HERA-B Collaboration Meeting, Zeuthen June 10-15, 1996.
96-160 Inner Tracker Fallot-Burkhard/Hausmann/Hott/Lange/Robmann/Schmidt/Visbeck Inner Tracker Parallel Session at the HERA-B Collaboration Meeting, Zeuthen June 10-15, 1996
96-159 General C. Padilla 1996 Run/Plan Organization.
96-158 Software N. Tesch Detector Alignment 1996
96-157 Software C. Stegmann Reconstruction in 96. June 1996
96-156 General J. Spengler 1997 Run Preparation.
96-155 Software S. Nowak GEANT for RUN 96.
96-154 Software H. Albrecht Software Overview. June 1996
96-153 Farm A. Gellrich The Status of the Farm Project.
96-152 Trigger D. Ressing First Level Trigger. June 1996
96-151 Trigger M. Medinnis Second Level Trigger. June 1996
96-150 DAQ D. Ressing DAQ Summary. June 1996
96-149 RICH J. Pyrlik Status of the RICH. June 1996
96-148 TRD V. Saveliev Transition Radiation Detector.
96-147 ECAL M. Bruschi ECAL Status Report. June 1996.
96-146 Muon Yu. Zaitsev Status of the Muon System. June 1996.
96-145 High-p_t A. Schwartz Progress on High-p_t Pretrigger.
96-144 Target V. Pugatch HERA Status. Target Set Up.
96-143 VDET W. Fallot-Burghardt Frontend Chip Development for SVD and Inner Tracker.
96-142 VDET K. T. Knoepfle Vertex Detector System. - Status and Outlook -
96-141 Magnet S. Spiridonov Magnet Measurement Analysis.
96-140 Outer Tracker M. Walter Outer Tracker. Status June 1996.
96-139 Inner Tracker B. Schmidt Inner Tracker - News and Status June '96.
96-138 General J. Spengler Technical Coordinator Report.
96-137 Muon M. Titov Studies of Background for Muon Identification at the HERA-B Experiment.
96-136 RICH A. Bulla Results of the Ageing Test with a CF4-Isobutane-TMAE filled Wire Chamber.
96-135 RICH M. Ye Maximum Drift Time of Electrons in the 8 x 8 mm^2 Square Drift Cell.
96-134 DAQ J. Luedemann Status of the HERA-B SHARC Cluster Board.
96-133 General J. Spengler Status and Schedule of HERA-B. (May 7, 1996).
96-132 Outer Tracker O. Fedin et al. An X-Ray Test Station for ATLAS TRT Calibration. Technical Proposal.
96-131 Outer Tracker O. Fedin et al. The First Results of a TRT Cell Prototype Alignment Test with 36 KeV X-Ray Beam.
96-130 Outer Tracker O. L. Fedin, A. I. Smirnov On a Possibility to use a narrow X-ray beam for Straw Proportional Tubes Alignment.
96-129 Outer Tracker B. Bevensee et al. An Amplifier-Shaper-Discriminator with Baseline Restoration for the ATLAS Transition Radiation Tracker.
96-128 Outer Tracker R. Loke Status of the '96 DAQ.
96-127 Outer Tracker R. Wurth TDC Readout Chain. Outer Tracker Design. Status.
96-126 Outer Tracker R. Zimmermann Results of TDC Chip Test.
96-125 Outer Tracker K. Berkhan ASD-8 Chiptest.
96-124 Outer Tracker N. Tesch Alignment Systems for the Outer Tracker.
96-123 Outer Tracker U. Schwanke Quality Checks for 25 micron Gold Plated Tungsten Wires from California Fine Wire and LUMA.
96-122 Outer Tracker M. Walter Status of Production Templates.
96-121 Outer Tracker H. Luedecke Module-Distribution for MC9 - superlayer.
96-120 Outer Tracker S. Suvorov Measurement of DC Parameters with a Triggered Source.
96-119 Outer Tracker Anonymous Outer Tracker Meeting. April 22-23, 1996. Agenda, Short Contributions, Homework List.
96-118 Physics J. Rosner Current Problems in Beauty Physics
96-117 RICH M. Ye, T. Hamacher Simulation of Drift Cells for the Photon Detector of RICH.
96-116 DAQ R. Zimmermann Results of TDC Chip Test. Overview.
96-115 DAQ M. Beck Outer Tracker Readout Electronic.
96-114 RICH P. Krizan Cleaning Systems for the C_4F_10 Gas - a Survey of Systems under Design.
96-113 Trigger H. Thurn The Second Level Trigger SLT: Refit of FLT Tracks. Status Report.
96-112 Trigger F. Ratnikov First Level Trigger. The Muon Story.
96-111 RICH M. Ispirian Requirements for Rich Single Mirror Quality.
96-110 Outer Tracker M.Walter Proposal for a new Design of the Outer Tracker Superlayer Structure
96-109 Physics C. H. Shepherd-Themistocleous Pi Tag for B Flavour
96-108 General J. Spengler Minutes of the Meeting of the Technical Board, March 2nd 1996
96-107 Trigger D. Ressing, F. Saadi, J. Glaess, F. Radnikov, M. Danilov, A. Schwartz Parallel Meet. Pretrigger/FLT
96-106 DAQ J. Zweizig Parallel Meet. FARM/DAQ/SLT, List of ToDos & Summary
96-105 DAQ M. Medinnis, J. Zweizig, D. Ressing, H. Thurn Parallel Meet. FARM/DAQ/SLT, Toolbox Issues
96-104 DAQ M. Beck / R. Zimmermann, R. Harr Parallel Meet. FARM/DAQ/SLT, Requirements of the FED Groups
96-103 DAQ M. Medinnis, J. Zweizig, A. Gellrich, J. Luedemann, G. Leffers Parallel Meet. FARM,DAQ/SLT, Applications
96-102 Trigger M. Medinnis, P. Kreuzer, H. Thurn, S. Erhan Parallel Meet. FARM/DAQ/SLT, SLT Algorithm
96-101 Farm A. Gellrich Parallel Meet. FARM/DAQ/SLT, Status of the Farm Hardware
96-100 DAQ D. Ressing, C. Polenz, J. Luedemann, R. Wurth, J.R. Hansen Parallel Meet. FARM/DAQ/SLT, Hardware
96-099 General J. Spengler Installation Schedule, Status March 1,1996
96-098 DAQ J. Zweizig Hera-B DAQ Status
96-097 Software H. Albrecht Software for Hera-B
96-096 Trigger M. Medinnis SLT Status 2-March-1996
96-095 Trigger F. Saadi First Level Trigger Status Report 30-2-96
96-094 High-p_t A. Schwartz et al. Status of High-pt Work at Princeton Feb.1996
96-093 High-p_t M. Danilov High-pt Trigger, Work at ITEP
96-092 Muon R. Harr Muon Chamber Electronics
96-091 Muon Y. Zaitsev Status of the Muon System 1-3-96
96-090 ECAL A. Golutvin Status of the Electromagnetic Calorimeter 1-3-96
96-089 TRD V. Sosnovtsev TRD Hera-B, Status 1-3-1996
96-088 RICH T. Hamacher RICH Status 1-3-1996
96-087 Magnet R. Eckmann The Hera-B Magnets
96-086 Muon M. Atiya Front End Driver
96-085 Muon P. Maas ASD8 Status 28-02-96
96-084 RICH P. Krizan Remarks on the Detector Design
96-083 RICH S. Korpar PM-Tests
96-082 RICH P. Krizan Background in the Test RICH and Projections to the Full RICH
96-081 RICH S. Korpar C_sI - Status
96-080 RICH P. Krizan High Rate Tests of the TMAE Chamber
96-079 RICH M. Ye Simulation of Drift Cells for the Photon Detector of RICH.
96-078 RICH P. Krizan Analysis of Oct.95 Aging Data
96-077 RICH J. Pyrlik TMAE Chamber Aging Results
96-076 RICH T. Zivko Status of the RICH Analysis Software
96-075 RICH P. Krizan Simulation
96-074 Inner Tracker M. Werthenbach Z - Bonding - Machine
96-073 Inner Tracker G.Zech Efforts to Accelerate Coating and Lithography
96-072 Inner Tracker S.Hausmann PSI-Test
96-071 Inner Tracker T.Beckmann PSI-Testboard
96-070 Inner Tracker S.Visbeck The 10x10 cm^2 diamond chamber
96-069 Inner Tracker T. Hott Estimation of the Acc. Charge, Concerning Hera-B Inner Tracker
96-068 Inner Tracker M. Feuerstack Helix32 First Results & Status
96-067 High-p_t V. Popov et al. Beam Test Gas Pixel Chamber Prototype
96-066 High-p_t A.Schwartz, C.Lu, C.Leonidopoulos Highp_t Outer Region Pad Chambers: Recent Results from Princeton
96-065 High-p_t I.Tikhomirov Construction of Gas Pixel Chambers
96-064 Outer Tracker M. Walter OTR Mass Production Topics.
96-063 Outer Tracker C. Stegmann Status of Prototype Chamber Production.
96-062 Outer Tracker M. Walter Proposal for a new Design of the OTR Superlayer Structure.
96-061 Outer Tracker R. Wurth TDC Fed Outer Tracker Design. Status.
96-060 Outer Tracker K. Berkhan Status of ASD-8 and HV Board Development.
96-059 Outer Tracker I. Kiriouchine Dubna Status.
96-058 Outer Tracker J. Metselaer Status NIKHEF.
96-057 Outer Tracker C. Stegmann Stability Criteria.
96-056 Outer Tracker A. Donat Comparison of Several Struttings for Honeycomb Drift Chamber.
96-055 Outer Tracker U. Schwanke On the Mechanical Properties of Honeycomb Drift Chambers.
96-054 Outer Tracker H. J. Wilczek Electrical Properties of a 2 m Pokalon-C double layer Chamber.
96-053 Outer Tracker C. Stegmann Remarks on HDC - Resolution and Efficiency.
96-052 Outer Tracker H. Deckers Report on Testbeam Measurements with 5/10 mm HDC.
96-051 ECAL S. Chouvalov Preparationfor RUN-96 at DESY and Beam Test at CERN.
96-050 ECAL E. Santovetti Status of Integrator and ADC for ECAL Readout.
96-049 ECAL M. Bruschi Status of the ECAL Electronics.
96-048 ECAL V. Akimov Measurements of the Linearity and Quantum Efficiency of Russian Produced Photomultipliers.
96-047 ECAL O. Igonkina Shower Parameterization for ECAL mini Monte Carlo.
96-046 Inner Tracker G. Zech Inner Tracking - Present Status.
96-045 VDET K.T. Knoepfle Vertex Detector System. - Status. Feb. 26 - March 2, 1996
96-044 Outer Tracker H. Kapitza Outer Tracker Status. Feb. 26 - Mar 2, 1996
96-043 VDET I. Abt Prototypemodules 96.
96-042 Inner Tracker M. Feuerstack et al. SVD and MSGC Frontends.
96-041 VDET T. Odegaard FELIX a Frontend for Silicon Strip Detectors.
96-040 General W. Schmidt-Parzefall Report of the Physics Coordinator. Topics of Concern about Detector Performance.
96-039 Target K. Ehret HERA-B Target.
96-038 beam-pipe E. Zimmer-Nixdorf The Pipe is ready, the Window is welded to the Beam-Pipe.
96-037 Trigger H. Thurn Parallel Meet. FARM/DAQ/SLT,A Graphical User Interface for the SLT Simulation or the Easy Use of Tcl/Tk.
96-036 Trigger H. Thurn Parallel Meet. FARM/DAQ/SLT, The Second Level Trigger SLT: Refit of FLT Tracks. - Status Report -.
96-035 Target M. Braeuer Target - Survey: The Problem: Mount 8 Targets in 4 independend Modules.
96-034 Target S. Spratte Status der Datenanalyse des Targettest Experiments '95.
96-033 Target K. Ehret Target: Rates and Efficiencies.
96-032 Target Anonymous Target Subgroup Meeting Feb. 26, 1996. Collection of some Transparencies.
96-031 Outer Tracker C. C. Jiang Parallel Meet., The preparation for wire tension of HERA-B OTS. Experience of wire tension of BES main drift chamber.
96-030 Outer Tracker A. Donat et al. Assembling of Modules within Superlayers.
96-029 Software T. Oest Status of our SGI.
96-028 Physics R. Mizyuk, I. Belyaev Possibility of Partial Rec. of B0 -
96-027 VDET K. Riechmann Capacitance of Gold Traces n-side.
96-026 VDET I. Abt Path Installation, March 96.
96-025 VDET H. Fox Module Test-stand and Laser Measurements.
96-024 VDET C. Bauer Status of Electronics.
96-023 VDET T. Perschke Laser Alignment Tests.
96-022 VDET K.T. Knoepfle Cabling - Overview.
96-021 VDET B. Schwingenheuer Cooling for '96.
96-020 VDET B. Schwingenheuer RF Shielding.
96-019 VDET K.T. Knoepfle Setup for 1996 Run.
96-018 Outer Tracker K. Berkhan Status of ASD-8 Board Development.
96-017 Outer Tracker H. Kapitza Outer Tracker Safety Requirements.
96-016 Outer Tracker M. Walter OTR - Z - Space and Material Summary.
96-015 Outer Tracker U. Schwanke On the Mechanical Properties of Honeycomb Drift Chambers.
96-014 Outer Tracker A. Donat, H. Kolanoski On the Mechanical Stability of Honeycomb Drift Chamber Modules.
96-013 Outer Tracker J. Metselaar OTR Meeting, Jan. 30, 1996. Honeycomb chambers: Folding, Glueing Device, Tempering, Stability.
96-012 Outer Tracker E. Michel, H. Kapitza Mechanical and Electrical Properties of a 4.5 m Module with 10 mm Cells.
96-011 Outer Tracker C. Stegmann Stability of 2m Chamber.
96-010 Outer Tracker H. Wilczek, K. Berkhan Electrical Properties of a 2 m long Chamber with 5 mm Cells.
96-009 Outer Tracker H. Deckers Status of Test Measurements with 10/5 mm HDC.
96-008 Software J. Kurzhoefer Computing at H1. Some Considerations for HERA-B
96-007 ECAL S. Shuvalov Electromagnetic Calorimeter - test results.
96-006 General J. Spengler Minutes of the Meeting of the Technical Board. January 26, 1996.
96-005 General B. Schmidt Status of HERA-B. PRC Meeting. Open Session. 16.1.1996.
96-004 VDET K. T. Knoepfle Proposed 1996 RF Shielding in VDS Vessel.
96-003 Software C. Borgmeier et al. Proposal for a C/C++ Interface for the ARTE Data Tables.
96-002 VDET D. Loukas et al. Development of High Resolution Silicon Strip Detectors for Experiments at High Luminosity at LHC.
96-001 High-p_t A. Schwartz, U. Varadarajan A Monte Carlo Study of a High-PT Pretrigger for HERA-B.
95-246 Tracking J. Metselaar OTR. First Calculations, NIKHEF Mass Production, Cell Geometry Definition.
95-245 Tracking A. Donat Prototype Production Tool.
95-244 Tracking Anonymous OTR HV Scheme.
95-243 Tracking H. Kolanoski Status of the ASD-8 Board Development.
95-242 Tracking K. Berkhan ASD-8 Board.
95-241 Tracking K. Berkhan Electrical Properties of the 2 m Pokalon-C Chamber (double layer).
95-240 Tracking C. Stegmann Status of Test Measurements with 10/5 mm HDC.
95-239 Software R. Mankel Application of the Kalman Filter Technique in the HERA-B Track Reconstruction.
95-238 RICH W. Schmidt-Parzefall Report on some critical Issues of the Austin Meeting (31 Oct. - 3 Nov. 1995)
95-237 General J. Spengler Minutes of the Meeting of the Technical Board.
95-236 Tracking R. Wurth Summary of TDC/TDC Board Status.
95-235 Tracking S. Issever ASD-8 Test Results. S. Issever's Test Setup with Upenn Testboard.
95-234 Tracking Yu. Kiryushin Test Results from Dubna ASD-8
95-233 Tracking H. Kapitza ASD-8 Properties. Question List.
95-232 Tracking V. Lysiakov The Development of the Glueing Technology for the Modules Massproduction.
95-231 Tracking A. Donat Production Tools.
95-230 Tracking J. Metselaar Honeycomb chambers: Foil Folding and Chorus Production.
95-229 Tracking M. Walter Summary of Module Assembling.
95-228 Tracking H. Kapitza Test Module and Prototype Design.
95-227 Tracking C. Stegmann Summary of Test Chamber Results and Activities to solve Open Questions.
95-226 Software J. Ivarsson First Analysis Experience with HERA-B Simulation and Reconstruction Tools.
95-225 RICH Anonymous HERA-B RICH Design Review. Austin Meeting (31.10.95).
95-224 beam-pipe E. Zimmer-Nixdorf Proton Beam Pipe: - Protection Device.
95-223 Physics I. Belyaev Investigation of B Tagging with B** Decays at HERA-B.
95-222 Physics F. Saadi Trigger for Radiative B Decays at HERA-B.
95-221 Physics I. Belyaev Study of B -> chi c1 K0s.
95-220 Tracking S. Issever et al. Test des ASD-8B Chips - Ausgang.
95-219 General A. S. Schwarz Conclusion. Remarks
95-218 General R. Wurth Crates for '96 Run will be ordered by DESY.
95-217 Slow Control C. Hast Temperature Measurements.
95-216 General J. Spengler Infrastructure, Counting Room.
95-215 General H. Kapitza Safety at HERA-B.
95-214 General J. Spengler Cables, Gas Infrastructure.
95-213 VDET K.T. Knoepfle Vertex Detector System. - 1996 Run 'Readiness'.
95-212 Target C. Hast Target Tests.
95-211 Slow Control C. Hast Magnet Slow Control.
95-210 Target C. Hast Target Readyness '96.
95-209 Trigger D. Reßing No Title.
95-208 Software H. Albrecht Software for HERA-B.
95-207 High-p_t A. Schwartz High-PT Agenda.
95-206 Trigger A. Schwartz High-pt Pretrigger.
95-205 Trigger M. Medinnis Second Level Trigger.
95-204 Trigger F. Ratnikov First Level Trigger. Summary and Status.
95-203 Muon Yu. Zaitsev Status of the Muon System.
95-202 Magnet K. Sinram et al. Status Report. HERA-B - Magnet + Compensation Coil System.
95-201 RICH P. Krizan RICH Status.
95-200 TRD B. Dolgoshein TRD Status Report. Oct. 1995
95-199 Tracking B. Schmidt The Inner Tracker Chambers.
95-198 ECAL M. Bruschi ECAL - Status Report.
95-197 VDET K.T. Knoepfle Vertex Detector System - Status.
95-196 Tracking M. Walter Outer Tracker Status.
95-195 VDET T. Beckmann et al. SVD and MSGC Frontends.
95-194 beam-pipe J. Spengler Al Beam-Pipe.
95-193 Trigger H. Thurn The Second Level Trigger SLT: Refit of FLT Tracks (Status Report).
95-192 Farm R. Dippel DSP Server Concept.
95-191 Trigger M. Medinnis HERA-B SLT Requirements (Draft).
95-190 Trigger J.D. Hansen Second Level Vertex Code.
95-189 Trigger P. Kreuzer The FLT/SLT Interface in the GEANT Simulation.
95-188 Farm A. Gellrich Status of the HERA-B Processor Farm
95-187 Tracking R. Wurth TDC FED. Outer Tracker Design. Status.
95-186 Tracking Sack Signal Shape of the MSGC.
95-185 DAQ D. Reßing Sharc Board Performance
95-184 DAQ D. Reßing Fast Control System.
95-183 Tracking B. Schmidt No Title.
95-182 VDET M. Feuerstack et al. Status Report of the Front End Driver Board for the Silicon Vertex and the Inner Tracker Subdetector.
95-181 DAQ H. Leich C44-Board: Status Report.
95-180 Slow Control K. Ehret HERA-B Control System.
95-179 Tracking A. Lange Readout Processing for MSGC's at HERA-B.
95-178 Tracking G. Zech Surface Coating for Inner Tracker MSGCs.
95-177 Tracking T. Hott MSGC - Performance.
95-176 RICH P. Krizan "Work to be done" onto "List of Institutions in RICH".
95-175 RICH T. Hamacher TMAE - Gas System.
95-174 RICH J. Pyrlik RICH in Houston.
95-173 RICH C. Oehser First Glance on Reflectivity.
95-172 RICH C. Oehser First Ageing test.
95-171 RICH S. Korpar High Rate + Ageing Tests. CsI, TMAE.
95-170 RICH P. Krizan Comparison of Preamplifiers.
95-169 RICH P. J. Weyers Status of the Analysis of the Nov. '94 TMAE: Test Beam.
95-168 General J. Spengler Installation Schedule. Status.
95-167 High-p_t M. Danilov Some Geometry Optimization.
95-166 Physics H. Schroeder Possible Topics for this Workshop.
95-165 Software A. Spiridonov Parametrization of the Magnetic Field for Hera-B.
95-164 Software R. Mankel Track Reconstruction in the Magnet Area.
95-163 Software H. Albrecht HERA-B Software. Overview, problems, progress.
95-162 Muon Yu. Zaitsev Status of the Muon System.
95-161 Muon R. Harr Schedule.
95-160 Trigger T. Wenk Short Status Report of the Muon Pretrigger Electronics.
95-159 Trigger U. Marconi Pretrigger Simulations.
95-158 Tracking Yu. Kiryushin Roma HERA-B. Status of OT at Dubna.
95-157 Tracking H. Kolanoski Status of the ASD-8 Board Development.
95-156 Tracking Loke, B. First Results of Sept. 95 Test Run.
95-155 Tracking K. Berkhan Electrical Properties of Outer Tracker Chambers.
95-154 Tracking V. Suvorov Ageing Test Results.
95-153 Tracking M. Walter Production Tools and Module Arrangement.
95-152 Tracking H. Kapitza Tracker z - Positions.
95-151 RICH C. Oehser Reflectivity of the Walls of the TMAE-Chamber and their Influence on the Efficiancy of the Chamber.
95-150 RICH Anonymus Austin RICH Design Review.
95-149 VDET K. Riechmann et al. Pion and Proton Induced Radiation Damage to Silicon Detectors.
95-148 Muon B. Balagura Gas Pixel Chambers.
95-147 Farm A. Gellrich et al. The Processor Farm on Online Triggering and full event Reconstruction of the HERA-B Experiment at HERA.
95-146 General B. Parker and J. Spengler Minutes of the HERA-B HERA Meeting. Sept. 29th, 1995.
95-145 Physics H. Schroeder Physics with HERA-B. Workshop95, DESY 26/09/95.
95-144 Trigger M. Medinnis HERA-B Triggering
95-143 Magnet R. Eckmann Status Magnet.
95-142 VDET Knoepfle, K.T. et al. Cooling Studies for the Silicon Detector System.
95-141 Talks M. Walter HERA-B. Status and Plans. HERA - Workshop 1995.
95-140 Tracking M. Walter et al. Minutes of the Outer Tracker Construction Meeting at DESY - Zeuthen, Sept. 6-7, 1995 .
95-139 Trigger H. Thurn The Second Level Trigger SLT: Refit of FLT Track. Status Report.
95-138 General J. Spengler Minutes of the Meeting of the Technical Board (Sept. 8th, 1995).
95-137 Talks M. Medinnis HERA-B Status Report. PRC Meeting. Open Session.
95-136 Target K. Ehret and C. Hast Status of Target Test Measurements.
95-135 VDET Knoepfle Cooling Studies for the Silicon Detector System.
95-134 Electronics H.- U. Kirst et al. Test Results of a Multi-Layer Board Based on the ASD-8B Chip.
95-133 VDET I. Abt et al. Second Irradiation Test of a 1.2 x 1.2 cm^2 Prototype Silicon Detector with a Special Guard Ring Structure.
95-132 RICH M.Staric, P. Krizan Cerenkov Angle Reconstruction in the HERA-B Rich.
95-131 RICH P. Krizan, M. Staric Optical Error of the HERA-B RICH.
95-130 General A. S. Schwarz HERA-B Status Report. August 1995.
95-129 General J. Spengler Minutes of the Meeting of the Technical Board (August 4th, 1995).
95-128 Software R. Mankel Prism - the HERA-B Event Display Version 4.03.
95-127 Slow Control Ehret et al. Collection of Slow Control Requirements for HERA-B Subdetectors. Transparencies from Meeting July 6,1995.
95-126 DAQ D. Reßing Control System Architecture at HERA-B.
95-125 Software S. Barsuk/F. Khasanov Geant-based Approach to the Dectectors Arrangement for RUN '96.
95-124 General I. Abt Subjects to analyse.
95-123 DAQ K. Ehret HERA-B. DAQ for the 96 Run.
95-122 ECAL S. Shuvalov Electromagnetic Calorimeter. 96 Run Plan.
95-121 Tracking H. Kapitza Outer Tracker Modules for the '96 Test Run.
95-120 VDET M. Feuerstack HERA-B ' 96 Run Meeting.
95-119 VDET I. Abt VDS 96.
95-118 General J. Spengler Layout 95/96.
95-117 General K. Ehret HERA-B 96 Run - Meeting.
95-116 General A. S. Schwarz What is needed for the 1996 HERA-B run.
95-115 General J. Spengler Minutes of the Meeting of the Technical Board (July 7th, 1995).
95-114 General J. Spengler Protokoll der HERA-B Maschine. Koordinationsbesprechung. 23.06.95.
95-113 TRD V. Saveliev HERA-B. Transition Radiation Detector.
95-112 General H. Schröder HERA - Workshop: "Future Physics at HERA".
95-111 Physics F. Saadi B Factories for CP Measurement.
95-110 Muon Yu. Zaitsev Status of the Muon System.
95-109 ECAL S. Shuvalov Electromagnetic Calorimeter for HERA-B. Status Report.
95-108 Muon S. Barsuk/Yu. Zaitsev Monte Carlo Studies of Muon Chambers Arrangement Optimization for run 1996.
95-107 VDET M. Rietz Signals of Irradiated Detectors.
95-106 VDET I. Abt Carrier Hybrid.
95-105 VDET C. Coca Irradiations Facilities at IAP Bucharest.
95-104 VDET C. Bauer Preliminary Results of Irradiation Made at MPI Heidelberg.
95-103 VDET K. Riechmann Irradiation Test of a HERA-B Prototype Teststructure.
95-102 VDET P. Widmann An Optical Multi-point Alignment System for Tracking Detectors.
95-101 VDET W. Fallot-Burghardt/ A. Hölscher. HELIX - A Silicon Strip/MSGC Readout Amplifier.
95-100 VDET C. Bauer APC Readout Chip.
95-099 VDET B. Schwingenheuer Si - Detector Cooling Studies.
95-098 Physics J. Ivarsson/T. Akesson Beauty Production at the HERA-B Experiment.
95-097 General J. Spengler Minutes of the Meeting of the Technical Board (May 30th, 1995).
95-096 Tracking V. Myalitsin Measurement and Simulation of MSGC Signals.
95-095 Tracking U. Werthenbach et al. Probleme bei der Verwendung von alkalihaltigen Gläsern als Substratmaterial.
95-094 Tracking A. H. Walenta FRONT End for Gas Microstrip Detector.
95-093 Tracking T. Akesson HERA-B (TDC for) Honey comb chambers.
95-092 Tracking J. Boelsems/ A. Hölscher Status Report of the ASD-8 Tests at Heidelberg.
95-091 Tracking H. Deckers First Results of 10(& 5) mm HCD Tests at Testbeam 24.
95-090 Tracking K. Bergkhan Outer Tracker Test Chamber Studies.
95-089 Tracking M. Walter Standard and Nonstandard Modules.
95-088 Tracking P. Widmann An Optical Multi-point Alignment System for Tracking Detectors.
95-087 Tracking H. Kapitza Some Outer Tracker Design Issues.
95-086 Tracking B. Schmidt/ F. Eisele MSGC Mechanics, Positions, Support.
95-085 Tracking T. Hott Test of MSGC Performance .
95-084 RICH P. Krizan RIC Picture Analysis.
95-083 RICH R. Harr ASD - 8 SPECS.
95-082 RICH M. Staric Design of the Mirror and of the Photon Detector.
95-081 RICH T. Hamacher Mirror Quality Measurement.
95-080 RICH J. Pyrlik Houston Ideas for the RICH Photon TMAE Detector.
95-079 RICH P. J. Weyers TMAE - Chamber.
95-078 RICH P. Krizan TMAE AGEING - SLAC Experience.
95-077 RICH T. Hamacher Aging Test.
95-076 Trigger F. Saadi Triggering Radiative B Decays at HERA-B .
95-075 Trigger J. R. Hansen Requirements for a HERA-B Farm Based Second Level Trigger. A first Attempt.
95-074 Trigger M. Kolander No Title: FLT - Parallel-Meeting.
95-073 Trigger A. Snijko FLT Tracking in Muon System.
95-072 VDET C. Coca Irradiations Facilities at IAP Bucharest.
95-071 Tracking H. Kapitza Alignment of the Tracking System.
95-070 Trigger H. Thurn The Second Level Trigger SLT: Refit of FLT Tracks.
95-069 Software R. Mankel Pattern Recognition and Track Reconstruction. Status Report.
95-068 Tracking J. Rieling Tracking in the Silicon: 1st Results of a PR Algorithm for the SiVD.
95-067 RICH P. Krizan RICH Software - Status.
95-066 ECAL S. Shuvalov ECAL Software (Status and Plans).
95-065 Software H. Albrecht ARTE. (Analysis and Reconstruction Tool) .
95-064 Farm I. C. Legrand A Framework to Simulate and Optimize Large Distributed Data Processing Systems.
95-063 Software M. Ernst Central Computing and Storage Services at DESY.
95-062 DAQ J. Zweizig Responsibilities.
95-061 DAQ K. Ehret DAQ for the 96 Run.
95-060 Software J. Zweizig HERA-B Online Software Summary.
95-059 Trigger R. Wurth Status of Sharc Board Development.
95-058 Farm A. Gellrich Status of the HERA-B Processor Farm.
95-057 Slow Control M. Feuerstack What is CAN?
95-056 Trigger D. Reßing Fast Control System for HERA-B.
95-055 Tracking R. Wurth TDC FED. Outer Tracker Design.
95-054 Electronics R. Harr Digital FE Electronics.
95-053 Electronics M. Feuerstack The Front End Driver for analogue data.
95-052 Farm I. C. Legrand Event Building and Farm Simulation.
95-051 DAQ D. Reßing DAQ Architecture & Protocols at HERA-B.
95-050 General A. S. Schwarz Towards the 1996 Run. Part II.
95-049 General W. Hofmann Towards the 1996 Run. Part I.
95-048 General J. Spengler 3D - CAD for HERA-B. Installation Schedule.
95-047 Software P. J. Weyers Information Transfer inside HERA-B.
95-046 Slow Control R. Lauhakangas Control Systems.
95-045 Software H. Albrecht Software Overview.
95-044 DAQ J. Zweizig HERA-B. DAQ Status.
95-043 Trigger M. Medinnis SLT Status.
95-042 Trigger D. Reßing First Level Trigger. Summary & Status.
95-041 Muon Yu. Zaitsev Status of the MUON System.
95-040 ECAL A. Golutvin Electromagnetic Calorimeter for HERA-B. Status Report.
95-039 TRD V. Sosnovtsev TRD HERA-B. Status.
95-038 RICH T. Hamacher Status of the RICH.
95-037 High-p_t M. Danilov/A. Schwartz High-p_t Trigger.
95-036 Tracking M. Walter Outer Tracker Status.
95-035 Tracking B. Schmidt Status: Inner Tracker.
95-034 VDET J. Ludwig Gallium Arsenide for Vertex Detector System. HERA-B.
95-033 VDET W. Braunschweig/J. Ludwig Ga As in HERA-B?
95-032 VDET K. T. Knöpfle Vertex Detector System. - Status -.
95-031 Physics S. Nowak Interaction Points Occupancies Radiation Thickness.
95-030 Target C. Hast Target Setups.
95-029 beam-pipe E. Zimmer-Nixdorf HERA-B Beam-Pipes.
95-028 Magnet R. Eckmann STATUS Report: MAGNET.
95-027 General A. S. Schwarz Introductory Remarks. (HERA-B Meeting May 30th, 1995 at DESY - Hamburg.
95-026 Trigger D. Reßing Common - DAQ Architecture for HERA-B. (Zeuthen, April 27, 1995)
95-025 Trigger R. Wurth Status of Sharc Board Development. (Zeuthen, April 27, 1995)
95-024 Trigger P. Wegner C40 Software Development and Host Server. (Zeuthen, April 27, 1995)
95-023 Trigger P. Kreuzer HB - GEANT Integration. (Zeuthen, April 27, 1995)
95-022 Trigger I. Legrand SLT Algoritm. (Zeuthen, April 27, 1995)
95-021 Trigger J. D. Hansen Silicon Algoritm: Progress and bench Marks. (Zeuthen, April 27, 1995)
95-020 Trigger H. Thurn The L2 Trigger Simulation: Refit of FLT Tracks as an Example. (Zeuthen, April 27, 1995)
95-019 Trigger M. Medinnis L2SIMU Overview. (Zeuthen, April 26, 1995)
95-018 Tracking H. Kroha/P. Widmann An Optical Multi-point Alignment System for Tracking Detectors.
95-017 General J. Spengler Minutes of the Meeting of the Technical Board, May 5th, 1995.
95-016 Software H. Albrecht HERA-B Software.
95-015 General J. Spengler Protokoll der HERA-B Maschine. Koordinationsbesprechung. 27.03.95.
95-014 General J. Spengler HERA-B Schedules.
95-013 Software T. Lohse Vertex Reconstruction and Fitting.
95-012 Tracking H. Kapitza Outer Tracker Resolution Studies.
95-011 Tracking M. Walter Outer Tracker Status.
95-010 General J. Spengler Status of HERA-B.
95-009 beam-pipe E. Zimmer-Nixdorf HERA-B Beam-Pipe.
95-008 General W. Hofmann Status of HERA-B. February 1995.
95-007 RICH T. Hamacher Status Report.
95-006 RICH P. J. Weyers The Test-RICH Experiment.
95-005 RICH P. Krizan CsI Chamber Ageing Test Set-up.
95-004 Software A. Spiridonov Tracing of Particles in Inhomogeneous Magnetic Field.
95-003 VDET I. Abt et al. First Results from a Radiation Test of a 1.2 x 1.2 $cm^2$ Prototype Silicon Detector with a Special Guard Ring Structure.
95-002 Tracking M. Feuerstack Minutes of the TDC Meeting held at DESY, 25th of January, 1995.
95-001 Trigger H.-D. Schulz Minutes of the First Level Trigger Hardware Meeting, January 20th, 1995 in Mannheim.
94-164 Talks A. Spiridonov Track Reconstruction in TC1, TC2 Chambers of HERA-B Outer Tracker.
94-163 General W. Trischuk Diamond as a Charged Particle Detector.
94-162 Target C. Hast The Wire Target Test 1994 and Further Plans.
94-161 RICH A. Schwartz CsI RICH Results from KEK.
94-160 Tracking M. Walter Minutes of the Outer-Tracker Meetings, 29th and 30th November, 1994.
94-159 TRD B. Dolgoshein Transition Radiation Detector. Progress Report.
94-158 General J. Spengler Minutes of the Meeting of the Technical Board, November 29th, 1994.
94-157 DAQ J. Zweizig Minutes of DAQ/L2/FE Meeting, 1 Nov., 1994.
94-156 DAQ M. Feuerstack Minutes of Parallel Session on the Activities of the VMEbus Steering Comittee October 31, 1994.
94-155 Tracking M. Walter Minutes of the Tracking Subgroup Meeting, Oct. 31/Nov. 1, 1994.
94-154 Muon Yu. Zaitsev Minutes of the Muon Subgroup Meeting, Oct. 31, 1994 at DESY and Oct. 28, 1994 at ITEP.
94-153 Trigger M. Medinnis Minutes of the Level 2 Meeting, Oct. 31, 1994.
94-152 ECAL S. Shuvalov Minutes of the ECAL Section of HERA-B Meeting, October 31st, 1994.
94-151 General J. Spengler Minutes of the Meeting of the Technical Board, November 1st, 1994.
94-150 General J. Spengler Minutes of the HERA-B Meeting of Oct.31 and November 1, 1994.
94-149 Software P. J. Weyers About the HERA-B World Wide Web-Server.
94-148 Software M. Medinnis Some General Ideas about Software Requirements Specification.
94-147 General J. Spengler News from the HERA Optics.
94-146 General J.L. Rosen Northwestern Interest in HERA-B.
94-145 General C. Jiang BEijing Spectrometer (BES).
94-144 Electronics J. Christiansen Time to Digital Converter Developments in the Micro Electronics Group at CERN.
94-143 Software H. Albrecht and R. Mankel FORTRAN Programming Conventions for HERA-B offline software.
94-142 Software A. Spiridonov Bank Design for the HERA-B reconstruction program. (version 1.1)
94-141 General J. Spengler Protokoll der HERA-B Maschine. Koordinationsbesprechung. 10.10.94.
94-140 General P. Krizan et al. HERA-B, an experiment to study CP violation at the HERA proton ring using an internal target. (Publ. in: Nucl. Instr. and Meth. in Phys.Res. A 351(1994)111)
94-139 General J. Spengler Minutes of the Meeting of the Technical Board, October 7th, 1994.
94-138 Physics G. Bohm Maximum Likelihood Estimates of Asymmetries.
94-137 General J. Spengler Minutes of the Meeting of the Technical Board, September 13, 1994.
94-136 Muon S. Barsuk Summary of Recent Muon Pretrigger Studies. (Muon Group Meeting, 12.09.94)
94-135 Muon S. Semenov GEANT Study of Muon System. (Muon Group Meeting, 12.09.94)
94-134 Talks W. Hofmann HERA-B: An Experiment to Study CP Violation in Decays of B-Mesons Using an Internal Target in the HERA Proton Ring. (Talk given in at the Glasgower Conference, July 1994)
94-133 Talks W. Hofmann HERA-B: An Experiment to Study CP Violation in Decays of B-Mesons Using an Internal Target in the HERA Proton Ring. (Talk given in Rome, June 1994)
94-132 Physics C. S. Mishra Fixed Target Production and Decays of B Meson.
94-131 Muon Yu. Zaitsev News on the Muon System.
94-130 Tracking F. Eisele MSGC's vs. Pixels.
94-129 Tracking R. Mankel Track finding with gas Pixel Chambers.
94-128 RICH P. Krizan RICH - Status, Plans, Timetable.
94-127 General A. Schwarz Minutes of the HERA-B Meeting of September 12-13, 1994.
94-126 Trigger H.D. Schulz First Level Trigger Subdetector Group. (Minutes of the meeting in Mannheim on Sept. 8, 1994)
94-125 General A. Schwarz "Are we in Time?".
94-124 Magnet R. Eckmann First Step toward a design of the the compensation coil($e^-$ - beam).
94-123 Software S. Nowak H B GEAN.
94-122 VDET H. Albrecht New Geometry for the SVD.
94-121 TRD B. Dolgoshein Is Forward TRD usefull for e+ e- pretrigger.
94-120 ECAL S. Shuvalov Present Status of R & D for ECAL.
94-119 General J. Spengler [HERA-B] Control Panel.
94-118 Muon S. Semenov Muon Detection System. Status Report.
94-117 ECAL S. Shuvalov Present status of R & D for ECAL.
94-116 Tracking H. Kapitza Outer Tracker Layout Status.
94-115 RICH P. Krizan RICH Status Report.
94-114 General W. Zierold 3-D Computer Model for Detector Design.
94-113 General J. Spengler Geometry of HERA-p.
94-112 General J. Spengler Minutes of the Meeting of the Technical Board, August 9, 1994.
94-111 Trigger D. Reßing Minutes of the 1st Interconnection Meeting, August 9, 1994.
94-110 RICH P. Krizan Minutes of the RICH Subsystem Meeting, August 9, 1994.
94-109 Trigger M. Medinnis Minutes of the Level 2 Trigger Meeting, August 8, 1994.
94-108 General A. Schwarz Installation of Test Systems in the 1995/1996 Shutdown.
94-107 Software R. Mankel HERA-B Software Environment.
94-106 DAQ M. Feuerstack The proposed Test DAQ System.
94-105 General J. Spengler Status of the Detector layout and the magnet.
94-104 Trigger M. Danilov, P. Pakhlov Progress Report on B -> pi+ pi- Trigger.
94-103 General A. Schwarz Minutes of the HERA-B Meeting of August 8-9, 1994.
94-102 General J. Spengler Protokoll der HERA-B Maschine. Koordinationsbesprechung. 8.8.94.
94-101 General F. Willeke Protokoll der HERA-B Maschine. Koordinationsbesprechung. 5.5.94.
94-100 DAQ M. Feuerstack Minutes of the August 1-2 Meeting of the HERA-B Test Data Acquisition Group.
94-099 DAQ J. Tutas A Data Acquisition System for HERA-B.
94-098 VDET M. Medinnis An Alternative Design for the HERA-B Microvertex Detector.
94-097 General J. Spengler Protokoll der HERA-B Maschine. Koordinationsbesprechung. 8.7.94.
94-096 Trigger H.D. Schulz First Level Trigger Subdetector Group. (covering mainly the meeting in Mannheim on June 23,24 1994)
94-095 DAQ W. Hofmann Minutes of DAQ Group, 29.6.94.
94-094 Tracking M. Walter Minutes of Tracking Subgroup, 29.6.94.
94-093 DAQ M. Feuerstack Opening Discussion on the common test DAQ system for the HERA-B Experiment.
94-092 RICH P. Krizan Minutes of the RICH Subsystem Meeting, 28.6.94.
94-091 Software S. Nowak Material Density of the Detector (updated).
94-090 General A. Schwarz Organisation of Future Activities.
94-089 Physics W. Schmidt-Parzefall New Magnet Design and Slimmed down Detector Option.
94-088 Trigger P. Pakhlov Trigger for $B^0 -> \pi^+ \pi^-$.
94-087 RICH P. Krizan RIC Status Report.
94-086 General A. Schwarz Minutes of the HERA-B Meeting of June 28, 1994.
94-085 Physics Yu. Gershtein A Search for tau -> lll. (HERA-B Internal Note)
94-084 RICH P. J. Weyers Recent History of the RICH.
94-083 RICH A. Bulla Spherical Aberrations in the RICH.
94-082 Physics W. Schmidt-Parzefall Final Detector Optimization. Minimize Delay for Production!
94-081 General A. Schwarz Minutes of the HERA-B Meeting of June 1, 1994.
94-080 Talks J. Spengler An Experiment to Study CP Violation in the B System Using an Internal Target at the HERA Proton Ring.
94-079 Talks A. Schwarz Physics Aims of HERA-B.
94-078 General A. Schwarz Minutes of the HERA-B Meeting of April 11-12, 1994.
94-077 General J. Spengler Protokoll der HERA-B Maschine. Koordinationsbesprechung. 8.4.94.
94-076 Electronics N.N. Electronics at RAL. Integrated Circuits Designed byElectronics at RAL.
94-075 Tracking R. Bouclier et al. Ageing Studies with Micro-Strip Gas Chambers. CERNPPE/94.
94-074 RICH P. Krizan Rich Status Report.
94-073 ECAL A. Golutvin Electromagnetic Calorimeter for HERA-B.
94-072 Physics S. Nowak Material Density of the Detector.
94-071 General W. Hofmann Overview of the Proposal Status.
94-070 TRD V. Saveliev TRD Simulation Studies for HERA-B.
94-069 Muon Yu. Zaitsev The Status of the Muon System.
94-068 ECAL S. Shuvalov Electromagnetic Calorimeter.
94-067 Trigger H.-D. Schulz HERA-B First Level Trigger.
94-066 Physics A. Pose Tags Estimate in B - Events.
94-065 Physics W. Hofmann B Cross Sections.
94-064 General M. S. I. Kowitt et al. Charm and b Production in Fermilab E-789.
94-063 RICH P. Krizan RICH Status. Prototype. Monte-Carlo Studies.
94-062 Trigger J. Tutas $\mu$ - Data from H1(fwd $\mu$ - System).
94-061 General N. S. Lockyer Prospects for CP Violation at Fermilab. (Rencontres de Moriond)
94-060 General G. Carboni B Physics at the LHC. (XXIX Moriond Electroweak Meribel 1994)
94-059 General J. Spengler A B-Physics Exp. using an Internal Target in theHERA Proton Ring.
94-058 Software A. Spiridonov, R. Mankel, S. Nowak $K^0_s$ Reconstruction Performance.
94-057 Physics S. Nowak Influence of the Electron Beam Pipe.
94-056 Software R. Mankel, S. Nowak, A. Spiridonov Status of Track Reconstruction in the HERA-B Main Tracking System.
94-055 Electronics H. Leich Analog Read Out w/o Pipeline.
94-054 Electronics K.-T. Knöpfle RD20 Frontend Chips.
94-053 General W. Hofmann Status of the Proposal.
94-052 Electronics W. Hofmann Requirements for chips.
94-051 DAQ B. Hoffmann, P. Wegner WME-based DAQ-systems under Lynx OS.
94-050 DAQ B. Haynes HERA-B DAQ Architecture.
94-049 Tracking F. Eisele, P. Lennert First Ideas on a Backup Solution for HERA-B Inner Tracking.
94-048 Physics G. Bohm Maximum Likelihood Estimates of Asymmetries.
94-047 Physics G. Bohm Numerical Error Estimates.
94-046 Tracking G. Bohm Electrical Parameters of Straw's/ honeycombs.
94-045 General W. Schmidt-Parzefall HERA-B Status Report to the PRC Feb. 21-22, 1994.
94-044 Trigger N. N. CERN/DRDC/93-57. RD 21. Status Report.
94-043 Trigger J. G. Zweizig RD 21. Status Report.
94-042 Software A. Spiridonov Classification of the $K^0_s$ loss.
94-041 General W. Hofmann Report from the PRC February 21-22, 1994.
94-040 General A. Schwarz Minutes of the Meeting of February 22-23, 1994.
94-039 Tracking N. N. The Tracking System for HERA-B.(Feb. 11, 1994)
94-038 General T. C. Meyer The CMS Central Detector. A Tracking Concept for LHC.(1)
94-037 General T. C. Meyer C.M.S. A Compact Solenoidal Detector for L.H.C.(2)
94-036 Tracking T. C. Meyer Options.(3)
94-035 Tracking T. C. Meyer Simulation of Particle Tracking.(4)
94-034 General A. Schwarz A Closer Look at Hera-B.
94-033 Muon Yu. Zaitsev The Hera-B Muon System.
94-032 Trigger J. Tutas, D. Reßing HERA-B Detektor-Optimization for 1. LevelTrigger.
94-031 Tracking A. Spiridonov, R. Mankel, S. Nowak Efficiency of $K_s$ Vertex Reconstruction.
94-030 ECAL S. Shuvalov The Hera-B Calorimeter.
94-029 RICH G. Mocnik Particle Identification in the HERA-B Rich Detector.
94-028 Software T. Lohse Tracking Through Magnetic Field Maps.
94-027 VDET K.-T. Knöpfle Some Issues of the Silicon Vertex Detector (SVD).
94-026 General W. Hofmann Information from CERN.
94-025 TRD B. Dolgoshein Transition Radiation Tracker.
94-024 Physics G. Bohm Numerical Error Estimates on the CP ViolationAsymmetries.
94-023 General A. Schwarz Minutes of the Meeting of February 8-9, 1994.
94-022 ECAL J. Spengler Electron Identification: Review of Trigger Strategies.
94-021 General S. Nowak Material Thickness in the HERA-B Detector.
94-020 RICH P. Krizan Kaon Identification - Monte Carlo Studies.
94-019 General W. Hofmann Layout of Hera-B Proposal.
94-018 General W. Hofmann Layout of PRC Talk.
94-017 ECAL A. Golutvin Electron Identification: Calorimeter Design and Hardware.
94-016 Physics G. Bohm Appendix to note of 10.1.94.
94-015 General A. Schwarz, J. Spengler Minutes of the Meeting of January 24-25, 1994.
94-014 Trigger P. Wegner LVL Trigger Implementation.
94-013 Tracking M. Walter Hardware Aspects of Tracker, TRD.
94-012 Trigger H.-D. Schulz First Level Trigger.
94-011 RICH W. Schmidt-Parzefall Status of a PM Detector for the RICH.
94-010 Software S. Nowak GEANT Implementation of Tracking.
94-009 Software R. Mankel, S. Nowak Status of Main Tracker PatternRecognition.
94-008 Trigger H. Leich LVL-2 Trigger Hardware.
94-007 General W. Hofmann Possible Outline of PRC Presentation onFeb. 21-22, 1994.
94-006 RICH T. Hamacher RICH Test Setup.
94-005 Physics G. Bohm Maximum Likelihood Estimates of Asymmetries.
94-004 Physics G. Bohm Numerical Estimates of Asymmetries.
94-003 Tracking H. Albrecht Decisions on Tracking Design.
94-002 Tracking H. Albrecht Conceptual Design of the HERA-B Tracking System.
94-001 General A. Schwarz Minutes of the Meeting of January 10-11, 1994.
93-064 Tracking M. Walter Tracker - TRD/Tracker. Considerations.
93-063 Trigger A. Snizhko Status of an Electron Trigger for HERA-B. Timing.Simulation.
93-062 ECAL S. Shuvalov HERA-B Calorimetry: where we are?Status Report.
93-061 Trigger H.-D. Schulz Fundamentals of FLT - Tracking Performance.
93-060 Software S. Nowak Tracker Status + MC.
93-059 Software R. Mankel Track Reconstruction at small Radii, using $\mu$ strip-gaschambers.
93-058 Tracking T. Lohse Resolution and Stereo-Angles.
93-057 Tracking F. Eisele Conceptual Layout of inner Tracking System with MSGC'S.
93-056 Physics G. Bohm Errors of asymmetry measurements.(based on earlier work + discussions).
93-055 Tracking M. Walter News on Scintillating Fiber Trackers.
93-054 Tracking M. Walter Occupancy and Multihit Problems vs. Gas Track Detectors.
93-053 Target J. Spengler Wire Measurements '93.
93-052 Trigger A. Snizhko Status of an Electron Trigger for HERA-B.
93-051 Target J. Rieling The DC's in HERA-B Target Test Set up.
93-050 Software R. Mankel Status of Tracking Software Development in Zeuthen.
93-049 RICH P. Krizan RI\v C - Status.
93-048 Physics G. Bohm Integral Asymmetries.
93-047 Muon Yu. Zaitsev Muon Chambers for HERA-B.
93-046 Tracking M. Walter Influence of Gas-$\mu$-Strip or Si-det. in Inner Track.Reg. on Part.Multipl.
93-045 ECAL J. Spengler $e^{+-}$- Identification with ECAL.
93-044 Software M. Spahn Track and Vertex Reconstruction with the HERA-B SiliconVertex Det.
93-043 General W. Schmidt-Parzefall Mixed Topics.
93-042 Tracking A. Romaniouk Kapton Straw Proport. Chambers for TRD inHigh Counting Rate Exp.
93-041 Tracking A. Pose Occupancy Distribution in Straw Chambers.
93-040 Target K. Ehret Status and Preliminary Results of Wiretest Measurements.
93-039 TRD B. Dolgoshein TRD Project for HERA-B.
93-038 Software M. Spahn 3-d Reconstruction with the Silicon Tracker.
93-037 Trigger H.-D. Schulz Electron Identification for the first-level Trigger.
93-036 Software R. Mankel Status of Pattern Recognition for the HERA-b StrawChambers.
93-035 Software T. Lohse Vertex Fits.
93-034 Target W. Hofmann A-Dependences and Choice of Target-A.
93-033 General M. Walter "Summary" of the Workshop on B Physicsat Hadron Accelerators.
93-032 General M. Walter HERA-Workshop.
93-031 General W. Schmidt-Parzefall Some Interested Plots presented at Snowmass.
93-030 TRD V. Saveliev Structure of TRD (towers structure).
93-029 Physics O. Mai Meas. of $B^0_s \overline{B^0_s}$ Oscill.at HERA-Bin the Channel $B^0_s -> D^{(*)}_s \ell^+ \nu$.
93-028 Physics Yu. Zaitsev Double $J/\Psi$ Production: a Probe of Gluon Polarization.
93-027 Trigger P. Wegner Transputer-C40 Configuration for eff. mass calculations.
93-026 TRD M. Walter TRD - News.
93-025 Physics W. Schmidt-Parzefall Add Physics.
93-024 ECAL J. Spengler $e^{+-}$ - Trigger - Ecal.
93-023 General M. Reber STATUS of the Experimental Program.
93-022 DAQ H. Leich Serial Data Link Implementation.
93-021 DAQ W. Hofmann DAQ System.
93-020 TRD S. Besfamilnov et al. Transition Radiation Detectors for HERA-B Experiment.
93-019 Software P. Pakhlov Pattern Recognition within one superlayer.
93-018 General S. Nowak Memory Note.
93-017 Target T. Lohse 1992 HERA Tests.
93-016 Trigger T. Lohse Design of the Level-1 Trigger.
93-015 RICH P. Krizan. CsI related activities in Ljubljana (Status Report).
93-014 VDET K.-T. Knöpfle. Radiation Damage to Silicon Microstrip Detectors.
93-013 General W. Hofmann Report on Progress Report.
93-012 General T. Lohse Minutes of the Meeting of 19.4.93.
93-011 Physics M. Walter Acceptance Study of $B \overline{B}$ - events withGeant.
93-010 ECAL J. Spengler Calorimeter Studies. Part I.
93-009 General W. Schmidt-Parzefall Site, Magnet, Layout, Tracking.
93-008 RICH P. Krizan Rich - Status Report: Radiator Choice.Det. Geometry. Test Measurements.
93-007 Trigger I. Belyaev The Simulation of the First Level Trigger forHERA-B Detector.
93-006 General W. Schmidt-Parzefall Minutes of the HERA-B Meeting of 15.2.93
93-005 Physics M. Walter Geant Results: Detection of pCU $->B \overline{B} + X$.
93-004 VDET M. Spahn Silicon Detector Simulation Update.
93-003 Trigger H.-D. Schulz Trigger Status.
93-002 Physics G. Bohm ML Estimates.
93-001 Trigger I. Belyaev First Level Trigger.

Script last changed Jan-31-00 by Stefan Steinbeck